SALIENT FEATURES
Pred
Project name Betan Karnali PROR Hydroelectric Project
Surkhet District, Karnali Province & Accham
Location District, Sudurpashcim Province
Co-ordinates of the Project area 28°50'57” N to 28°56'04" N Latitude,
81°11'43” € to 81°24'42” E Longitude
Nearest Highway Karnali Highway
Nearest Airport Surkhet Airport: 160 km from project site
Nepalgunj Airport - 260 km from project site
River karnali
Climate Moderate
‘Type of project, Peaking Run-of-the-river (PROR)
ree
Betan Karnali Sanchayakarta Hydropower
Developer Company Ltd.
Consultant NEA Engineering Company Ltd.
a
Catchment area 22,511.25 km?
Mean annual flow 554.13 m/s
Maximum Monthly Discharge 1609.49 m/s
Minimum Monthly Discharge 134.61 m/s
‘Lin 100 years flood (Qicc) 8,530 m?/s
Lin 1000 years flood (Qioo) 11,548 m/s
iin 10,000 years flood (Quo.coo) 14,569 m*/s
Probable Maximum Flood (Qo) 22,604 m/s
es
Gross storage volume 161.69 Mm?
Live storage volume upto 870 mas! 36.19 Mm?
Surface area at FSL 5.25 km?
Length of Reservoir at FSL 21.9 km
Dry Season Full Supply Level 473.3 masl
Wet Season operation level 470 masl
Js [iveroverion wens
Diversion Discharge 2,400 m?/s
Number of Tunnels 2Nos.
Size and Shape 9.8 m diameter horseshoe
Length 536.90 m & 646.57 m
4400.0 masl & 394 masl( Diversion Tunnel-t)
400.5 mas! and 393.5 mas! (Diversion Tunnel-2)
Inlet and Outlet Level
Betan Karnali HEP | Final Draft Report | July 2020 Pagelix&
DRAFT
‘Type of Dam
Lining Reinforced Concrete Lining
U/S Cofferdam
Type & Location | __RCC (Permanent), 155 m u/s from Dam axis,
Height 40.50 m
Crest Level 431.30 masl
D/S Cofferdam
ype & Location | Embankment Dam (Temp), 35 m d/s from Darn
axis
Height 17.50 m
Crest Level 405.61 mas!
Roller Compacted Concrete (RCC)
Location of Dam_
‘Approx. 2.0 km D/S from Malbela
Dam length at top
197.3m
or sy
Dam Height 91m from Riverbed
Dam Height 1140 m from Foundation Bed
Top Width 10.00
Dam Top elevation 480.00 mas!
Overflow Spillway
Type Ogee and gated
Crest elevation 462 mas!
Number and size of gates 6 nos, 11 mx 12 m (BX H)
Energy Dissipation Flip Bucket
Sluice Spillway
Type Sluice
Crest elevation 418 masl
Number and 6 nos. 7mx8m (BX H)
Energy Dissipation Flip Bucket
Auxiliary Spillway
Type Ogee
Crest elevation 469 masl
Number and Size
1nos.,8mx5m
Energy Dis
com
A ‘Main Power Intake
Flip Bucket
‘Type of Intake
Side intake
Number and Size of Trashrack
openings
9 Nos., 5.9 m x 17.2 m (BX H))
Number and Size of Intake Gate
3 Nos,, 8mx8m (XH)
Dry Season Design Discharge
536 m/s
Betan Karnali HEP | Final Draft Report | July 2020
Page |xay
Ey
é
DRAFT
Wet Season Design Discharge 551.37 m'/s
Invert Level 450 mas!
Deck Level 480 mas!
Trash rack Inclined at 75° with horizontal
8 For Environment Release PH
Type of intake Embedded in dam
Number and Size of Trashrack 2 Nos, 2.60 m «4.00 m (Bx)
opening
Number and size of Intake Gates 2Nos,2mx2m
Invert Level 460 mas!
Design Discharge 13.48 m/s
Trash Rack Vertical
Ps [edad
Number 3 nos.
Size and Shape 8m Diameter Circular shape
Length 2017.24 m, 2011.15 m, 2017.39 m
ining | 400 mm thick Reinforced Concrete Circular Lining
Design Velocity 3.56 m/s
Maximum velocity 3.66 m/s
Type Restricted Orifice
Number 3 nos
Diameter 24
Height 5
7
Number 3 nos
Orientation Vertical and horizontal
Diameter | 7 dlameter circular (main), 4.95 m (after
bifurcation)
ining Stee! Lining
| 12 _| Environment Unit Penstock
Type Surface & steel
Number 2.00
Diameter 14m
Length 104.74 m
is [rows |
A ‘Main Powerhouse
Coordinate 8191448" E, 28°555" N
Type Underground Type
Installed Capacity 431.6 MW
Powerhouse Size 202 mX 23.5 mX54.71 m(LXBXH)
Betan Karnali HEP | Final Draft Report | July 2020 PagelxiDRAFT
Number and capacity of units 6 nos x 71.64 MW
Type of Turbine Francis, Vertical Axis
Normal Tail water level 374.16 masl
Gross Head 99.13 m
Net Head at FSL. 94,07 m
Net head at MOL 90.48 m
Machine Floor Level 379.51 masl
Generator Floor Level 375.61 masl
‘Turbine Floor Level 371.85 masl
Turbine Centre Line Level 369.16 mas!
Environmental Powerhouse
Type Surface Toe of Dam
Installed Capacity 8.77 MW
PH Size 22. mX 10.6 mX 23 m (LX BX H)
Number and capacity of units
2 nos x 4.67 MW
‘Type of Turbine
Francis, Horizontal Axis
eee
Normal Tail water level 395 mas!
Gross Head 78.30m
Rated Net Head 76.50m
6 nos before downstream surge shaft and 3 nos
fone
Size and Shape
Number after downstream surge shaft
Size and Shape | __ 6.5m diameter leading to 10 m diameter
Sas
Number 2
Size 72mX15 m 18.1 m (LXBXH)
Trapezoidal Channel
Length 114.88 m at centreline
‘Width 100m
es
Wet Season Energy 1608.65 GWh/yr
Dry Season Peak Energy 458.27 GWh/yr
Dry Season Off Peak Eneray 730.68 GWh/yr
Dry Season Total Energy 690.93 GWh/yr
Total annual enerey 2297.60 GWh
pees
Connection Length
5 km approx.
Voltage
400 kV
ay
Ey
é
Betan Karnali HEP | Final Draft Report | July 2020
Page|xiiay
Ey
é
DRAFT
Exchange rate (LUSS = NRs. 119)
Infrastructure Development Works 1,605,701,941 NRs.
Land and Support 2,252,890,000 NRs.
Project Management Cost 754,000,000 NRs.
Civil works 46,556,753,752 NRs.
Electro-mechanical works 13,054,646,000 NRs.
Hydro-mechanical works 6,818,729,852 NRs.
Total Project Cost (before IDC) 78,514,285,066 NRs.
Total financial Cost (after IDC) 93,794,285,834 NRs.
Specific project cost (financial) 213,839,509 NRs. /MW
Specific project cost (financial) 1,796,971 USD/MW
a
Interest rate 11.00%
IRR (11.38%
EIRR/ROE (Return on Equity) 15.49%
NPV 10,064,617,000 NRs.
B/C 1.10
Betan Karnali HEP | Final Draft Report | July 2020 Page|xiii