ppd ESailsually Gobi gSi) oY glSal oljLodly Gaal BAHRAIN & EMIRATES ELECTRICAL & MECHANICAL CONTRACTING LLC ABU DHABI GO/128/SUP/CON/068 4" August, 2020 SUB-CONTRACT AGREEMENT CONFIRMED ORDER M/s Yazdan AJC Unit Fixing & Contracting P.O, Box: 35815 Dubai, UAE Tel: +971 506555385 For the attention of: Mr. Muhammad Ashraf Sales Manager Shamal Mid-Rise Residential Building, Plot No. JVC14G MRP004 Dubai, UAE Installation, Testing and Commissioning of AC Units Complete with Copper piping, insulation, pressure testing with all accessories —Rev.00 This has reference to the above subject and following correspondences we had with you on subject, © Your quotation email dated 29" July, 2020 & Final Price negotiated with Mr. Bashar: We are pleased to place our Confirmed Order - Sub-Contract Agreement for the Installation, Testing and Commissioning of AC Units Complete with all accessories as under. 1. SCOPE OF SUPPL As per Annexure I (BOQ), Annexure-II (Scope Of Works) 2 PRIC) The lump sum price for Installation, Testing and Commissioning of AC Units Complete with all accessories on skilled manpower deployed at site basis shall be AED 113,750.00 (UAE Dirhams One Hundred Thirteen Thousand Seven Hundred Fifty Only) ‘The rate mentioned is fixed and shall not vary on any account. By Unit rates will be applicable for the amount of work certified by the oa BEMCO site management. “The unit rates mentioned above is fixed and shali.not Gi “ABU DHABI G0/128/SUP/CON/068 4" August, 2020 3, DEPLOYMENT: Your team should be deployed immediately ftom the date of this confirmed order, The site is ready for deployment for your manpower and installation. Loading / un-loading, shifting/ lifting of any material related to duct installation at site will be carried out by M/s Yazdan A/C Unit Fixing & Contracting BEMCO will assist by providing helpers. BEMCO will assist you to provide tower crane from the main contractor to lift the heavy material, however, manpower for loading, unloading and shifting the material will be provided by M/s Yazdan A/C Unit Fixing & Contracting, 4. PAYMENT TERMS: Payment shall be as below: ‘© 5% Advance on signing the Contract after one week subject to quality of works at site © Balance progressive payment as per the price break up given in BOQ. ¢ BEMCO will pay for the work approved by the consultant / client. 5. VARIATION ORDERS: The amount mentioned in clause no. 2 is lumpsum contract and no variation will be accepted. The agreed price is inclusive of Installation, Testing and Commissioning of the complete works related to AC units. No variation will be acceptable if any changes! modification will be done during, before and after the commencement of the project. However, in the event of Super Fast Central Air-Conditioner Workshop's scope of work is decreased or increased, such change shall be evidenced by a written Variation Order, and the increase or decrease shall be set out in a Variation Order. BEMCO shall not be liable for any Iabour, materials, expenses, services or other items which M/s Yazdan A/C Unit Fixing & Contracting provides or agrees to provide without BEMCO’s prior written consent. All variation orders are to go through BEMCO first, or BEMCO will not pay for such changes. i) ABU DHABI ‘GO/128/SUP/CON/068 4" August, 2020 BEMCO and Mis Yazdan A/C Unit Fixing & Contracting agree that BEMCO shall not be liable for any amount greater than the amount proposed, unless through a variation order as outlined above. Except with BEMCO’s prior, written consent, M/s Yazdan A/C Unit Fixing & Contracting shall not enter into any separate or direct agreements with any customer of BEMCO during construction or within one year after closing by the customer and BEMCO, or payment in full by the customer to BEMCO, whichever is later. 6. DEFAULT: If Mls Yazdan A/C Unit Fixing & Contracting breaches this agreement, BEMCO has the tight, upon written notice to M/s Yazdan A/C Unit Fixing & Contracting , to terminate this agreement. Upon receipt of written notice, M/s Yazdan A/C Unit Fixing & Contracting shall cease all further work. BEMCO has the right to hire other subcontractors and suppliers to complete the work and no payment shall be due to M/s Yazdan A/C Unit Fixing & Contracting until the work is completed. All cost incurred in completing M/s Yazdan A/C Unit Fixing & Contracting work shall be deducted from the amount due M/s Yazdan A/C Unit Fixing & Contracting. You shall be liable to BEMCO for all damages arising out of or relating to Subcontractor’s breach of this agreement. 7. DRUG/ALCOHOL USE: Mls Yazdan A/C Unit Fixing & Contracting will ensure that its employees and others within M/s Yazdan A/C Unit Fixing & Contracting control, who are present on the job sites will be free of alcohol and other mind-altering substances, including all controlled substances. 8. SAFETY PRACTICES: M/s Yazdan A/C Unit Fixing & Contracting will comply with standard safety practices and any other requirements applicable to M/s Yazdan A/C Unit Fixing & Contracting scope of work. Any fines based M/s Yazdan AJC Unit Fixing & Contracting safety violations which are assessed against BEMCO shall be offset against any amounts due to M/s Yazdan A/C Unit Fixing & Contracting. Gi ‘ABU DHABI GOVI28/SUP/CONTO6S 4* August, 2020 % 10. i, 12 113 ALS 11.6 SUB-CONTRACTING WORKS: Mis Yardan A/C Unit Fixing & Contracting shall not appoint any subcontractor for this job without taking a written approval from BEMCO. VALIDIT The validity of price will be till end of project GENERAL CONDITION OF SUBCONTRACT AGREEMENT: ‘The Subcontract works for installation of AC units shall be in full compliance with our Consultant Document and authority requirements viz: Specifications, Drawings, BOQ, Financial approval etc., along with the site conditions you have duly acquainted yourself. The works shall be executed to the complete satisfaction and approval of the FIRST PARTY (BEMCO-Abu Dhabi, the Consultant and/or Client) as, is applicable The execution program of your scope of work shall match the overall work program as approved by the First Party & Authority. The current tentative work program shall serve only as a guideline for completion of the Main Contract Work. Mls Yazdan A/C Unit Fixing & Contracting shall insure against accident(s) of all its workmen on site and shall continue such insurance during the whole time that any person(s) is employed by you on the work(s). Mis Yazdan A/C Unit Fixing & Contracting is responsible to remove the debris resulting from his work during the whole duration of the execution of his scope of work Unless it is legally or physically impossible, M/s Yazdan A/C Unit Fixing & Contracting shall execute and complete the works and remedy Party. any defects therein in strict compliance with the Subcontract to the satisfaction of the First, All tools. equipment, materials, safety equipment, etc., shall be provided by Yazdan A/C Unit Fixing & Contracting to complete this work oi ‘ABU DHABI GO/128/SUP/CON/068 4" August, 2020 117 12.2 123 12.4 No direct works shall be taken by you for this project from the main contractor/ consultant or client representative without our prior approval or else it shall be considered breach of contract & termination of the contract. SPECIAL CONDITIONS & RESPONSIBILITIES: In case of diserepaney between the BEMCO-Abu Dhabi’s Contract Documents and M/s Yazdan A/C Unit Fixing & Contracting quotation in terms of technical specification, then the BEMCO-Abu Dhabi’s decision shall prevail; On the other hand, the execution of works shall be as recommended by the Consultant. Mis Yazdan A/C Unit Fixing & Contracting is responsible to appoint sufficient skilled staff as requested and subject to th approval of the First Party. The qualification of the staff shall be subject to the approval of the First Party. Only works that are approved by the Main Contractor shall be Paid. Any rejected inspection and/or prematurely submitted inspection which may result in any cost and/or time impact shall be mitigated and corrective measures shall be taken by M/s Yazdan A/C Unit Fixing & Contracting, Cost of which shall be borne by you. Failure to do so, the Contractor may appoint another sub-contractor to perform the outstanding works, cost of which shall be charged to M/s. Yazdan A/C Unit Fixing & Contracting. - oi ABU DHABI GO/128/SUP/CON/068 4" August, 2020 Please confirm your acceptance of this Confirmed Order in next two working Daye, failure to which will be considered as accepted in totality In case of any clarification, please feel free to contact Mr. Paresh or Mr. Shahid on +971 2 6229462. ‘Thank you. Yours faithfully. BEMCO-Abu Dhabi Authorized Signa We hereby comply and accept the above Confirmed Order for Subcontractor Agreement Mis Yazdan A/C Unit Fixing & Contracting BEMCO} ABUDHAB! _TRN:10003070980003 GO/128/SUP/CON/068 4" August, 2020 ANNEXURE I BILL OF QUANITIES No. Description Qty. | Unit [ Rate | Amount | [1 [installation of Copper piping &| 175.| Nos | 680.00 | 113,750.00 | | condensate drain pipe complete with insulation, support and connecting to the indoor and out | door AC units complete with | Nitrogen Pressure testing, | vaccume and refrigerant gas | charging and commissioning of | | all AC units as per detail scope of | work described in Annexure-UI | TOTAL AMOUNT IN AED 113,750.00 | [1 (UAE Dirhams One Hundred Thirteen Thousand Seven Hundred Fifty Only) | Fe PRICE BREAK UP FOR BILLING No. | Description _| Qty. | Unit [Rate [Amount 1 1 T 1 [Installation and pressure testing! 175 | Nos | 300.00 | 52,500.00 | of copper piping complete with | | | insulation. 2 | Connection of Copper pipe with | 175 | Nos | 50.00 | 8750.00 | Indoor AC unit | | 3 | Connection of Copper pipe with] 173 | Nos | 30.00 | 8750.00 Outdoor AC unit | 4 | Installation of UPVC Condensate] 175 | Nos | 50.00 | 8,750.00 drain pipe complete with | insulation. | 5 | Vaccume, Reftigerent Gas| 175 | Nos | 200.00 | 35,000.00 | Charging and commissioning of | | AC unit tl a a (6 | Total Amount I 650.00 | 113,750.00 Gi) ABU DHABI R GO/128/SUP/CON/068 4" August, 2020 ANNEXURE II SCOPE OF WORKS 1, Installation of AC Indoor and outdoor unit (Decorative Split AC units, Ducted Split AC unit with condensing unit) will be carried out by BEMCO. 2. Installation of complete Refrigerant Piping with supports, insulation, applying canvass cloth and lagging & Adhesive as per project requirement. 3. Installation of Refrigerant Pipe accessories like angie valves, dryer, sight glass, if any. 4, Installation of Refrigerant Pipe supports (either on Cable Tray/ Cable Ladder / Channel or Angle) as per project requirement. 5. Installation of UPVC Condensate drain Pipe with Insulation. 6. M/s. Yazdan A/C Unit Fixing é& Contracting will provide Nitrogen Gas for Pressure Testing & Pipe Flushing, Brazing rods (Copper Silver as per site requirement), Brazing set and Oxygen/ Acetylene gas for brazing of refrigerant pipes. a M/s. Yazdan A/C Unit Fixing & Contracting will bring their own tools (power and hand tools with consumables), PPE, ladders ete. 8. M/s. Yazdan A/C Unit Fixing & Contracting will bring vaccume pump to do vaccume of each system as per requirement before refrigerant gas charging. 9. It is responsibility of M/s, Yazdan A/C Unit Fixing & Contracting to enable the system complete with Pressure Test, Flushing with Nitrogen and keep the system ready for Commissioning 10. Electrical termination with indoor and out door units will be carried out by BEMCO and upon availability of power M/s. Yazdan A/C Unit Fixing & Contracting will commission all the AC units. Refrigerent gas for the commissioning will be provided by BEMCO. 11.BEMCO will provide material like AC units, Pipe Insulation, Canvass Cloth, Lagging and Adhesive, Copper Refrigerant Pipes.

You might also like