You are on page 1of 5
ay Ey é DRAFT SALIENT FEATURES Pred Project name Betan Karnali PROR Hydroelectric Project Surkhet District, Karnali Province & Accham Location District, Sudurpashcim Province Co-ordinates of the Project area 28°50'57” N to 28°56'04" N Latitude, 81°11'43” € to 81°24'42” E Longitude Nearest Highway Karnali Highway Nearest Airport Surkhet Airport: 160 km from project site Nepalgunj Airport - 260 km from project site River karnali Climate Moderate ‘Type of project, Peaking Run-of-the-river (PROR) ree Betan Karnali Sanchayakarta Hydropower Developer Company Ltd. Consultant NEA Engineering Company Ltd. a Catchment area 22,511.25 km? Mean annual flow 554.13 m/s Maximum Monthly Discharge 1609.49 m/s Minimum Monthly Discharge 134.61 m/s ‘Lin 100 years flood (Qicc) 8,530 m?/s Lin 1000 years flood (Qioo) 11,548 m/s iin 10,000 years flood (Quo.coo) 14,569 m*/s Probable Maximum Flood (Qo) 22,604 m/s es Gross storage volume 161.69 Mm? Live storage volume upto 870 mas! 36.19 Mm? Surface area at FSL 5.25 km? Length of Reservoir at FSL 21.9 km Dry Season Full Supply Level 473.3 masl Wet Season operation level 470 masl Js [iveroverion wens Diversion Discharge 2,400 m?/s Number of Tunnels 2Nos. Size and Shape 9.8 m diameter horseshoe Length 536.90 m & 646.57 m 4400.0 masl & 394 masl( Diversion Tunnel-t) 400.5 mas! and 393.5 mas! (Diversion Tunnel-2) Inlet and Outlet Level Betan Karnali HEP | Final Draft Report | July 2020 Pagelix & DRAFT ‘Type of Dam Lining Reinforced Concrete Lining U/S Cofferdam Type & Location | __RCC (Permanent), 155 m u/s from Dam axis, Height 40.50 m Crest Level 431.30 masl D/S Cofferdam ype & Location | Embankment Dam (Temp), 35 m d/s from Darn axis Height 17.50 m Crest Level 405.61 mas! Roller Compacted Concrete (RCC) Location of Dam_ ‘Approx. 2.0 km D/S from Malbela Dam length at top 197.3m or sy Dam Height 91m from Riverbed Dam Height 1140 m from Foundation Bed Top Width 10.00 Dam Top elevation 480.00 mas! Overflow Spillway Type Ogee and gated Crest elevation 462 mas! Number and size of gates 6 nos, 11 mx 12 m (BX H) Energy Dissipation Flip Bucket Sluice Spillway Type Sluice Crest elevation 418 masl Number and 6 nos. 7mx8m (BX H) Energy Dissipation Flip Bucket Auxiliary Spillway Type Ogee Crest elevation 469 masl Number and Size 1nos.,8mx5m Energy Dis com A ‘Main Power Intake Flip Bucket ‘Type of Intake Side intake Number and Size of Trashrack openings 9 Nos., 5.9 m x 17.2 m (BX H)) Number and Size of Intake Gate 3 Nos,, 8mx8m (XH) Dry Season Design Discharge 536 m/s Betan Karnali HEP | Final Draft Report | July 2020 Page |x ay Ey é DRAFT Wet Season Design Discharge 551.37 m'/s Invert Level 450 mas! Deck Level 480 mas! Trash rack Inclined at 75° with horizontal 8 For Environment Release PH Type of intake Embedded in dam Number and Size of Trashrack 2 Nos, 2.60 m «4.00 m (Bx) opening Number and size of Intake Gates 2Nos,2mx2m Invert Level 460 mas! Design Discharge 13.48 m/s Trash Rack Vertical Ps [edad Number 3 nos. Size and Shape 8m Diameter Circular shape Length 2017.24 m, 2011.15 m, 2017.39 m ining | 400 mm thick Reinforced Concrete Circular Lining Design Velocity 3.56 m/s Maximum velocity 3.66 m/s Type Restricted Orifice Number 3 nos Diameter 24 Height 5 7 Number 3 nos Orientation Vertical and horizontal Diameter | 7 dlameter circular (main), 4.95 m (after bifurcation) ining Stee! Lining | 12 _| Environment Unit Penstock Type Surface & steel Number 2.00 Diameter 14m Length 104.74 m is [rows | A ‘Main Powerhouse Coordinate 8191448" E, 28°555" N Type Underground Type Installed Capacity 431.6 MW Powerhouse Size 202 mX 23.5 mX54.71 m(LXBXH) Betan Karnali HEP | Final Draft Report | July 2020 Pagelxi DRAFT Number and capacity of units 6 nos x 71.64 MW Type of Turbine Francis, Vertical Axis Normal Tail water level 374.16 masl Gross Head 99.13 m Net Head at FSL. 94,07 m Net head at MOL 90.48 m Machine Floor Level 379.51 masl Generator Floor Level 375.61 masl ‘Turbine Floor Level 371.85 masl Turbine Centre Line Level 369.16 mas! Environmental Powerhouse Type Surface Toe of Dam Installed Capacity 8.77 MW PH Size 22. mX 10.6 mX 23 m (LX BX H) Number and capacity of units 2 nos x 4.67 MW ‘Type of Turbine Francis, Horizontal Axis eee Normal Tail water level 395 mas! Gross Head 78.30m Rated Net Head 76.50m 6 nos before downstream surge shaft and 3 nos fone Size and Shape Number after downstream surge shaft Size and Shape | __ 6.5m diameter leading to 10 m diameter Sas Number 2 Size 72mX15 m 18.1 m (LXBXH) Trapezoidal Channel Length 114.88 m at centreline ‘Width 100m es Wet Season Energy 1608.65 GWh/yr Dry Season Peak Energy 458.27 GWh/yr Dry Season Off Peak Eneray 730.68 GWh/yr Dry Season Total Energy 690.93 GWh/yr Total annual enerey 2297.60 GWh pees Connection Length 5 km approx. Voltage 400 kV ay Ey é Betan Karnali HEP | Final Draft Report | July 2020 Page|xii ay Ey é DRAFT Exchange rate (LUSS = NRs. 119) Infrastructure Development Works 1,605,701,941 NRs. Land and Support 2,252,890,000 NRs. Project Management Cost 754,000,000 NRs. Civil works 46,556,753,752 NRs. Electro-mechanical works 13,054,646,000 NRs. Hydro-mechanical works 6,818,729,852 NRs. Total Project Cost (before IDC) 78,514,285,066 NRs. Total financial Cost (after IDC) 93,794,285,834 NRs. Specific project cost (financial) 213,839,509 NRs. /MW Specific project cost (financial) 1,796,971 USD/MW a Interest rate 11.00% IRR (11.38% EIRR/ROE (Return on Equity) 15.49% NPV 10,064,617,000 NRs. B/C 1.10 Betan Karnali HEP | Final Draft Report | July 2020 Page|xiii

You might also like