CHAPTER 7 INSTALLATION

7.1 Installation procedures ................................................................................................................1


7.1.1 Initial Operation Sequence ......................................................................................1

7.2 SNCS Settings ............................................................................................................................1

XP Series S/M November 2012


CHAPTER 7 INSTALLATION

7.1 Installation procedures

Refer to Instructions for Use (Chapter 5: Initial Operation) for unpacking, installation and initial setup
procedures at time of delivery.

7.1.1 Initial Operation Sequence


Start the instrument using Hot Start and follow the procedures described below.

(1) Run the initial operation sequence.


Select [Service] -> [Service Seq.] -> [Setting Seq.].
For details of the program, refer to XP Series Service Manual (Chapter 5: Service Program).

(2) If necessary, set the date.


Select [Settings] -> [Date/Time].
For details of the program, refer to Instructions for Use (Chapter 11: Instrument Setup).

(3) Reset cycle counter.


Select [Service] -> [Settings] -> [Initialize] -> [Cycle Counter].
For details of the program, refer to XP Series Service Manual (Chapter 5: Service Program).

Note: When resetting the cycle counter, the date that maintenance was last performed will also be reset.
Therefore, set the date first before resetting the cycle counter.

7.2 SNCS Settings


For how to set SNCS settings, refer to the following documents.
• XP Series Service Manual Chapter 5: [5.9 SNCS Settings].
• SNCS Service Manual

201297: The entire page has been revised.