You are on page 1of 78

DAFTAR PESERTA UJIAN EPS TOPIK LOKASI JAKARTA

SISTEM POIN SEKTOR MANUFAKTUR GELOMBANG 2 (DUA)

TAHUN 2020 TOTAL PESERTA 3.716 ORANG

※ Untuk mencegah penyebaran virus COVID-19, peserta ujian tahap 1 yang suhu tubuhnya mencapai 37.5 derajat Celcius atau lebih tidak
diperbolehkan mengikuti ujian CBT tahap 1 dan akan dialihkan ke ujian yang selanjutnya

SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1 50614068 FARIANDO ROYHAN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

2 50611240 UTAMI ENI F Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

3 50612235 SUHARNO M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

4 50612841 GHIFFARY MUHAMMAD AL M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

5 50613026 HIDAYAH FAHRI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

6 50611526 APIP ALVIN CAHYA M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

7 50614129 Y GINA AGUSTINA F Manufacturing > Wood joinery CBT Test room-Indonesia 20210302 1st (10:00)

8 50611748 MUSLIM M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

9 50611825 FAISAL AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

10 50612752 FARIKHIN MOHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

11 50613039 KISARATAMA YUDHA M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

12 50612264 HANDAYANI DWI F Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

13 50611707 HIDAYAT FIRMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

14 50611921 HIDAYAT MIFTAKHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

15 50612656 AWALUDIN MUHAMAD AMIN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

16 50610815 TOPIK MOHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

17 50613141 NOPRIYANTO SYAHRI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

18 50613948 INDIANI NI NYOMAN F Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

19 50613343 SIANTURI PUTRI HARYATI BR F Manufacturing > Measures CBT Test room-Indonesia 20210302 1st (10:00)

20 50611132 NURJAMIL FAISAL M Manufacturing > Wood joinery CBT Test room-Indonesia 20210302 1st (10:00)

21 50610905 RISWANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

22 50612908 MUTAQIM ANAS M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

23 50614017 APRILIYANTO BAYU M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

24 50612514 ROHMAT M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

25 50612559 UMAMI RISKI F Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

26 50613147 ABDILLAH MUWAFIQ M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

27 50613666 MUHADISYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

28 50610961 FEBRIYANTO TUBAR M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

29 50613297 PRIONO EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)
NAINGGOLAN JUANDI
30 50613865 M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)
MONTELLA
31 50614087 HENDRIK M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

32 50613439 PUTRA TRIZAL M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

33 50613628 ERMANTO EDI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

34 50614354 WARDOYO M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

35 50613981 ASRORI HARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

36 50614236 PURWANTO JOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210302 1st (10:00)

37 50612337 WIDIANTO ARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

38 50614213 NUGRAHA ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

39 50612843 ZAKARIA MOH RIZKI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

40 50612244 PAMUNGKAS SLAMET M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

41 50611799 ASTRI F Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

42 50611360 RENDIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
43 50611445 PRABOWO BAYU AGUSTIN HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

44 50613444 ROYHADY REDY M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

45 50611302 YANTI MIKE F Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

46 50613900 MEIRAMDHAN DADAN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

47 50610750 PERWIRA NILAM ARI F Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

48 50612529 RISKI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

49 50611262 PRIATNA EGIT M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

50 50610715 ANDANI ARVIAH TRI F Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

51 50611709 HIDAYAT IMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

52 50613483 RAHARJO SUJI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

53 50612513 DITAMA MAS HERA M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

54 50613895 SOLIHIN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

55 50611772 IMAM CHAERUL M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

56 50613307 WICAKSONO DIDIK M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

57 50613661 ISMANTO YOGI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

58 50611175 PUTRA DIFTA ARYA M Manufacturing > Wood joinery CBT Test room-Indonesia 20210302 2nd (11:30)

59 50611634 IRWANSYAH RIO M Manufacturing > Wood joinery CBT Test room-Indonesia 20210302 2nd (11:30)

60 50611676 YULIANA YUYUN F Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

61 50613687 FAKHRIANSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

62 50611245 ARIANSYAH ISUDIN SEPTI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

63 50613017 PURWANTO MEGI ARDI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

64 50612549 ALI DARONI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

65 50614128 PASARIBU RAHMAT SEPTIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

66 50612142 ULUM M BAKHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

67 50613745 SUPIYANI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

68 50613809 AFFANDI ARIZAN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

69 50614075 PASARIBU GIDION M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

70 50610858 FAUZI ERWIN RUKMANA M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

71 50611096 HILALI MUHAMMAD WAHID M Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

72 50611106 AGUSTIN SINDI F Manufacturing > Assemble CBT Test room-Indonesia 20210302 2nd (11:30)

73 50613338 SETIAWAN RIZKY M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

74 50610839 JAWAHIR M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

75 50613718 GUNANTO MINGGUS HELMY M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

76 50612834 ARYATNO ADI CHANDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

77 50613403 FAUZI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

78 50612633 HADIKI RIZKI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

79 50610916 MIPTAKUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

80 50611714 FIRDALITHA IRDA F Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

81 50613055 RAHARJO HENDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

82 50613839 ARMEDIANSYA M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

83 50611507 GUNAWAN PERI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

84 50614061 PRATAMA GALIH DIKA M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

85 50614178 PRIYANTI F Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

86 50612124 ZIRYANI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

87 50611961 FUJIAH SITI ATIPAH F Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

88 50613099 RISMANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

89 50611604 ROFIKUROHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

90 50614045 NITA RARA PUTRI AYU F Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
91 50612444 PRATAMA ADITYA M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

92 50611512 SEPTIADI MOHAMMAD WINAHTO M Manufacturing > Wood joinery CBT Test room-Indonesia 20210302 3rd (14:00)

93 50611418 NARPODO WAHYUDI IBNU M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

94 50613062 RUSLANI M Manufacturing > Measures CBT Test room-Indonesia 20210302 3rd (14:00)

95 50610951 MUTTAQIN ZAENAL M Manufacturing > Measures CBT Test room-Indonesia 20210302 3rd (14:00)

96 50612203 SUTIANA NINA F Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

97 50612231 PRATAMA RAKA M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

98 50611495 ALAMSAH FERY M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

99 50610958 LESMANA ABDUL AZIS M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

100 50612720 AMINUDIN SYARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

101 50611694 SETIAWAN MOHAMAD QORI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

102 50612654 SETIAWAN MAMUN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

103 50613181 PUSPITA ETI F Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

104 50614146 SAPUTRA RIKY ARYA M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

105 50611571 NOVANTIANI NOER FITRI F Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

106 50611443 ARYANTO SERFIAN F Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

107 50610813 RIYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

108 50612388 PUTRA KRISNA DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 3rd (14:00)

109 50613656 ARIFIN AHMAD SAMSUL M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

110 50612164 BUTAR HENDRA BUTAR M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

111 50612954 NOPANDRA ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

112 50610948 KARYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

113 50612587 KRISMANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

114 50612648 VERNANDO RISKY M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

115 50613997 SARI MELSI RATNA F Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

116 50612190 SUNARTO M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

117 50614366 IRAWAN S ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

118 50611270 NURROCHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

119 50613590 RAHMAN ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

120 50613950 SUTARNO M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

121 50613548 HADPA FEBRILAN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

122 50614031 APRILIAN REZA M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

123 50612423 CIPTADI DHIMAS ANGGA M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

124 50611395 PRAYITNO ARIF ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

125 50612106 SETIAWAN WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

126 50611856 ICHWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

127 50610852 ERMANTO ERIH M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

128 50612438 MUALIMIN MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

129 50614084 GUSROQIM DIDIK M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

130 50612943 RAHMAN AULIA M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

131 50611666 SUKMANA AGUS M Manufacturing > Wood joinery CBT Test room-Indonesia 20210302 4th (15:30)

132 50614281 SETIAWAN HERRY M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

133 50611501 RIANTO DWI OKTA M Manufacturing > Measures CBT Test room-Indonesia 20210302 4th (15:30)

134 50612207 PRATAMA ANDRE M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

135 50614027 PRIMA SATRIA IDE M Manufacturing > Wood joinery CBT Test room-Indonesia 20210302 4th (15:30)

136 50610701 SETIAWAN HERU M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

137 50611886 UMAMI ELISSA RIZA F Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

138 50611950 SETIAWAN YOGI M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
139 50612467 SUSANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

140 50613811 ANLANOBER GILANG RAMBU M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

141 50612481 HIDAYAT RAHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

142 50612857 ZONA TRI VARIO M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

143 50613222 HENDRIK M Manufacturing > Assemble CBT Test room-Indonesia 20210302 4th (15:30)

144 50613770 OLIVIA SHERISNAWA F Manufacturing > Wood joinery CBT Test room-Indonesia 20210302 4th (15:30)

145 50613233 LISTIANA WINDA F Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

146 50612842 LAHIYAH F Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

147 50611587 RIZALDI MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

148 50610781 MULYADI DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

149 50612637 JANURI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

150 50612907 KHAHFI SOHIBUL M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

151 50613554 SAPUTRA ANGGI RIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

152 50612933 ILMIATUN F Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

153 50612275 RIDWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

154 50611343 JABIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

155 50611278 SAPUTRO DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

156 50613616 SYAFRIZAL M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

157 50612445 WAHYUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)
MADUWU CHANDRA SANDY
158 50614316 M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)
PUTRA
159 50611422 SUBKHANI ADUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)
GUNAWAN MUHAMMAD ANDRE
160 50612010 M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)
ARYA
161 50611712 FAUZI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

162 50611326 ADIWIJAYA SUTANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

163 50611217 SUBAGYA FIKRY M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

164 50611410 THURSINA MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

165 50612143 PUTRA DIMAS ARBI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

166 50613176 HERDIYANTO M Manufacturing > Measures CBT Test room-Indonesia 20210303 1st (10:00)

167 50611376 WIGUNA AHMAD ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

168 50613855 HERMAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

169 50614014 INAYATI NAELATUL F Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

170 50611664 SAPAAT AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

171 50610751 FIRDAUS JIA M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

172 50610912 SAESAR YUDA M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

173 50612504 ISNOTO PRAMUDYA M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

174 50611524 TRIANDRIA DENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

175 50611532 RENDIANSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

176 50613538 SULAIMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

177 50613080 TRISTIANTY WATTI F Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

178 50613722 KURNIANSYAH AMBANG M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

179 50613545 CRISPO BONI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

180 50611030 RAMADHAN ZAKKI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 1st (10:00)

181 50614336 RAHMAN AULIA M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

182 50614250 ANA NURDEVI F Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

183 50611018 AGUSTIANA SENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

184 50612792 SETIAWAN NOVIT ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

185 50612892 TEZAR MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

186 50610711 SYAFII M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
187 50612276 MAULANA MOHAMAD RIZIK M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

188 50613255 TOPIK M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

189 50611430 RAMDANI ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

190 50612611 APRIYANTO CANDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

191 50612707 SUYONO MIFTA M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

192 50614137 SUTRISNA ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

193 50614107 HUDAH SAMSUL M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

194 50611467 IRMAWAN WANDA M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

195 50613304 DITO DANANG RAMA M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

196 50612662 GUNAWAN GUGUN AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

197 50611773 ADRIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

198 50613133 RISWANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

199 50613786 ASTA VIKY M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

200 50612911 SAKSENA IJAL M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

201 50612586 PURNOMO ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

202 50612571 ROMADHON SYAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

203 50610779 PRAWESTIO YOGIE M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

204 50611182 ANDHIKA ZEIN M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

205 50614318 CASMONO UNTUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

206 50611091 TABAROK DANI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

207 50610821 SETIAWAN WAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

208 50611800 PRAYOGA RAHMAD BUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

209 50612616 MAULANA M FAJAR DANY M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

210 50611809 SETIAWAN FERI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

211 50612082 ISTAD M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

212 50611767 REFORMASI HENDRI MAULANA M Manufacturing > Wood joinery CBT Test room-Indonesia 20210303 2nd (11:30)

213 50612823 RIJAL MOHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

214 50613619 MAULANA IRVAN M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

215 50613733 MIFTAHUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

216 50613051 NURSIDIK MOHAMAD FAISOL M Manufacturing > Assemble CBT Test room-Indonesia 20210303 2nd (11:30)

217 50612332 SAHURI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

218 50613202 PATRIA MAHATMA BELLA M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

219 50612684 MAULANA RIPANDI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210303 3rd (14:00)

220 50613180 ELFREDA ARYA RAMADHAN M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

221 50610780 INDRIYANI SRI F Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

222 50612202 NASIHIN NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

223 50612747 PIRMANSAH FERI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

224 50612510 ANDRIANTORO M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

225 50612874 UJIYANTO HENDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

226 50613479 FRANATA ENDI HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

227 50611300 SUPRIATNA HERI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210303 3rd (14:00)

228 50613323 SABIBI MUAMAR M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

229 50610885 NOORIYAN HABIB M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

230 50611937 PANDITA CHOKYAN BELA M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

231 50611561 UTOMO WAHYU BUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

232 50611848 HARTONO RUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

233 50610712 DASKINIH F Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

234 50611235 ALFIYATUZZAHROH RIZQI F Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
235 50611500 PUTRI VINKY ROSDIANA F Manufacturing > Measures CBT Test room-Indonesia 20210303 3rd (14:00)

236 50614059 RAFIANSAH M M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

237 50613010 SAFITRI INDAH F Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

238 50613864 SUHARYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

239 50614010 FALAHUDIN ELI AMIM M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

240 50611008 SOMANTRI ROHMAT M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

241 50612737 AMIN SAIFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

242 50612570 FAUZI IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

243 50611315 SOLEH NUR MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

244 50614162 ANWAR KHOIRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

245 50611992 SUSANTO HERI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

246 50612416 NURDIANA SRI F Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

247 50613474 IRWANSAH DANI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

248 50611396 DAROJAT ROFI I M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

249 50611661 PUTRA AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

250 50612503 HARDIYANTO BAYU RIZKI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)
DEVANSYAH DAFA AZHAR
251 50613382 M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)
FAVIAN
252 50611446 ISMANTO TOTO M Manufacturing > Assemble CBT Test room-Indonesia 20210303 3rd (14:00)

253 50614245 SAPUTRA ILHAM M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

254 50614396 SETIAWAN M EKA M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

255 50611673 TARMIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

256 50613574 SUYANTO M Manufacturing > Wood joinery CBT Test room-Indonesia 20210303 4th (15:30)

257 50611929 RIZKI ADE AGUS M Manufacturing > Wood joinery CBT Test room-Indonesia 20210303 4th (15:30)

258 50610833 RIZQI KAWANG MOHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

259 50612110 TAZARI ROBI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

260 50614251 GUNAWAN AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

261 50611978 SASONGKO YOGI APRIYA M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

262 50614100 SAPUTRA JULIJAR TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

263 50610895 YUSUF MAULANA M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

264 50612679 SARIPIN M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

265 50611026 GUNADI SAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

266 50613313 ANTONI DAVID M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

267 50614399 WAHYUDIN EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

268 50611842 DEWI ILKA VIRANIA F Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)
RILANGKAH APIKKAL OLY
269 50610860 M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)
HANDIKA
270 50613060 ROYANI APIP M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

271 50612114 ASROR KHOZIHATUL M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

272 50610774 RONAL NIKO M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

273 50611307 WATI IRMA F Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

274 50612166 WIYATNO DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

275 50612474 KISWOYO M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

276 50611903 SUSANTO JOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

277 50611190 SUSWANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

278 50613235 NURHANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

279 50611472 GUSTINA SARAH F Manufacturing > Measures CBT Test room-Indonesia 20210303 4th (15:30)

280 50613038 SUMARKO ERIK M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

281 50612512 SEPTIAN GERI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

282 50613208 NAJIB ERI SEPTIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
283 50611064 ATNO DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

284 50611491 SEPYANI PUTRI KEMALA F Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

285 50613929 PERDANA RAHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

286 50610800 MASKUR PARID M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

287 50611986 RAMADIN M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

288 50610919 GUNAWAN DODY M Manufacturing > Assemble CBT Test room-Indonesia 20210303 4th (15:30)

289 50611546 ARIFIN AKHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

290 50610743 BURDAH M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

291 50611290 SANTOSO WAHYU DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

292 50611286 JAYANI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

293 50611211 PRATAMA RIAN ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

294 50613329 MISBAHUDIN M Manufacturing > Wood joinery CBT Test room-Indonesia 20210304 1st (10:00)

295 50612215 WIBAWA HENDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

296 50612989 GHOZI FARIZ M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

297 50612487 HIDAYAT THORY M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

298 50613663 ARIANTO DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

299 50614301 SOLEH AKHMAD M Manufacturing > Wood joinery CBT Test room-Indonesia 20210304 1st (10:00)

300 50613984 APRIYANTO ALAN M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

301 50611392 FAUZI AHMAD M Manufacturing > Wood joinery CBT Test room-Indonesia 20210304 1st (10:00)

302 50611149 KUNAEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

303 50612399 PUSPITA KHOLIFAH F Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

304 50613487 YUNANTO HERU M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

305 50613451 YULIANA F Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

306 50614077 WIRANTO LASNO M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

307 50613513 ALAN MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

308 50613591 MAHDALENA F Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

309 50612550 ARMANDO ULUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

310 50610688 IBRAHIM FACHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

311 50612075 ROMADONI TOFIK M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

312 50613874 AGUSTIN MELI F Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

313 50614032 SYAHPUTRA RIZKI SEPTIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

314 50614165 KURNIAWAN RIDHO M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

315 50612146 WIDIANTO HENDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

316 50614024 PRATAMA FEBRI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

317 50611025 ANGGARA ERI YANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

318 50610960 MAULANA MUHAMAD RIDZWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

319 50613869 HIDAYAT RIZQI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

320 50611319 CANDRA EDI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

321 50610923 GOJALI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

322 50611002 AKBAR RAHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

323 50613891 PRASETYA ANDREAS M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

324 50613406 ADRIANTO REDI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 1st (10:00)

325 50612029 ICHSAN WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

326 50613084 SEPTINA FITRI AYU F Manufacturing > Measures CBT Test room-Indonesia 20210304 2nd (11:30)

327 50611409 RADIJA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

328 50613951 RIZAL MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

329 50612180 DAMAI PRASETIA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

330 50612617 ISKANDAR NANANG M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
331 50611925 ALFEDO AGIL M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

332 50613810 AGUSTIAN RENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

333 50611423 SOLIKIN IKIN M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

334 50613918 AMUKTI EKA ANDRIANSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

335 50614060 TYASWARA VICKY M Manufacturing > Wood joinery CBT Test room-Indonesia 20210304 2nd (11:30)

336 50613206 WIDODO ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

337 50614270 ROMADHON SAID M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

338 50613614 KURIAWAN SALEH M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

339 50611863 WICAKSONO ANDREW M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

340 50613553 PRASUTIO REFA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

341 50612758 JUMIADI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210304 2nd (11:30)

342 50613121 NASRUDIN SARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

343 50612669 UTAMA BENI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

344 50611171 KHOMARULOH IMAN M Manufacturing > Wood joinery CBT Test room-Indonesia 20210304 2nd (11:30)

345 50612641 ANDRIANS VICKY M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

346 50614022 SAPUTRA EKO YANA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

347 50612495 BAHARUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

348 50613093 RISMAN ISKANDAR M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

349 50610728 NINGSIH WINARTI WIJAYA F Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

350 50611017 KHORIN VIRA DIWAFAH F Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)
ABDUROHMAN SOPYAN MALIKI
351 50610927 M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)
BIN
352 50612219 WAHYUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

353 50614133 SIAGIAN EVANS M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

354 50610929 SURAKMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

355 50613854 KUSUMA MUHAMMAD YOGA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

356 50610864 HIKAM NURUL M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

357 50613469 MEGA TITIK F Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

358 50613420 WAHYUDI ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

359 50611718 HADI SAMSUL M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

360 50611549 NURIYANTO ROBY M Manufacturing > Assemble CBT Test room-Indonesia 20210304 2nd (11:30)

361 50612330 HAKIM LUKMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

362 50613035 SUTRISNO M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

363 50612306 SUSANTO IMAM ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

364 50612744 MADYUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

365 50614338 YULITA YENI F Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

366 50613999 TRIYONO M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

367 50612772 SAPUTRA TEJA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

368 50611559 APRIAN IRFAN ANGGER M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

369 50613410 PRATAMA RIZKI CANDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

370 50613737 SAPUTRA RICKY M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

371 50613283 PURWANTO SIGIT AMBRA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

372 50613796 CARSITO M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

373 50613511 PUTRA ALON PRIMA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

374 50613930 HULU EMANUEL M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

375 50611371 SAPUTRA ANGGA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

376 50613339 ALFATTAH ACHMAD DANU M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

377 50612944 MAHARDIKA RIVAL M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

378 50613135 LESTARI NOVIANTI EKA F Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
379 50612473 PAMUJI YUGO DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

380 50611265 YAHYA ASROPI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)
LATORSELY M.KHUSNI TAMRIN
381 50613735 M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)
MISDA
382 50612795 FATKHURROHMAN IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

383 50613766 DIMAS KHOLEX M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

384 50612247 FIKRI ZAKKY ZAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

385 50613506 MARYANTO FEBRI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

386 50614179 SAPUTRA RIO EKA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

387 50611508 SUPRAPTO OGI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

388 50613848 ZULKARNAIN M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

389 50612797 RISYANTO ADI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210304 3rd (14:00)

390 50610857 KARTIKA WIWI F Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

391 50612515 NURSALIM MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

392 50612712 UMAM KHAERUL M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

393 50612005 KUSNANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

394 50613030 KUSWANTORO RUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

395 50613650 PUTRA ARDIANSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

396 50614327 KENCANA SARI ATHI LITA F Manufacturing > Assemble CBT Test room-Indonesia 20210304 3rd (14:00)

397 50610876 TARKIWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

398 50610991 NURBAYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

399 50611728 LARASSATI ASTRI F Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

400 50612551 SAPUTRA AHMAD ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

401 50614168 SIMANJUNTAK JULIUS M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

402 50614001 TRIAWAN MUHAMMAD ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

403 50611840 PRAWIYA WISNU TRIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

404 50612286 FURGANDY DAVIET M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

405 50612620 CASRIKIN ERIK M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

406 50614034 PERMANA TIRTA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

407 50613137 NOFERIYANSAH CATUR M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

408 50613349 TRIANI FANNY F Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

409 50612618 MILLINIO SYAHRUL YUDHA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

410 50613732 RIFAI ACHMAD FAJAR M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

411 50611318 YAQOB RIFQI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

412 50610832 SUBAGJA RIKY DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

413 50613942 GULO SIPRIANUS M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

414 50612499 ISKANDAR RUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

415 50613778 JUNIANDA DANANG YONAS M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

416 50611949 KOTIMAH KUSNUL F Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

417 50612741 PRASETYO AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

418 50612427 PURNOMO DIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

419 50613840 KOMARUN ARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

420 50611304 MAULANA NUR KHOLIQ M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

421 50613931 FEBRIAN GILANG M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

422 50610767 ADHA MUHAMAD SAHRUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

423 50612196 MUNIR MISBAHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

424 50611000 LESMANA RANGGA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

425 50613031 FERDIANSYAH REZA M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

426 50611706 AZIZ ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
427 50612064 PRATIWI DIAN F Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

428 50613956 KRISTINA THERESIA F Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

429 50613934 WARUWU FRANSISKUS M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

430 50611868 FAWAZ ANANDA M Manufacturing > Wood joinery CBT Test room-Indonesia 20210304 4th (15:30)

431 50612667 HANDOYO DIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

432 50610950 NURINSANI IRA F Manufacturing > Assemble CBT Test room-Indonesia 20210304 4th (15:30)

433 50613322 PRAYITNO AMAT SAIPUL M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

434 50613955 SUKMAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

435 50612723 PURWANTO ARIEFANDHI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

436 50611885 ZEBUA ARNIMAN F Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

437 50614003 SYAIKONI MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

438 50610718 WARSIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

439 50613319 SYAKUR M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

440 50614288 YANTO JUPRI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

441 50612671 SUSILO HERU PURWO CIPTO M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

442 50614292 WISUDIASTUTI CINTA F Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

443 50613601 SAPUTRA ALVIN M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

444 50611541 JAYADIH M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

445 50612338 HANDOYO TRI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210305 1st (10:00)

446 50611889 SETIAWAN CECEP M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

447 50611444 ALFIANTY AULIA DEMY F Manufacturing > Measures CBT Test room-Indonesia 20210305 1st (10:00)

448 50611179 WARNOTO M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

449 50612941 SULTONI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

450 50611522 SUPRIATNA ASEP M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)
RIVAZ MUHAMMAD
451 50611428 M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)
SHIFAHUDDIN
452 50613965 ABIDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

453 50610963 ANDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

454 50612241 PRASTIAWAN AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

455 50611699 SUKARNO NONO M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

456 50612237 VEBBYLIAN LOKA UKO M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

457 50613518 ENDANG M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

458 50612683 ALWALADI ROBI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

459 50614334 HERIYANTO M Manufacturing > Measures CBT Test room-Indonesia 20210305 1st (10:00)

460 50612703 RIYANTO M FADILAH M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

461 50613136 APRILIANI RIZQI F Manufacturing > Measures CBT Test room-Indonesia 20210305 1st (10:00)

462 50612455 HARMIN M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

463 50612401 PRAHASTOWO WIGUNA M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

464 50611322 WAETO M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

465 50613333 DANDI MUHAMMAD M Manufacturing > Measures CBT Test room-Indonesia 20210305 1st (10:00)

466 50614217 ANGGRAINI DEVI F Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

467 50614320 ROHIYAT ADE YAYAT M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

468 50611450 WIBAWA GALANG SURATA M Manufacturing > Assemble CBT Test room-Indonesia 20210305 1st (10:00)

469 50611899 ARFI NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

470 50611621 RUSTIAWAN ELANG M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

471 50613744 S TANJUNG RAMBANG EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

472 50613720 ALMUHUDA BACHTIAR M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

473 50614211 RAMADAN SAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

474 50611502 IRAWAN GILANG M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
475 50611839 MUNANDAR ARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

476 50612485 SUPRIYANTO AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

477 50613885 ARDHIANSYAH AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

478 50613572 RIYAN DWI NOVA M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

479 50611822 AGUSTIA SINTIA F Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

480 50610908 ALQAURRANA MOH M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

481 50614239 TOHIRIN M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

482 50612922 ALHIDAYAH NOVI F Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

483 50612953 MUTOLIB AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

484 50613562 SUPRIYANTO TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

485 50611020 HOERUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

486 50611967 ALANDA M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

487 50612171 ATTSAQOFI IHZA DHIYA M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

488 50611843 MUSTAQIM ZAENAL M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

489 50614049 SANJAYA REZA M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

490 50612545 SANTOSO AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

491 50611406 MAULANA SIGIT M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

492 50612425 KUSIN M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

493 50610776 BADAWI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

494 50612930 RIYANTO ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

495 50611379 MULYADI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

496 50614150 SUSWANTO HENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

497 50613721 NAZAROFAH AINUN F Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

498 50612623 WATI WIWIT FAJAR SETIA F Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

499 50612962 SANI INTAN MUTIARA F Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

500 50611156 HIDAYATULLOH RIYAN SARIP M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

501 50611196 LAKSONO TEGAR DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

502 50612273 DARYONO M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

503 50613978 WARISI KHAIRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210305 3rd (14:00)

504 50613166 SETIAWAN NANANG M Manufacturing > Measures CBT Test room-Indonesia 20210305 3rd (14:00)

505 50611415 FAHRUROJI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

506 50611870 ZAMI ARIFATUL REGA OKKY ZAM M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

507 50611688 EFENDI CANDRA DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

508 50611576 GUNAWAN HARI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

509 50612347 SETIADI AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

510 50613478 MUTAKIN M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

511 50612782 SUDRAJAT EKA M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

512 50614002 SALMAN YAMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

513 50612089 FIRDAUS AHMAD IHWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

514 50614194 SITUMEANG DONI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

515 50611990 WIRYANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

516 50612034 AGUSTA ALFIAN RENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

517 50610910 TARMA M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

518 50611746 ADEANSYAH RIZKY M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

519 50613446 HERMAWAN SANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

520 50611479 SANTOSO DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

521 50612359 PURWANTO TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

522 50613485 SEPTIYANI RIRI RIZKY F Manufacturing > Measures CBT Test room-Indonesia 20210305 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
523 50614080 SIBARANI HALASSON M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

524 50611600 FIRDAUS M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

525 50612872 BAHRI SYAMSUL M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

526 50613856 WARNI F Manufacturing > Wood joinery CBT Test room-Indonesia 20210305 4th (15:30)
SUPRIYATNA PUNGKI ANITA
527 50612406 F Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)
CANDRA
528 50612603 MAULANA HOSAN M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

529 50612697 ANAM MUHAMMAD KHOERUL M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

530 50611041 NURHASANAH LENI F Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

531 50611553 SECHA HASIM NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

532 50610988 FITHRAND DZIKRIE M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

533 50612248 SARI DESI RATNA F Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

534 50612975 PRIADI DONI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

535 50612115 SETIAWAN DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

536 50613199 PRIYONO DEDE M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

537 50611793 WIBOWO ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

538 50613957 KARTIKA WIDYA F Manufacturing > Measures CBT Test room-Indonesia 20210305 4th (15:30)

539 50612794 RIZAL KHAERUL M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

540 50611358 AGUSTIAN RIZKY M Manufacturing > Assemble CBT Test room-Indonesia 20210305 4th (15:30)

541 50614190 SALIM NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

542 50613167 FATTAH OHAN ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

543 50613296 ULUM AHMAD BAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

544 50613189 RAFYANGGA ESTYA M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

545 50612243 SUGORO ROBY M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

546 50612109 HARYONO EKO DIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

547 50610687 RIFAI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

548 50612568 BINTORO DWISNU M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

549 50612948 PRAYOGA ANGGER M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

550 50610748 ROIS KHOIRIN MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

551 50610753 INDAH F Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

552 50613172 ROZAK BAGUS FATKHUR M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

553 50610726 NUR IZZUDDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

554 50613424 SUJATMICO WOWO M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

555 50611449 NINGSIH LINDA SULISTIA F Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

556 50611578 RAMDHANI EKA PURNAMA M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

557 50612698 MUSLIKHIN M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

558 50612044 AGUSTIAN WIDIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

559 50611781 SUPEDI AZAM M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

560 50612107 PRATAMA FERI SANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

561 50614260 AYU CITRA F Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

562 50613023 WAHYUDI SAMSUL M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

563 50611646 HIMAWAN SIGIT M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

564 50613625 TURMIZI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

565 50612373 SIDIK WISNU JAFAR M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

566 50612062 RAMANA DICKY M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

567 50611797 RISMAWAN ERI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

568 50612990 SULISTIONO FAJAR M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

569 50612066 HIDAYAT SOFIK M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

570 50611743 SANUSI ITAR M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
571 50613835 AUDINA NIA F Manufacturing > Wood joinery CBT Test room-Indonesia 20210308 1st (10:00)

572 50611880 WIRANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

573 50611375 FIRMANSYAH HUSNUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)
AMALUDIN ALAM MUHARAM
574 50611654 M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)
NUGRAHA
575 50610940 RUWITA M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)

576 50611310 FAIZIN SETYA NURUL M Manufacturing > Assemble CBT Test room-Indonesia 20210308 1st (10:00)
HIDAYATULLAH DEDE STEVI
577 50611757 M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)
AGNES
578 50612021 SIRINGORINGO RENI ANGRIANI F Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

579 50613374 HENDRATMO SETIA M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

580 50611161 MAULANA FAIZZ ILHAM M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

581 50610862 SAEFULLOH M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

582 50610812 A ANGGA M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

583 50612665 HIDAYAT FADIL M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

584 50612384 SUJIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

585 50613764 BUDIASIH DEA PANGESTI F Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

586 50614147 HIDAYAH ISTIKHAROH NURUL F Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

587 50614111 IRAWAN FERI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

588 50611983 PURWANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

589 50612236 WAHYUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

590 50613317 WULANDARI INDRI F Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

591 50612670 WIBOWO NANDA AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

592 50612333 WAHENDRI MOH M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

593 50612895 VALENTINO BILLY M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

594 50611898 FARADILA GIOLAN F Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

595 50611852 BASKORO BAYU BAGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

596 50611599 HARYANTO JUNI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

597 50611313 SETIAWAN WAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

598 50611416 MUHIDIN DIDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

599 50611254 UDIN DEDE M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

600 50612591 ROSUL ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

601 50610965 MAULANA ISKANDAR M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

602 50613763 ADI SASMITO M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

603 50614271 FEBRIANSYAH SUGENG M Manufacturing > Wood joinery CBT Test room-Indonesia 20210308 2nd (11:30)

604 50611693 HIDAYAT ANDY RAHMAT M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

605 50611521 SIRINGO TIO KATARINA F Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

606 50611100 HISYAM IBTADIL M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

607 50612019 PRIYANTO ANGGA M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

608 50613302 MAHENDRA ADE BASTIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

609 50613767 SURYADI EKO M Manufacturing > Wood joinery CBT Test room-Indonesia 20210308 2nd (11:30)

610 50611999 HUDA SAPTA MIFTACHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

611 50613899 RIANTO MADRIM M Manufacturing > Assemble CBT Test room-Indonesia 20210308 2nd (11:30)

612 50612760 MAUFIQ M Manufacturing > Wood joinery CBT Test room-Indonesia 20210308 2nd (11:30)

613 50611770 SURIADI DODI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

614 50611665 ANAM KHERUL M Manufacturing > Wood joinery CBT Test room-Indonesia 20210308 3rd (14:00)

615 50611249 NURTAMIN M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

616 50611764 AFRIYAN MUHAMAD DENIZAR M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

617 50612904 ASHAR SYAM HARI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

618 50613203 SANTOSA SINGGIH MULYAWAS M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
619 50613584 TAMBUNAN CHATRINE NATALIA F Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

620 50612475 KRISWANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

621 50612407 SAPUTRA AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

622 50611683 ROFIQ MOHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

623 50612189 SUSANTO ANTON M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

624 50610983 HAFIDZAH SARAH NUR F Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

625 50613667 NURHAFIZ AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

626 50613587 SETIAWAN YUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

627 50611993 SUFYAN ABU M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

628 50611321 RAMADHAN KELVIN DORY M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

629 50614134 SAPUTRA ADES M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

630 50611802 HILMAWAN OGI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

631 50612972 BADRIAH F Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

632 50611597 HERMAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

633 50611413 UTAMI DEISYANA F Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

634 50613153 HIDAYAT FADHIL M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

635 50613311 FRENKI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

636 50612004 PUTRA SURYA ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

637 50611761 PURBA HENDRY MEILSON M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

638 50613861 PUTRI PRISKA TRIANA F Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

639 50612045 ALGIVARY NOVAL M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

640 50613783 ISMAIL ADI FUAD M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

641 50613769 ARIANSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

642 50613904 SETIAWAN MASSUR EKA M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

643 50612639 SETIYONO TRISNO M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

644 50614256 UTAMI MONICA DEVI FEBRI F Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

645 50614020 SARI EMI NOVITA F Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

646 50613925 RUSWANTO FIKRI ROZI M Manufacturing > Measures CBT Test room-Indonesia 20210308 3rd (14:00)
RAMADHAN REFANDO ADITYA
647 50613217 M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)
RIZA
648 50613232 SAPUTRO HARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210308 3rd (14:00)

649 50614371 DANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

650 50612983 MULYANA DEDE M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

651 50610720 PRATAMA WILLY ADAM M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

652 50612463 MASWARIDAH F Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

653 50610995 RAHMAT M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

654 50612884 BRANSISKA M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

655 50613466 FIRMANSYAH AHLAN M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

656 50613702 NABILA DITA F Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

657 50612964 NURJANAH F Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

658 50612519 SOLAHUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

659 50612710 MUNIROH NUR LULUATUL F Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

660 50613500 ROSJAENI M Manufacturing > Measures CBT Test room-Indonesia 20210308 4th (15:30)

661 50611440 KHABIBALLAH MOHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

662 50613622 SUPRIYADI ASEP M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

663 50613658 FIRANTY CITRA F Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

664 50613082 SUBEKTI ANTON M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

665 50613806 KURNIAWAN MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

666 50614241 HADI RIFKY SYAEFULL M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
667 50613371 HERWANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

668 50611630 AUNILLAH FAJAR BAHARI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

669 50613174 FITRIANTO HARI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

670 50614219 HAKIKI INSAN AKBAR M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

671 50613920 JALIL ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

672 50614341 FERMANA RIAN AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

673 50610746 ARIF SOPYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

674 50613631 WIDODO GALUH M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

675 50611719 SEPTIAN ALPINDA FRADES M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

676 50613142 MUHARIP M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

677 50613546 RIDHO MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

678 50614158 PANGESTU BAYU ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

679 50614242 DEWI DEA SEPTIANA F Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

680 50613844 ANDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

681 50613324 NUGROHO CAHYO AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

682 50613228 SUKAMTO M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

683 50611659 RAMDHANI SONI M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

684 50613581 SAPUTRA WINDO M Manufacturing > Assemble CBT Test room-Indonesia 20210308 4th (15:30)

685 50613566 ARIANI LEVI F Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

686 50614340 SUDARMONO EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

687 50611677 ANTON M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

688 50610818 AFRIYAN YOHAN ANANG AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

689 50613058 BAIHAKI RIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

690 50613123 WIRANA UMAR ADY M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

691 50611756 MAULANA TRI TRISNA M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

692 50611174 SOBAR M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

693 50613145 MUNIR MUHAMAD MISBAKHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

694 50612298 MAULANA RIZKI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

695 50612636 YULIANTO IRVAN AMBAR M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

696 50610757 SUPRIYONO BAMBANG M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

697 50613151 ROHIM DANANG NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

698 50612852 PRATAMA HENDRIK YUDHA M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

699 50611168 JATMIKO DWIKY PRIO M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

700 50613178 SALIM MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

701 50611232 SUGIARTO M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

702 50612609 ZULMI ADI FAIZAL AMIR M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

703 50611550 FIRDAUS FIQRI ALIF M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

704 50614306 MUIS ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

705 50611940 AMIRUDIN AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

706 50612304 JAYA RIZKY TIRTA M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

707 50614367 TRISNANTO ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

708 50611972 ANAM NAELUL M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

709 50612651 WENDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

710 50612581 KHASANI AKROM M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

711 50612072 SYARIFFUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

712 50613635 SYAPUTRA KHAIRIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

713 50613986 SUGANDA HENDRI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210309 1st (10:00)

714 50611114 NOVITASARI F Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
715 50611356 FEBRI CARIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

716 50612958 KUSWANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

717 50613974 WAHYUDI AGUS BAMBANG M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

718 50613704 SUWONDO M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

719 50612920 RAHAYUNI MUSTAHIKUL F Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

720 50613245 WASKITO IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210309 1st (10:00)

721 50612172 ANWAR KHOIRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

722 50613331 BAGUSTI ARIA M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

723 50611769 FAHROZI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

724 50610698 MUZKI ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

725 50612814 SETIAWAN RICKY M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

726 50612382 KHAMDANI IQBAL M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

727 50612543 THOHA MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

728 50612179 ABIDIN ZAENAL M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

729 50614332 SYAHRONI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

730 50610881 MUSAM ABADA M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

731 50613185 ANAM KHOIRUL M Manufacturing > Measures CBT Test room-Indonesia 20210309 2nd (11:30)

732 50612076 ARIZONA KHOIRUL RYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

733 50611710 ANDI SURATMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

734 50613812 GUSTAWI ABDI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

735 50612119 WAHYUDI AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

736 50611220 JUNAEDI JUJUN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

737 50614085 KARIM HAMIDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

738 50612099 ADITYA RESTU M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

739 50611872 IXWANTO THIO M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

740 50613940 GULO SYUKUR ELI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

741 50610770 FADHILLAH MAODY F Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

742 50613992 FERDIANSYAH DIMAS M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

743 50613748 FAUZI MUHAMMAD RIVAL M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

744 50614136 PANGESTU BAYU TEGAR M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

745 50611087 SURYADI JEJE M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

746 50611359 DAHLAN FUAD M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

747 50610699 SARUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

748 50610809 DAIMAYAH FAIDATUN F Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

749 50614026 PIRNADI LEO M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

750 50611118 SUNANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

751 50610829 CARYADI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

752 50613802 SETIAWAN MUHAMMAD OZI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

753 50613102 SEPTIANDINI FADILAH NURUL F Manufacturing > Measures CBT Test room-Indonesia 20210309 2nd (11:30)

754 50612310 PRIYONO AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

755 50613654 MULWANDANI PANDU TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

756 50611186 ANDRIANA RIFAN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 2nd (11:30)

757 50611081 TARJONI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

758 50613995 WAHONO EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

759 50613791 SAPUTRA ADE BACHTIAR M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

760 50611635 ISMATULLAH M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

761 50611513 HARLIANI RISKA F Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

762 50612187 AFIFUDIN AKSAN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
763 50613962 SUPRIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

764 50613961 PUTRI CINDY ADELIA F Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

765 50614028 LARAS RURI ELSA CINDE F Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

766 50612672 NURSIDIK AKHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

767 50612876 WAHYUDI MUHAMAD FIRLI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

768 50612492 SISWOYO M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

769 50610802 JAYA AWALUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

770 50612731 SUMARSO M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

771 50611181 SAEFURROYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

772 50611085 JAIB M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

773 50612378 ATIF M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

774 50611928 HIDAYAH FANDILAH NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

775 50613105 IMAN SYAIFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

776 50611749 MURDOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

777 50614400 NURROHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

778 50613571 ERWIN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

779 50613670 SARNITI F Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

780 50613066 NURSAMBA RISKY AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

781 50612133 GHUFRONI AHCMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)
PUTRA MOHAMAD HADI
782 50612295 M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)
SUTRISNO
783 50613431 SETIAWAN ARY M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

784 50612855 ROMADON BAHTIAR M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

785 50614018 ASHARI WAHID M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

786 50610808 BAHTIAR FAHRI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

787 50612801 JULIANTO ERIAS M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

788 50612150 LELONO AGUNG PUTUT JOYO M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

789 50613514 NURSAIDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

790 50613600 KURNIA DANI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

791 50613903 FADHILAH MUHAMMAD IHSAN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

792 50613952 IMANSARI WIDIYA F Manufacturing > Assemble CBT Test room-Indonesia 20210309 3rd (14:00)

793 50613530 HUSNI ANDRIL M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

794 50612502 HERMAWAN ROMLI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

795 50611057 AGUSTIN SANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

796 50612167 SAFANGAT MAFTUF NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

797 50614009 UMARDANI MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

798 50611778 SAPUTRA DWI WISNU M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

799 50613064 MAESAROH SITI F Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

800 50612291 GHOZALI MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

801 50612816 MAHAR ILHAM FURQONI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

802 50611333 NURCHOLIS M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)
WIYANTO HASTRO RIYON
803 50614204 M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)
DEDDY
804 50612813 MASHUDI ASEP M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

805 50612553 AFRIZAL MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

806 50611906 ALFARIZI JUAN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

807 50610721 VIQIYANSAH MAHDA GARIN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

808 50611966 HARIYANTO EDI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

809 50614030 CAHYONO DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

810 50612358 FUAD ALDO ELFRAN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
811 50614297 SUBANDI AAN M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

812 50612763 AZIS FAHMI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

813 50611930 AINUR JEFRI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

814 50611660 WAHID SAID M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

815 50613523 AZWIR ARIFANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

816 50611387 WIWIN F Manufacturing > Measures CBT Test room-Indonesia 20210309 4th (15:30)

817 50611957 FIRNANDO DEGI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

818 50614398 JOHANI MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

819 50611783 RIFAI MUHAMMAD ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)
REZA KEMAS ADHITYA
820 50613776 M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)
BAGUSWARA
821 50614212 HENDRIONO M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

822 50613468 DIPA TRESIA TIARA F Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

823 50613698 PURWANTO AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

824 50613014 LUTFIAH LAELATUL F Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

825 50612343 HANIP FIKRI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

826 50611662 AKBAR GUSTI M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

827 50612736 MUNDIR MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

828 50612344 ASTUTI PUJI F Manufacturing > Assemble CBT Test room-Indonesia 20210309 4th (15:30)

829 50611069 DEWA NUR AGUNG WANGSA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

830 50611402 SUKRAMA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

831 50614051 ERVIN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

832 50613558 ANWAR SAMSUL M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

833 50611776 SOBIRIN AKHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

834 50611598 ALATIP WILMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

835 50611275 WAKHID M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

836 50613559 SAPUTRA ASNAN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

837 50612048 SAADAH NURUS F Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

838 50614038 WIBOWO MARGO M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

839 50611120 SUSANTO RYO GIBRAN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

840 50612417 FAUJI HERU KUMILANG M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

841 50613386 ANNE F Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

842 50613162 NUGROHO EKO ASARI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

843 50610942 HUDAYA BAYU M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

844 50611101 YUSMIATI F Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

845 50611202 SAPUTRA OGI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

846 50613359 ANGGRAENI RENI F Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

847 50613528 HANDIKA CACA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

848 50613883 SAPUTRA ANGGA WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

849 50611323 HANIFAH ABU M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

850 50614016 MARANDA KIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

851 50612956 NURSALIM ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

852 50611579 ALFATAH MUHAMMAD ALDHO M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

853 50613402 JUMAIDI ANGGA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

854 50611689 YOHAN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

855 50613067 SUPRIYADI SUGENG M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

856 50613753 SAPUTRA IKKO PRAYOGI ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

857 50613112 KASIH AGIL WAN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

858 50612271 MUHKRODI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
859 50614345 SETIADI KIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

860 50612315 FAUZI MAS REFAL M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

861 50612645 WIDIYANTO M Manufacturing > Wood joinery CBT Test room-Indonesia 20210310 1st (10:00)
SOBIRIN IQBAL BAROKAH
862 50612081 M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)
ACHMAD
863 50611729 RAMDANI JIHAN SYAHARANI F Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

864 50612951 JUNIARTOSO M Manufacturing > Assemble CBT Test room-Indonesia 20210310 1st (10:00)

865 50613592 ALDI PUTUT M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

866 50614339 RIFALDI MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

867 50613177 APRILIANTO HERU M Manufacturing > Measures CBT Test room-Indonesia 20210310 2nd (11:30)

868 50614395 PUTRA AKBAR WETA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

869 50612735 SUKROJATI PRIMANDIRI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

870 50612790 SYUKRON M Manufacturing > Wood joinery CBT Test room-Indonesia 20210310 2nd (11:30)

871 50611705 SIYANTURI RONI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

872 50613450 SYAHPUTRA FRANKI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

873 50613047 HUDA ADI IQBAL SAFIQUL M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

874 50613002 ISNAWATI YENNI F Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

875 50612366 NUROHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

876 50611426 JAHROTIN F Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

877 50611862 PRABOWO AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

878 50612803 JUNAEDI JUNED M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

879 50610953 AWALUDIN WALDI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

880 50614351 RONALDI BOGI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

881 50613000 HERMAWAN ANJAR M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

882 50612213 PRABOWO RIKI ADY M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

883 50612673 ARIFIN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

884 50610970 HARTONO RUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

885 50612105 AZIZ KHAWAZIN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

886 50613982 PURWANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

887 50612640 WARDANI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210310 2nd (11:30)

888 50612198 SITOHANG FRANCE NOPERTI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

889 50613198 KARNOTO EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

890 50612385 PAMBAYUN DIDIK M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

891 50610994 SALAHUDIN MOHAMAD M Manufacturing > Wood joinery CBT Test room-Indonesia 20210310 2nd (11:30)

892 50614004 TAMRIN M HUSNI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

893 50611452 HASANUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

894 50611715 TANTOWI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

895 50613913 ARBY ALDY M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

896 50611434 IRAWAN CANDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

897 50612600 MAMUR M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

898 50613794 WIJAYA ALEK SUSANDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)
SIRINGO-RINGO ANGGI
899 50614169 M Manufacturing > Measures CBT Test room-Indonesia 20210310 2nd (11:30)
PRANATA
900 50613552 GUMELAR SEPTIYAN RAHMAT M Manufacturing > Assemble CBT Test room-Indonesia 20210310 2nd (11:30)

901 50611389 DAMAYANTI SRI F Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

902 50611721 AZIZ ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

903 50614329 KHOIRUDIN MOHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

904 50611433 TRISNAWATI ADE F Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

905 50611572 PURNAWAN UUS M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

906 50610861 WARTANA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
907 50611237 PARMONO ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

908 50610790 IMAM FAYAKUN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

909 50611864 DARISMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

910 50612831 SYAEFUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

911 50612031 LATIF DANIEL M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

912 50611330 KOMARUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

913 50611466 ZARKASI ANGGA SAPUTRA IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

914 50613154 SUBANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

915 50614103 BASUKI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

916 50613755 NURHALIZAH MAS AYU F Manufacturing > Wood joinery CBT Test room-Indonesia 20210310 3rd (14:00)

917 50610949 SOPIA SITI F Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

918 50613422 ADELIA F Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

919 50613365 HASAN HABIB M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

920 50614352 HERISA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

921 50612424 ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

922 50614261 NURAZIZAH F Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

923 50611348 RUGANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

924 50613946 INDRAYANI GUSTIN F Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

925 50612805 LESTARI DWI ANDRIANY F Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

926 50612612 GUNAWAN AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

927 50612181 ARIFIN WAHYU ESA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

928 50611619 ZAKARIA HARDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

929 50613532 ARIF SOFIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

930 50611098 SUGANDA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

931 50611107 KURNIAWAN WAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

932 50614391 RIZAL YOGI YOZE M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

933 50611565 FAWZI MUHAMAD ROBI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

934 50613729 MILLAH ARIFQI HIDAYAT M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

935 50613335 MUNANDAR DIEKY FRAN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

936 50611154 SAIMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 3rd (14:00)

937 50612326 FELANI HERMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

938 50612822 ANAS MOHAMMAD AJWAR M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

939 50612883 SAFRUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

940 50614176 SARAGIH CITRA YULIANA F Manufacturing > Measures CBT Test room-Indonesia 20210310 4th (15:30)

941 50612531 AZIS ARIF MAULANA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

942 50613022 AJI SYANDI SATRIO M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

943 50611514 HAKIM ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

944 50614376 SAPUTRA ARDIANSYAH HENDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

945 50611698 MULYANTO JOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

946 50614098 SETIAWAN DANANG M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

947 50614344 ENDRI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210310 4th (15:30)

948 50612880 NURJANAH SITI F Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

949 50614041 WIDIANTORO KRIS M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

950 50613453 SETIAWAN ERWIN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

951 50612877 RIFAI DAYAT M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

952 50614207 ANWARUDIN SYAEFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

953 50614074 PANGESTU BOWO PRAYOGO M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

954 50611352 PERMANA EKA CAHYA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
955 50613221 AGUSTINA AIDA F Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

956 50610971 YANA DIKRI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

957 50611090 RIDWAN MOHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

958 50612552 WALUYO PUTRO M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

959 50610765 YANTI FITRI F Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

960 50611851 IRWAN MIRZA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

961 50610811 ROHMAN ABDUR M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

962 50612593 KURAHMAN SLAMET TAUFIK M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

963 50613695 MENDROFA AGUS PETRA M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

964 50613467 ALEXRIDWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)
SETIRA AGUSTINE KUSUMAWATI
965 50613643 F Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)
PRANA
966 50612170 SUBIANTORO JEFRY M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

967 50611441 SUYITNO RENA HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

968 50613777 JULIARTI INDAH F Manufacturing > Wood joinery CBT Test room-Indonesia 20210310 4th (15:30)

969 50613716 ABDULLAH SAYYID M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

970 50611215 SAPUTRA WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

971 50612488 BAIDAH SITI NURUL F Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

972 50611329 RHAMADHANI RIZKY M Manufacturing > Assemble CBT Test room-Indonesia 20210310 4th (15:30)

973 50612078 ABIDIN ZAENUL M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

974 50612091 SIROJUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

975 50613834 EVENDI HERVIN M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

976 50613907 FERNANDO JASENE M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

977 50612300 ELISAH F Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

978 50611543 ARYANTO EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

979 50614143 FAHREZI ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

980 50613268 ROHMAN ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

981 50613385 PATONI HAIRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

982 50611438 SURYANA NANANG M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

983 50613944 PAMBUDI RIBUT AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

984 50614187 RAMADAN ANGGI CAHYA M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

985 50613990 GOSMAT M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

986 50613797 PIRLI OZI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

987 50611476 DIANA NOVI F Manufacturing > Measures CBT Test room-Indonesia 20210315 1st (10:00)

988 50614220 WIHARTO M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

989 50614343 HIDAYAT TOPIK M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

990 50611023 NURJAMAN GINA M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

991 50613740 MUKLAS MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

992 50612451 PRAYOGO KHOLIK M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

993 50610786 AWALUDIN DZIKRON M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

994 50613272 FANILAH F Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

995 50610937 MULYAWAN ISHADI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

996 50612371 MUHROJI AGUS ALIM M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

997 50613568 SUMARDI WILLI RAFLI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

998 50611271 NUROKMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

999 50611847 SETIAWAN DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

1000 50613455 KURNIAWAN RANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

1001 50611111 KURNADI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

1002 50611858 DARMAWAN DIMAS M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1003 50611153 MAULANA ITAL M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

1004 50613113 ISMAIL JAYANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

1005 50614093 SAPUTRA BAYU ASEP M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

1006 50612578 ANGGRAITO RIRIN M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

1007 50612824 WIBOWO PRAYITNO ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

1008 50611760 JAFAR GOFUR ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210315 1st (10:00)

1009 50613143 RIFAN MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1010 50614058 SETIAWAN BUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1011 50613191 MARYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1012 50612131 SIAGIAN CRISTOPEL M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1013 50610843 ROHENDI ASEP M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1014 50611700 BASTIAN ERFAN M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1015 50613247 SAPUTRA WAHYU RAGIL M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1016 50613522 ADNAN MUHAMMAD MUSA M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1017 50612027 ISAPUTRA RONI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1018 50611668 AKHMAL DEFA NUR MUHAMAD M Manufacturing > Wood joinery CBT Test room-Indonesia 20210315 2nd (11:30)

1019 50611631 WARDANI NESYA AGUSTINA F Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1020 50610724 NURLAELA F Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1021 50611013 BASIR M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1022 50610694 SARI DEWI NOFITA F Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1023 50612319 PRASTANTO GILANG ADI LOCA M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1024 50613945 YUNIOR RYAN SUTRIADI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1025 50611874 YULIATIN F Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1026 50611763 MULYANA AKHMAD ZIDAN M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1027 50612436 PRIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1028 50612643 ASMARA BELLA M Manufacturing > Wood joinery CBT Test room-Indonesia 20210315 2nd (11:30)
MAULANA EDYASTIN NUR
1029 50613187 M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)
ELBASUNI SULTAN
1030 50613045 SYAHDANI HAZAR GHUFRON M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1031 50610820 AMINULLAH ABDUL MUJIB M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1032 50612035 KASTONO M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1033 50611517 HIDAYAT AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1034 50613250 SUDRAJAT IMAM M Manufacturing > Wood joinery CBT Test room-Indonesia 20210315 2nd (11:30)

1035 50613972 RIPALDO M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1036 50613902 BIMA M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1037 50612096 PEPRANDO MARTIN M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1038 50611218 WALIYUDIN TAUFIK M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1039 50611568 SETIAWAN BAGAS ARDI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1040 50611380 AMRULLAH FAKHRI ARBI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1041 50611043 BISMANTARA ADITYA M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1042 50613460 ANAM MISBAKHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1043 50613901 SUSIANTO AGUNG BAGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1044 50611135 MAULANA ANA M Manufacturing > Assemble CBT Test room-Indonesia 20210315 2nd (11:30)

1045 50613916 MUSTOFA ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1046 50610962 PERAK INDIKA M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1047 50611837 MARUF AFIF M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1048 50611601 SUPARYO TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)
SUTRISNA RIDHWAN
1049 50610969 M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)
RAHMATULLAH
1050 50614203 SANTOSO PRIAGUNG BUDI M Manufacturing > Measures CBT Test room-Indonesia 20210315 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1051 50611663 TAUFIK ILHAM M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1052 50611911 SADELI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1053 50613888 SIMANJUNTAK AMILUDDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1054 50614127 SUSANTO AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1055 50613011 WARDI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1056 50611129 MAUDIN MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1057 50611072 JUARIYANINGSIH SITI F Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1058 50612921 GANANG MUHAMMAD AZFARZ M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1059 50614096 AMRULLAH MUHAMAD KHANIF M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1060 50614142 AYATULLOH ROHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1061 50614322 FATKHUROHMAN AZIZ M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1062 50611338 ROSALINA MIA F Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1063 50614154 PERMADI ROBBI CANDRA M Manufacturing > Measures CBT Test room-Indonesia 20210315 3rd (14:00)

1064 50613971 ARIFIN CHOIRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1065 50614043 SANJAYA ERPIN FIKO M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1066 50613419 ROHIM ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1067 50612386 SUPARMAN NANANG M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1068 50614368 APRIYADI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1069 50611298 NURROZAQ MOH M Manufacturing > Measures CBT Test room-Indonesia 20210315 3rd (14:00)

1070 50613638 SAFITRI ADELYA INDAH F Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1071 50612770 SAIDIN NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1072 50612128 BAGJA M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1073 50612055 WASIMO M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1074 50610903 JUMAWAN DAVID M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1075 50613437 FIYANTO ROBET NUR M Manufacturing > Wood joinery CBT Test room-Indonesia 20210315 3rd (14:00)

1076 50612906 BASORI ROHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1077 50614394 LESTARI OKTARINA TRI F Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1078 50612421 PUTRA SOFYAN EKA M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1079 50613799 ISMANTO ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 3rd (14:00)

1080 50613884 JULIANA DELI F Manufacturing > Wood joinery CBT Test room-Indonesia 20210315 3rd (14:00)

1081 50612897 NUGROHO BAYU M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1082 50611545 AZIZ LUTFI NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1083 50614342 AGUSTINA TINA F Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1084 50614091 ARIYANTO FIRMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1085 50612864 YUNGLE MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1086 50612993 JARODIN AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1087 50612848 MARSONO M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1088 50614033 PUTRI MULNIA BUSRIANA F Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1089 50612157 TRIANTO WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)
FIRMANSYAH MUHAMMAD
1090 50613649 M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)
MULIA
1091 50611723 PARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1092 50610745 DARYO M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1093 50614094 DINATA ARDI RAMA M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)
SYAPUTRA TARSITA
1094 50611200 M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)
FEBRIYANSYAH
1095 50612218 MURTI AZIS KUSUMA M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1096 50612087 HIDAYAT SARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1097 50612334 BAEQUNI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1098 50613826 NOVANTRY M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1099 50613230 SIRHIDAYAT EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1100 50613085 TARMUJI M M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1101 50613701 IRAWAN RUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1102 50612812 LESTARI EKA PUJI F Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1103 50610773 ALDISA RENDI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210315 4th (15:30)

1104 50611294 NURIDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)
PUTRA SAFRI AKBAR
1105 50612739 M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)
MUNDADIKA
1106 50612454 AMRULLOH HABIB M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1107 50614310 SUCIPTO ARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1108 50614312 LASE BERKAT FEBRIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1109 50612152 KURNIAWAN ABI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1110 50613825 A PERINGKI. M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1111 50614295 SADZILI HASAN ASY M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1112 50610835 HIDAYAT HAMZAH NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1113 50614035 SUGIONO ASEP M Manufacturing > Wood joinery CBT Test room-Indonesia 20210315 4th (15:30)

1114 50612588 PRAYOGA WENDY M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1115 50612353 YULIONO ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1116 50612862 MUKTI IMAM PRIYO M Manufacturing > Assemble CBT Test room-Indonesia 20210315 4th (15:30)

1117 50610805 DARKANA JIMAT M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1118 50611033 RINALDI DANDI MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1119 50612032 RUSMONO M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1120 50611954 SETIAWAN ANGGA ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1121 50611605 SUSANTO ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1122 50611883 ASRI DODI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1123 50610777 AZIZ IZWAN MAULANA M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1124 50611233 FURKHON M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1125 50612053 MARDIONO M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1126 50610847 GUNAWAN AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1127 50613186 RIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1128 50612469 EFENDI SONI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1129 50614353 ADNAN SYAIFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1130 50613639 SUWANDI ILAL M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1131 50614206 SETIYO BUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1132 50613960 NURCAHYONO ARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1133 50613508 SARI NOVITA F Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)
ANSORY MOHAMMAD NAUVAL
1134 50612808 M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)
RAHMAN AL
1135 50613114 FATONI M M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1136 50613299 LABIB AKHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1137 50610828 SYAMSUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1138 50611003 KARLINA NOVI F Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1139 50611354 GALIH BIMA SATRIA M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1140 50611009 FATUROHMAN DIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1141 50611478 NINGSIH DWI YULIA F Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1142 50614197 MARIANA WIDA F Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1143 50611365 MAULANA AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1144 50612936 MASYITOH F Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1145 50613886 YULIANTI NOVI F Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1146 50613486 PANGESTU GILANG AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1147 50611223 PERDANA YONAS BINTANG M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1148 50611471 UMAMI DIAN FARICHA F Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1149 50613771 MUNIR MISBAHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1150 50612377 CRISTIANTO ANGGIT M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1151 50612967 AMRULLAH IRKHAM M Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1152 50611813 NOVIANTI LIA ARINA F Manufacturing > Assemble CBT Test room-Indonesia 20210316 1st (10:00)

1153 50613260 PURNOMO MOH ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1154 50613807 ANGGRIAWAN EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1155 50612290 HARYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1156 50614089 KURNIAWAN ANGGA M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1157 50613507 SAID AJI CASTIAR M Manufacturing > Wood joinery CBT Test room-Indonesia 20210316 2nd (11:30)

1158 50612452 MUKHIBAL KENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1159 50613908 MAULANA RIZKY M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1160 50614370 ARIFIANTI DWI AYU F Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1161 50613350 HAKIM MOHAMAD NURUL M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1162 50612278 SANURI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1163 50614151 DENIKAH F Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1164 50612052 NURHOLIS MUHAMAD MUSLIH M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1165 50611997 FITRI ANNISA F Manufacturing > Measures CBT Test room-Indonesia 20210316 2nd (11:30)

1166 50612085 HARAHAP BONA MARTUA M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1167 50611998 BELA SINTA F Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1168 50612351 PRATAMA REZA HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1169 50614299 ANDIONO M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1170 50613537 PRATAMA KIKI SEVIAN ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1171 50612494 PAMBUDI TRIYOGA BAYU M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1172 50611560 SAFARI HAMZAH M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)
P RAHARDIAN YUDISTIRA
1173 50610996 M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)
SATRIA
1174 50611670 SOFYAN EDI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1175 50614293 FAZRI SOLIKUN M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1176 50614063 YANI FITRI F Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1177 50612003 MALIK MUHAMMAD HISYAM M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1178 50613078 YUDISTIRA SELVIA F Manufacturing > Measures CBT Test room-Indonesia 20210316 2nd (11:30)

1179 50614052 PURNAMA AGUNG SEPTA M Manufacturing > Wood joinery CBT Test room-Indonesia 20210316 2nd (11:30)

1180 50610749 DULKAHAR M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1181 50612677 KURNIAWAN AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)
NURROHMAN MUHAMMAD
1182 50611016 M Manufacturing > Wood joinery CBT Test room-Indonesia 20210316 2nd (11:30)
ALFIANSYAH
1183 50612866 ADITTIYA WAHYU NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1184 50610717 FAHRI SYAMSUL M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1185 50612960 ALFADLI ABDUL KHAYI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1186 50611158 SAPUTRA HENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1187 50611075 TIRYANA M Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1188 50614110 MARBUN ANNA FRISKA F Manufacturing > Assemble CBT Test room-Indonesia 20210316 2nd (11:30)

1189 50612791 YULIANTO IRWAN AMBAR M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1190 50611720 ANWAR SHOLEKHUN M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1191 50614380 HASANUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1192 50611370 REGEN LENOK M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1193 50610830 SHOLIHIN MOH M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1194 50611849 JUNIANTO VENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1195 50612632 TASRUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1196 50613876 NAWAWI IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1197 50613284 ROHMAN FATHUR M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1198 50613898 MAULANA BISMI TAUFIK M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1199 50613037 SYAH MUHAMMAD ALFIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1200 50612480 PRASETYADI DITYAN AGIL M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1201 50614118 SUHENDRO M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1202 50610841 SETIAWAN DADAN M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1203 50613665 GINTING EMBASTANTA M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1204 50612331 SUYANTO HERI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1205 50612011 RAMDAN HADDAD M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1206 50612798 TRIADI MEGI M Manufacturing > Measures CBT Test room-Indonesia 20210316 3rd (14:00)

1207 50611696 RASMAT MAMAT M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1208 50613028 ARIF RIFKI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1209 50612017 NOVIKA DIAN F Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1210 50612199 NUSANTARA SATRIAJI PANDU M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1211 50611607 LEXMANA LUKI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1212 50614275 MAHESA RAJA M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1213 50612898 WICAKSONO SAPTO HARRY M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1214 50612314 NUROFIK M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1215 50612188 WAHONO DIDIK M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1216 50611614 WULANDARI F Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1217 50613378 LUTFI ROIN MUHTAR M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1218 50612049 ALWI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1219 50611419 SAPUTRA NURYADIN M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1220 50613503 ANDRIO RINCE M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1221 50610705 SUKARTA M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1222 50612225 PERDANA RIZKY M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1223 50612303 SUDIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210316 3rd (14:00)

1224 50611622 SUDAYA CECEP DENI M Manufacturing > Measures CBT Test room-Indonesia 20210316 3rd (14:00)

1225 50613262 PRIYADI HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1226 50613364 MUGHNI M HARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1227 50611229 RISMAWAN ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1228 50614268 PUJIAWATI DEDEN F Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1229 50614161 RAHARJO SLAMET M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1230 50610741 MAULANA OQI ERFAN M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1231 50614393 NOVRIO ALFANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1232 50613409 UMARUDDIN RIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1233 50611051 SAPTAHADI FARHAN M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1234 50613624 SARI RATNA F Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1235 50613842 HERIYANTO ANGGIE M Manufacturing > Measures CBT Test room-Indonesia 20210316 4th (15:30)

1236 50614364 WIJIHANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1237 50611366 DHARMAWAN MOCHAMMAD EGI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1238 50614053 PRAYITNO EDI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1239 50612113 FEBRYANTO DICKY M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1240 50612486 NADIROH UMI F Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1241 50611904 HARTONO M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1242 50612976 TAUFIK MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1243 50611794 SUHENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1244 50613363 FIRMANSYAH NOUVAL ERIZA M Manufacturing > Measures CBT Test room-Indonesia 20210316 4th (15:30)

1245 50614262 ANSORI FALAH YOGA PRATAMA M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1246 50611350 MARWAH F Manufacturing > Measures CBT Test room-Indonesia 20210316 4th (15:30)

1247 50611353 MALIK EKA M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1248 50610792 ANDRIYANTO MOHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1249 50613603 AKSYARA ALFHARIZI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1250 50612518 YANI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1251 50612307 ARWANI WAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1252 50613086 ABDULLAH RIO SURYA M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1253 50611036 SAMSUL M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1254 50611830 KURNIAWAN MUHAMAD NANDA M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1255 50614311 RIZKY RAMDHAN KASIRON M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1256 50611645 JULIAR BILY M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1257 50610902 RIYADI DENI M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1258 50613163 PRADANA DIO M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1259 50612136 RAMADHAN DIOGIA AMBANG M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1260 50613048 GAUS MOH.AFRIZUL M Manufacturing > Assemble CBT Test room-Indonesia 20210316 4th (15:30)

1261 50611442 SANNI AJENG TIARA F Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1262 50612283 ARMADANY DINIE F Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1263 50612009 NABABAN NOVA F Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1264 50611498 ROEMI F Manufacturing > Measures CBT Test room-Indonesia 20210317 1st (10:00)

1265 50613668 KOLBI NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1266 50613743 HIDAYAT GUNTUR M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1267 50612301 HAKIM MUKROMIN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1268 50613069 ARIZKI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1269 50611581 BAEHAQI M MUAZIS M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1270 50611244 KHASANUDIN MUKHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1271 50613613 LESTARI IKE F Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1272 50612966 KURNIAWAN FAJAR M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1273 50613921 MARUP AMAR M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1274 50613219 NANGIN SOKHIBUN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1275 50611642 MULYONO PUGUH M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1276 50613892 WALIDAINI BIRRU RIFAI F Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1277 50613576 ANDIYANTO RIO M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1278 50611952 BAHAUDIN AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1279 50613935 HANGGARA HENDRI M Manufacturing > Measures CBT Test room-Indonesia 20210317 1st (10:00)

1280 50612395 SULISTIAWAN ANTON M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1281 50610696 DURYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1282 50614183 THAHIRU MAHIR M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1283 50611596 ARIPIN JAENAL M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1284 50610736 SUPARYO M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1285 50612437 AGUSTINA DANIA PUTRI F Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1286 50611810 SETIAWAN NANDA M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1287 50612800 SUHENDRIK M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1288 50612564 SIAM FATKHU M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1289 50614120 SULISTIONO AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1290 50613793 ABDIANTO DEVAN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1291 50611251 NURMUJAHID DEDE MUH M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1292 50610831 SARTANI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1293 50611209 SEPTIYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1294 50611364 SETIAWAN QORI M Manufacturing > Measures CBT Test room-Indonesia 20210317 1st (10:00)

1295 50614102 SUNARTA M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1296 50611212 KHOLIS SYAMSUL NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210317 1st (10:00)

1297 50612585 ANDIKA AAN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1298 50611458 HANIFAH ABU M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1299 50611119 ABIDIN ZAENAL M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1300 50612047 MURDIANTI LINDA F Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1301 50613134 ALFAN ROUF M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1302 50612711 SEPTIANSYAH BENNY MAHLIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1303 50611515 HIDAYAT UJANG M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1304 50610807 HASANAH SOPIYATUN F Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1305 50611463 HERMAWAN HENDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1306 50612216 IQBAL MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1307 50611239 SYARIPUDIN AYIP M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1308 50612780 PRASTYO AJI DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1309 50612134 WAHYONO TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1310 50610827 RANADITYA FIKRY M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1311 50613540 ERNANDA YAYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1312 50611276 ROHMAN SYAEFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1313 50613243 SUDANA PRI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1314 50612846 MAHENDRA SUBEKHI ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1315 50610888 AMIRUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1316 50610855 HERMAWAN RIYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1317 50611861 SUTRISNO TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1318 50612915 PRAPTOMO CHANDRA SURYA M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1319 50611775 ARIFIN ZAENAL M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1320 50612204 KURNIAWAN ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1321 50612328 UMAR SODIKUL M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1322 50613632 KURNIAWAN DENI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1323 50613387 JULIANDA M. RIKO M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1324 50612443 PUTRA EFENDI DIANA M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1325 50613570 HENDRO M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1326 50613881 GINTING IYA PRIMSA M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1327 50611835 HANISA NUR F Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1328 50613642 ALAMSYAH PANJI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1329 50614389 FIRMANSYAH FIKRI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1330 50614000 SETIAWAN AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1331 50614144 SUSANTO EDI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1332 50611774 SITOHANG OTTO ORIVER M Manufacturing > Assemble CBT Test room-Indonesia 20210317 2nd (11:30)

1333 50611062 RAMIN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1334 50611261 UMAM KHAERUL M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1335 50612580 GUMILANG RIFAL M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1336 50612013 MUNANDAR ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1337 50614224 CASMITA RIZAL NOVI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1338 50611920 YULIANTO EDI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1339 50611457 ARIFIN REZA M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1340 50614025 ABDULLAH SYAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1341 50613536 HAKIM RISKI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1342 50612470 MAULANA AWALUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1343 50612767 ALIFFUDIN RIDHO M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1344 50612509 RAHMAWATI ANI LUSSY F Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1345 50613095 SUGIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1346 50610856 SUNANTA M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1347 50612274 UMAM KHAERUL M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1348 50611908 SAPUTRA ERYK M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1349 50614088 LUBIS USMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1350 50612281 ARDIYANTO WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1351 50612201 PRASETIO SIGIT M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1352 50613555 SAPUTRA TONI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1353 50611625 RIZKI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1354 50612900 KARTIKO WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1355 50612681 ROFII IMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1356 50612828 MUFID ALIP NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1357 50611832 SAEPULLOH M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1358 50612508 JEFRI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1359 50612999 SAPUTRA PANJI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1360 50612369 HILALUDIN ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1361 50612040 ARIZAL TAUFIQ M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1362 50611684 FAROKA EVAN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1363 50613464 ANDRIANSYAH ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1364 50614050 DALIMUNTE PIKO M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1365 50613526 ANTONI WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1366 50612246 SETIAWAN CHABIB SATU M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1367 50611609 ABADI GUS AMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1368 50611076 DWIPAYANA RINALDI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 3rd (14:00)

1369 50613569 PRAYOGO ANGGID M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1370 50610840 GUNAWAN HENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1371 50610768 KUSAERIH M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1372 50613612 MAULANA AMAR M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1373 50614249 SUNANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1374 50614070 PASARIBU WINDI NIKEN F Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1375 50611140 MAULANA MASANDEG AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1376 50613738 MELIANA TRI F Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1377 50614282 PRASETIYA DWIKY M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1378 50613231 HIKMAWATI ANIS F Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1379 50614164 SANTOSO AGUS DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1380 50611639 MEILANI F Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1381 50611922 PUTRA DWI AD M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1382 50613873 PRANANTO DENI EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1383 50612557 PRAMUNDITA BAGAS M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1384 50613988 PRIONO JULI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)
PRIMANANDA MUHAMMAD
1385 50614036 M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)
SHIDIQI
1386 50613334 PAMULARSIH SEKAR F Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1387 50612807 CAHYOWANTORO NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1388 50611915 FAUZI GUFFRON M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1389 50613837 SAPUTRA ANDRIAN RENALDI M Manufacturing > Measures CBT Test room-Indonesia 20210317 4th (15:30)

1390 50612439 RIFALDI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1391 50611029 RAKADIPA SHERDIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1392 50613092 PARWOTO M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1393 50612991 ASARI ABU MUSA AL M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1394 50612327 SIDIK MOH ABID M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)
RAMADHAN BAGAS REZKY ANDY
1395 50613240 M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)
PUTRA
1396 50614277 SULASTRIO WENENDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1397 50612266 HAKIM PANCA RAUF M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1398 50613306 NUGROHO RICKY M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1399 50612740 AISIH SITI F Manufacturing > Measures CBT Test room-Indonesia 20210317 4th (15:30)

1400 50612116 SAPUTRA M. ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1401 50612631 ADITYA IAN M Manufacturing > Wood joinery CBT Test room-Indonesia 20210317 4th (15:30)
HAKIM MOCHAMAD ARIF
1402 50612786 M Manufacturing > Measures CBT Test room-Indonesia 20210317 4th (15:30)
RAHMAN
1403 50612122 MANGLI YUSUF MAULANA M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1404 50613079 MASYKUR MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210317 4th (15:30)

1405 50612544 SUHERMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1406 50613543 ANGGANA WIRA DWI M Manufacturing > Measures CBT Test room-Indonesia 20210319 1st (10:00)

1407 50612137 PRAYOGA DIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1408 50612592 ANDRIYANTO FERI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1409 50613680 AFIFA SUCI RAHMA DHANI F Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1410 50611382 HIDAYAT AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1411 50611148 ALIPUDIN JOHAN M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1412 50613724 PALUPI AGIS F Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1413 50613273 GINANJAR M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1414 50612696 SUDARJI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1415 50611742 PRATAMA FRISYA M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1416 50612308 FUDIN WAFI AMSA ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1417 50610915 NURYAMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1418 50611024 SUTANDI DEDE M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1419 50610921 RAMADHAN AHMAD NASIR M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1420 50612063 MARUF M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1421 50612734 AFIP RIFAN KHOIRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1422 50612341 DARNYA M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1423 50612104 WALUYO UTOMO BUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1424 50612825 SARTONO EDI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1425 50612270 SAPUTRA DIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1426 50613458 PUTRA RIZKI DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1427 50612322 ADIBUSSOLEH MOH M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1428 50613915 SIDDIQ ARIFNUR M Manufacturing > Measures CBT Test room-Indonesia 20210319 1st (10:00)

1429 50613937 ARDIYANTO FERY M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1430 50613355 PRASETYA AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1431 50612272 GUNAWAN ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1432 50610966 ROHMAN KIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1433 50612079 GUNAWAN RONI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1434 50612376 FITRIANTORO TOFIK IKA M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1435 50613129 WIJAYA M ILYAS SATRIA M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1436 50611046 ATIN F Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1437 50614273 ARIPIN M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1438 50612765 ARIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1439 50612177 WAHYUDINSAH BELLI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1440 50613252 AMARULLOH RIZIK M Manufacturing > Assemble CBT Test room-Indonesia 20210319 1st (10:00)

1441 50611615 JUNAEDI DEDIH M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1442 50612700 SYUHADA AHMAD NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1443 50612851 GUMELAR DODI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1444 50612094 SAPUTRA FIKRI ABIZARS M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1445 50612818 PRAPNGANI ABI ISLAMI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1446 50612955 ZUHDI ISMAN MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1447 50610931 KURNIAWAN WAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1448 50611260 MUQODDAM ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1449 50612144 AGMALUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1450 50613882 SANTOSO M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1451 50613249 JANANI FATKHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1452 50612419 MELYANTI RIA F Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1453 50610939 HARDIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1454 50611109 REPIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1455 50613366 PANGESTI NICKEN AYU F Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1456 50613476 ARBACH WANDA NANDA M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1457 50614181 SARI ANJANI EKA F Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1458 50611959 INDRIYANI AYU F Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1459 50613316 PANGESTU FARHAN AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1460 50613073 SUPRIHATIN JOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1461 50612947 MARGIYANTO AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1462 50613357 ANWAR ROBI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1463 50613827 AZIZAH F Manufacturing > Wood joinery CBT Test room-Indonesia 20210319 3rd (14:00)

1464 50612702 KUSWOYO MEI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210319 3rd (14:00)

1465 50612433 KHAFIDH AJI IMAN NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1466 50611692 WISANDRA UKI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1467 50614166 SIBARANI GUNTUR HAPOSAN M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1468 50612006 DONI ALDIO ROMA M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1469 50611068 SUWANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1470 50614073 MUJAYANAH TITIN F Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1471 50611184 WINATA RAHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1472 50611733 RIPAI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1473 50611758 HANDOYO ANANG DONNY M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1474 50612804 SETIAWAN AGUS BUDI M Manufacturing > Measures CBT Test room-Indonesia 20210319 3rd (14:00)

1475 50613234 HIDAYAT MARUF M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1476 50612755 KASUMBANG GALIH KASA M Manufacturing > Assemble CBT Test room-Indonesia 20210319 3rd (14:00)

1477 50611591 NURUDIN M Manufacturing > Measures CBT Test room-Indonesia 20210319 4th (15:30)

1478 50611523 FATHUNNISA F Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1479 50612625 SODIKIN ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1480 50613144 SETIAWAN AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1481 50613389 SANTOSO BUDIMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1482 50612753 FAJAR MUALIP M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1483 50613922 PUTRA SETIAWAN HARTONO M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1484 50612759 SOLEHUDIN IRWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1485 50611349 SAPUTRO LILIK AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1486 50612154 DENIAL AMRI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1487 50613823 ARIFIN MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1488 50611368 JULIANTO APIP M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1489 50611242 PRASETYO JOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1490 50610920 SUPRIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1491 50611462 AHDIYAT YAYAT M Manufacturing > Wood joinery CBT Test room-Indonesia 20210319 4th (15:30)

1492 50612374 IRFANDI RAFI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1493 50611363 HARAFA ANDREAN M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1494 50611176 MUSLIMAH F Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1495 50612530 FRISKA F Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1496 50612725 PERTIWI ROSSA YANTI GENTA F Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1497 50612660 PURWOTO M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1498 50611130 MAFTHUHATURRAHMAH FIZRIN F Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1499 50613602 SETIAWAN RIO AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1500 50613042 EDITIAWARMAN NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1501 50613694 HARYATI RATI F Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1502 50614015 SUROTO PRAMUDI HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1503 50610911 SYAHRONI ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1504 50612596 NURFAUZI EMIL M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1505 50613238 RAHMAWATI TRI AZIZAH F Manufacturing > Measures CBT Test room-Indonesia 20210319 4th (15:30)

1506 50614381 BUDIYONO ANANDAR M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1507 50612685 TARMIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1508 50613294 AJI NUR INGAT RIDHO M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1509 50612262 KUSUMA CANDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1510 50611255 PERMANA AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1511 50611238 AYIP MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1512 50612169 MUAZIZI MHAKIM M Manufacturing > Assemble CBT Test room-Indonesia 20210319 4th (15:30)

1513 50612621 ROJIKIN MOHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1514 50612726 GUNAWAN TOFIK M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1515 50611281 MAULANA ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1516 50611608 SEPUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1517 50611427 ABDULLAH M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1518 50611845 PRASETYO SULES EDI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1519 50612647 KHAERUL ABDUL M Manufacturing > Wood joinery CBT Test room-Indonesia 20210322 1st (10:00)

1520 50610817 SUPRIYADI MOH JOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1521 50613699 WIBOWO FIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1522 50611919 ANUKMAN DESI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1523 50613165 MUJITO M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1524 50614156 INDRAWAN ZAUL HAQ M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1525 50610723 SUYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1526 50610836 PRADANI ANGGI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1527 50614099 SURONO BAMBANG JOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1528 50611762 SETIAWAN DIDIK M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1529 50612554 CECEP M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1530 50613682 APRIYADI RICKY M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1531 50613521 PRADIPTA OKTAMA RENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1532 50611122 SAEKAH F Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1533 50611618 WASJUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1534 50611812 AMIN NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1535 50613344 HAMBALI MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1536 50612986 PRASETYO ALDI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1537 50612018 MADHONI ILHAM KHOIR M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1538 50611468 IHSANUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)
PRATIKNO MOHAMAD RAHMAT
1539 50613242 M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)
RIZAL
1540 50611814 SUPRIAWAN ILMI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1541 50610709 ISRA RAMLAN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1542 50611887 PURNOMO AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1543 50614361 SANTANA DENDEN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1544 50614258 SIAHAAN SAMUEL PARSAORAN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1545 50612718 SALIM RIDWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1546 50611342 AZIZ MUHAMAD ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1547 50614335 ZEBUA ONDREKHATA M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1548 50612850 FAUZAN AHMAD ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 1st (10:00)

1549 50612098 PAHLEFI M AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1550 50613987 ARIFUDIN IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1551 50611267 WICAKSONO HERU ROSY M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1552 50614188 WAHYUDI BAMBANG M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1553 50613906 SITORUS DEWI SARTIKA F Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1554 50614308 PRATAMA ANGGA M Manufacturing > Wood joinery CBT Test room-Indonesia 20210322 2nd (11:30)

1555 50611102 ALAWI MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1556 50613726 KELLY JIM M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1557 50610998 FAUZI HAMDAN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1558 50613534 PIRDAUS ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1559 50611685 SUMARNI F Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1560 50613107 MUNAJAT MUNIF M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1561 50611979 RIFAI FAISAL M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1562 50611340 RUSPANDI DEDE M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1563 50612535 AJI DENDI PURNAMA M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1564 50613675 FADHILAH SYAHRINA F Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1565 50612071 SUPRATIKNO SUKUR JUNI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1566 50610872 PRATAMA YOGI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1567 50613504 SUTRISNO ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1568 50614124 BAGYO M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1569 50611263 MULYANA SONA M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1570 50614379 SINGGIH FAJRUL HAZANA M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1571 50612562 NUROCHMAN ALDIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1572 50611981 ZAKI AHMAD ROIS M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1573 50611204 SURYANTO HENDRIK M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1574 50611727 ALDI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1575 50611593 SUGIHARTO M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1576 50612302 ABDULLAH AKBAR M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1577 50613407 WIJAYA ANDREAN ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1578 50612878 NURHADI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1579 50612414 SYAIFUDIN MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1580 50614078 AKTIANSYAH ROBY M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1581 50612810 ROMADHON SYAHRU M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1582 50611079 RIFQILLAH MUKHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1583 50611554 SUKARNA INDRAYANA M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1584 50613041 WAHYUDIN MOHAMAD RIZKI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 2nd (11:30)

1585 50611141 HUTAJULU HARDYANTI F Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1586 50612708 HAIDAR M ZULFIKAR M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)
SULAEMAN OKTAVIAN
1587 50612429 M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)
HENGGAR ADITYA
1588 50610866 ROMADONI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1589 50610729 WAHYUNI SRI F Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1590 50611603 YUDISTIRA DENY M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1591 50614385 MAKHMURUDLA IKHWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1592 50611332 NOVIYANTI RINA F Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1593 50611470 SANTOSA DENI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1594 50613211 APRIANA AINUN F Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1595 50614215 NASHIRIN AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1596 50613512 HARYANTO DODI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1597 50612489 DARMANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1598 50611516 SARI DIANI NOVIA F Manufacturing > Measures CBT Test room-Indonesia 20210322 3rd (14:00)

1599 50613429 MUFRODI FUAD M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1600 50614350 PRATAMA BAYU AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1601 50612426 INAYAH VIVI F Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1602 50611556 SYAH TEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1603 50614317 ANDRI JIMMY M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1604 50610713 WIJAYA RIZKY MULIAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1605 50610974 HANDOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1606 50613765 SAPUTRA YULI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1607 50611854 SAPUTRA PRATAMA ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1608 50612507 ALAZID MUKMIN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1609 50612498 HABIB M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1610 50611137 HIDAYAT SYARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1611 50614231 QOMISATUN PRYA APRILIA F Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1612 50610894 ROSYID IHAB M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1613 50612069 SUBANDI ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1614 50613829 SUTEJO M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1615 50613156 TOHARI MOHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1616 50612255 TARSONO M. M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1617 50613684 SETIADI CECEP ANDI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210322 3rd (14:00)

1618 50612391 JUNIANTORO RISCI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1619 50610898 SAFEI MOH ANANG M Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1620 50614378 INDRIYANI NURI F Manufacturing > Assemble CBT Test room-Indonesia 20210322 3rd (14:00)

1621 50613673 ANSORI MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1622 50613415 PUTRA TRI ADITYA PRATAMA M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1623 50612084 MULIAWANTO FIRMAN NUGRAH M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1624 50613418 ARIYANTO ANDRE FELIX M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1625 50612392 KAMHAR ILHAM M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1626 50612389 AMAMI M RIZAL M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1627 50611388 YANABARATI ELI F Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1628 50611460 WIBOWO FATIQULLABIB M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1629 50611121 IKHSAN ROBIUL M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1630 50612806 ALFITRIAN IRKHAM MURROFIQ M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1631 50613126 SUGIARTO IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1632 50612441 FIRMANSYAH FERDI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1633 50614076 GUNAWAN SAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1634 50612123 BUDI GUNTUR SETIA M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1635 50611391 AFANDI FIRMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1636 50611324 RIFAI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1637 50613223 MUJIONO M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1638 50613462 SYAPUTRA RENDY M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1639 50611510 FIRMANSYAH WIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1640 50611909 FAHRIZAL YUSRI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1641 50612650 KURDIANTO NANANG M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)
SUDRAJAT MUHAMMAD BAGUS
1642 50614140 M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)
MAKSUM
1643 50613328 NUGROHO DIMAS TAMPI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210322 4th (15:30)

1644 50614228 SYAFIQ MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1645 50612402 SYAIFULLOH LATIF M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1646 50611801 ABDILLAH M Manufacturing > Wood joinery CBT Test room-Indonesia 20210322 4th (15:30)

1647 50611984 PUJIARTO ANDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1648 50610810 SANUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1649 50614375 MAULANA REZA M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1650 50611178 SANICIH F Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1651 50612042 HIDAYAT WIGGI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1652 50611932 PRAKOSO ANUGRAH TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1653 50612781 HARTOYO CIPTO M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1654 50614362 SANTOSO M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1655 50613425 SOLEMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1656 50611542 KHAFID ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210322 4th (15:30)

1657 50613928 ADITYA MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1658 50612511 RIFAI INGGRA IRFAN M Manufacturing > Wood joinery CBT Test room-Indonesia 20210323 1st (10:00)

1659 50613295 ALWI SYARIFUDDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1660 50611942 WALUYO HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1661 50613440 KURNIAWAN RAHMADI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1662 50614307 SIHOMBING EDI SUSANTO ADEN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1663 50611274 SOFANUDIN MAFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1664 50613516 SETIAWAN PUNGKY WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1665 50613054 SATMOKO YAYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1666 50611606 SETIAWAN WAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1667 50613582 VREINSI MEILA F Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1668 50611806 JULIANSYAH SEMBARA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1669 50610758 SHADRI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1670 50611531 SUPARDI MANSYUR M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1671 50611010 NUGRAHA FITRANSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1672 50612145 APRIANTO RIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1673 50613510 ALAMSYAH AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1674 50612493 FEBRIANTI F Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1675 50613736 FIRMANSYAH FINGKI MARHAIN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1676 50613495 HANAFI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1677 50611653 JENI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1678 50613968 ALFIAN RISKI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1679 50613210 GUMILAR AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1680 50610823 FAISAL M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1681 50613309 MUNANDAR ARIP M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1682 50611737 RAMADHAN ALFANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1683 50612973 ANJAYA MARTA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)
ERLANGGA RYAN RENALDY
1684 50612261 M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)
GAZZA
1685 50613337 RAHARJO ERWIN M Manufacturing > Wood joinery CBT Test room-Indonesia 20210323 1st (10:00)

1686 50611291 NURDIANSYAH ARIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1687 50611301 HANDRIANSYAH VIKO M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1688 50614227 ARIPIN TANTO M Manufacturing > Wood joinery CBT Test room-Indonesia 20210323 1st (10:00)

1689 50610825 TASJID MOH M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1690 50611456 MAULANA ROBBY MUHAMAD M Manufacturing > Wood joinery CBT Test room-Indonesia 20210323 1st (10:00)

1691 50611669 SUDRAJAT SOVI ANGGA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 1st (10:00)

1692 50612699 PRIYANTO UJI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210323 1st (10:00)

1693 50614112 AGUSTIN EVA YOHANNA F Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1694 50611547 WAHYUDIN MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1695 50613421 SUPRATA WILSEN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1696 50613985 ARTA M ZAKI JEMBAR M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1697 50611143 MUBAROK SULTON M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1698 50614255 ARWANTO RIYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1699 50612722 RINI LIANA EKA WAHYU PUSPITA F Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1700 50612547 PUTRA FIKI SATIOKA DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1701 50610999 KARIM MUCH ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1702 50612240 MASKHUR ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1703 50614198 DHARMA BAYU ADITYA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1704 50613547 IRAWAN ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1705 50613287 RATNASARI DESI F Manufacturing > Measures CBT Test room-Indonesia 20210323 2nd (11:30)

1706 50613887 MUHAZIRIN USEP DADIN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1707 50613905 AFIFUDDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1708 50611955 SUGIARTO ASEP M Manufacturing > Measures CBT Test room-Indonesia 20210323 2nd (11:30)

1709 50611381 SUPRIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1710 50612227 HIDAYAT SAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1711 50611256 RAMADHAN MUHAMMAD YUSUF M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1712 50612239 MARSINATA BIMA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1713 50611257 MELATI SEKAR F Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1714 50613646 RAMADANI GEGE ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1715 50613056 MANSUR IQBAL TAUWIL M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1716 50610848 GUSTIANA YUDA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1717 50610870 TOHIRUN MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1718 50611931 PURNAMA RAFI DHEVA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1719 50614121 NABABAN LILIS KARLINA F Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1720 50614013 NUGROHO ALVIN AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1721 50610907 FATUROHMAN ALANA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1722 50613542 MASHURI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1723 50611180 SAMIUN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1724 50610886 HIDAYAT SARIP M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1725 50613148 SABBIT LUTHFI SADDANIATUL M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1726 50611386 SANURI NURI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1727 50611320 SUWANDIKA IKA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1728 50613441 PRANOTO TATANG M Manufacturing > Assemble CBT Test room-Indonesia 20210323 2nd (11:30)

1729 50611754 S ARIEF RAHMAN HERTIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1730 50613850 SALIM M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1731 50612026 SETIABUDI NOVA EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1732 50611401 MUHIMIN ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1733 50611855 RIFAI AHMAD M Manufacturing > Measures CBT Test room-Indonesia 20210323 3rd (14:00)

1734 50611146 SUGALIH BERLIN TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1735 50610752 HARTONO EDDY M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1736 50610990 SIDIK ICHSAN PERMANA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1737 50611164 NUGROHO CHARISMA DIMAS M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1738 50611169 PURNAMA DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1739 50611914 RUSTONI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1740 50611167 RUHENDA EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1741 50613298 HARTONO JUNI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1742 50611197 RIYANTO WAHDAH ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1743 50612242 AZIS AKHMAD ABDUL M Manufacturing > Wood joinery CBT Test room-Indonesia 20210323 3rd (14:00)

1744 50612538 PRIYANTO AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1745 50612935 PRIYANTO ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1746 50612033 WAHYUDI RIZKI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1747 50611124 AZIZ ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1748 50613991 PRASETYONO BAYU M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1749 50611850 PRAKOSO HENGKI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1750 50612432 PUSPITASARI NUR F Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1751 50611268 KUSUMA KELPIN MAULANA TEJA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1752 50613712 ADELIA VINA F Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1753 50613867 UNTORO TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1754 50612448 TAMSULUDDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1755 50613560 SANDRA DEVINUR M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)
RAMADAN M THOMAS AL
1756 50614101 M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)
FATHUR
1757 50613103 FAOZAN IRFAN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1758 50614257 DARSIYAM M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1759 50611019 ZAELANI PIPIN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1760 50610889 SENOAJI BUDY M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1761 50611816 VERDYANTO DAVID M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1762 50614296 RIYANTO ABDUL AZIZ M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1763 50611404 PRAYITNO IIS M Manufacturing > Measures CBT Test room-Indonesia 20210323 3rd (14:00)

1764 50611995 PUTRA EKO JUNANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210323 3rd (14:00)

1765 50611325 NAMUN SUKRON M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1766 50612601 ISMANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1767 50613463 PUTRA LEO ADIKA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1768 50612497 PRASETIA IRFAN ADIT M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1769 50612311 NUHA ULIN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1770 50612746 HAKIM FAIZ AL M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1771 50610740 FAUZAN AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1772 50612393 HUTAMA HUDAYA PUTRA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1773 50614218 JAYUSMAN LUKMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1774 50611528 KRISTIAN PEGI HANDIKA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1775 50610924 UMIYATI F Manufacturing > Measures CBT Test room-Indonesia 20210323 4th (15:30)

1776 50612496 NEGARA I GEDE KRISNA ADITYA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1777 50611093 K ALDI RIVALDIANSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1778 50612459 PRATAMA AFIP JANUAR M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1779 50611266 PRIONO THOMAS M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1780 50612695 HERMAWAN FIQIH M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1781 50612254 NASUTION ADE M Manufacturing > Wood joinery CBT Test room-Indonesia 20210323 4th (15:30)

1782 50613696 PRABOWO ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1783 50613388 SASMITA OKKY M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1784 50612704 KURNIAWAN AGUNG M Manufacturing > Wood joinery CBT Test room-Indonesia 20210323 4th (15:30)

1785 50611355 KAEDAH F Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1786 50612793 NOVIYANTO ARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1787 50611104 INIRWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1788 50613405 KARNOTO M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1789 50611005 ADITIA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1790 50612077 RIANTO AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1791 50611485 WIJAYA ANGGA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1792 50613653 WARTOYO M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1793 50611831 WAHYUDI BAYU FEBRIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1794 50614313 PRIBADI SATRIA LANANG M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1795 50612769 SUGARA YUPONG DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1796 50612403 ANTOSO TIKO BAYU M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1797 50611037 RAMDANI MUHAMMAD FITRA M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1798 50612129 YULIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1799 50614363 MUMIN FATKHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210323 4th (15:30)

1800 50613499 MARUF MUHAMAD M Manufacturing > Wood joinery CBT Test room-Indonesia 20210323 4th (15:30)

1801 50610789 YULIANI IRMA F Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1802 50611116 SETIYANI EVI F Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1803 50612073 MUSTOFA AHMAD ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1804 50613828 PRATAMA TRISNA NANDA M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1805 50610814 ADHITYA ANGGI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1806 50611857 SAPUTRA EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1807 50612484 HADIANTO EDO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1808 50611649 FIKRIYANI M Manufacturing > Measures CBT Test room-Indonesia 20210324 1st (10:00)

1809 50611766 ALIUDIN MOHAMMAD EDHO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1810 50613430 AHMAD GOZALI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1811 50614232 SAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1812 50612573 ARIFIN MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1813 50613505 ALPIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1814 50612682 ROPII MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1815 50612599 ALIMUDDIN AKHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1816 50611496 SOFIAR HAFIS LUTFI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1817 50613077 PRADIKA TANZI NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1818 50611193 ABROR NASIKHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1819 50611378 ANSORI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1820 50613686 HELMI MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1821 50612329 DINATA RISKA ISKANDAR M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1822 50611056 FITRIANA LIA F Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1823 50613761 NOPRIANSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1824 50610879 NURDIYANSAH YUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1825 50611891 HUTAPEA MEITA Y F Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1826 50613071 AUPA IN AMUL M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1827 50612299 NAZAR MUHAMMAD SYAEFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1828 50610798 NURALAMSYAH PANJI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1829 50614184 AZIS ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1830 50610859 NAWAWI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1831 50612080 REKSIYANTO WANDA M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1832 50612193 TARYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1833 50614283 GUNAWAN M Manufacturing > Measures CBT Test room-Indonesia 20210324 1st (10:00)

1834 50612476 ISLAMI EMILIA F Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1835 50612356 CAHYONO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)

1836 50611250 NUGROHO DWI YULIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 1st (10:00)
PURWANTO MUHAMMAD
1837 50613061 M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)
TRIONO DWI
1838 50614237 PRATAMA HENGKI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1839 50613644 RUDINI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1840 50611680 WARTONO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1841 50612923 SAHRUDIN VIKI LUKMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1842 50612686 MAULANA MOHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1843 50612742 DEVALLIUS ANDIKI RADITYA M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1844 50610700 ARTAWIJAYA TOBBY BUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1845 50612398 HERMANTO BAMBANG M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1846 50610838 TEDIYANA M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1847 50613789 FIRMANSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1848 50611480 WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1849 50614377 ROHMAD AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1850 50612516 SETIAWAN BEKTI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1851 50612624 SANTOSA M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1852 50613756 SETIAWAN NURMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1853 50614225 TARYO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1854 50612381 INDAH F Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1855 50612757 WIJAYA SUKMA INDRA M Manufacturing > Wood joinery CBT Test room-Indonesia 20210324 2nd (11:30)

1856 50610890 RAMADHAN DENNI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1857 50611224 SARIPUDIN ASEP M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1858 50613291 HARYANTO ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1859 50613358 PRADIPTA REDO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1860 50613890 RIDWANSYAH IQBAL M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1861 50613994 ANDRIAN DANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1862 50612211 NURHIDAYAT RIZKI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210324 2nd (11:30)

1863 50612321 AHSIN ROBBI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1864 50612694 ALISYAHBANA UMAR M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1865 50611142 SAFITRI RANI ISNA F Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1866 50613122 ICHTIAR FAIZAL M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1867 50613381 ARIFIN M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1868 50613183 MARDIYANTO RAHMAN M Manufacturing > Measures CBT Test room-Indonesia 20210324 2nd (11:30)

1869 50612016 RIYANINGSIH F Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1870 50611644 TOHARI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1871 50613578 PRASETYO RIZAL WOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1872 50612210 FIRMANSYAH MOH. ATIQ M Manufacturing > Assemble CBT Test room-Indonesia 20210324 2nd (11:30)

1873 50613059 DESTRIYANI F Manufacturing > Measures CBT Test room-Indonesia 20210324 3rd (14:00)

1874 50611941 ANDRIYANTO DIMAS M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1875 50610845 SUPANDI DUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1876 50612548 RIFAI ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1877 50611732 FITRIANI HAMIDAH F Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1878 50611566 HIDAYAT DANDI RAMADAN M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1879 50611066 PUJIONO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1880 50610760 ABIDIN ZAINAL M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1881 50612561 GUNANDAR M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1882 50612088 RIZAELA JUNARIA F Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1883 50612297 PUTRA RENDI DANIELSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1884 50612833 SAOFI IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1885 50611283 APRILIYANI NIKKY F Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1886 50612836 MUSTOFA M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1887 50611788 MUBIN ARUL M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1888 50611617 AGUSTIN PENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)
MADURASYAH CANDRA
1889 50611015 M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)
WAHYUDI
1890 50613454 JUHRI SAEPUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1891 50613579 MAHYUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1892 50610980 WIBOWO ANGGUN M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1893 50614222 SOLEHUDIN ASEP M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1894 50612305 ALIFIYA NISA F Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1895 50613050 KHAENUROFIQ FAKIH M Manufacturing > Wood joinery CBT Test room-Indonesia 20210324 3rd (14:00)

1896 50611811 MASKURI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1897 50611006 GRAHA GENTA IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1898 50611551 YULIYANTO TIKO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1899 50613943 ALDINO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1900 50612659 IRWANTO ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1901 50613608 PRAMITA SINTIA F Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1902 50612221 SUTRISNO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1903 50613036 FALAH NURUL M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1904 50612868 RAHMAWAN DIKY M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1905 50611296 SYECHUROYAN M M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1906 50611938 HAMDI MUHAMAD RIFQI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1907 50613401 ARIFIN MUHAMMAD NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1908 50613529 NUHGROHO SINGGIH M Manufacturing > Assemble CBT Test room-Indonesia 20210324 3rd (14:00)

1909 50611697 BOWO TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1910 50611279 ANGGINI DEWI F Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1911 50612861 KANDO NANANG HENDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1912 50613434 SISWANTO ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)
MANSYURIANTO MGS
1913 50613814 M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)
MUHAMMAD
1914 50610685 KHALIK MUHAMAD IBNU M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1915 50611436 JUNAEDI JUJUN M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1916 50613003 PRIHANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1917 50611878 GUNAWAN ADAM JODI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1918 50612092 NURCAHYO ANDIKA BAGAS M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1919 50613914 HANAFI ANDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1920 50613652 RATNASARI F Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1921 50612191 SUSANTO JOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1922 50613127 FAIZUN ARVI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1923 50614172 PUTRA SUGISA M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1924 50613549 MARSIKO M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1925 50614360 RIZKY DICKY ZULIA M Manufacturing > Wood joinery CBT Test room-Indonesia 20210324 4th (15:30)

1926 50611173 HIDAYATULLOH USEP AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)
APRIYANTA MUHAMMAD
1927 50610986 M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)
RADITIYA TUGAS
1928 50612320 IRAWAN ANGGA M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1929 50611892 RIFKI SUBHAN NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1930 50611147 OKI MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1931 50610708 ADAM MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1932 50611834 GHONI ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1933 50611674 HENDRAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1934 50612209 PUSPITASARI RENI F Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1935 50614369 YULIANTO SOLEH M Manufacturing > Wood joinery CBT Test room-Indonesia 20210324 4th (15:30)

1936 50612342 HABIB PAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1937 50613362 JAENUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1938 50611730 PUTERI HELTA ISKANTI F Manufacturing > Measures CBT Test room-Indonesia 20210324 4th (15:30)

1939 50611292 DEVISKARRA GILDHA AYU F Manufacturing > Measures CBT Test room-Indonesia 20210324 4th (15:30)

1940 50614104 MAHENDRA ARYA IHZA M Manufacturing > Wood joinery CBT Test room-Indonesia 20210324 4th (15:30)

1941 50611777 WAHYUDI IRVAN M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1942 50613589 YANTI EVI DESTI F Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1943 50612890 PRAYUDI FRANSISKUS ADITYA M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1944 50611570 ZULKIFLI M Manufacturing > Assemble CBT Test room-Indonesia 20210324 4th (15:30)

1945 50610918 ROHAYATI ENDANG F Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1946 50614240 CASNIATI ERNI F Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1947 50613813 SURIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1948 50613253 ANGGARA BAYU M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1949 50613541 PUTRA DIKA PERDANA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1950 50611567 MULYANI SRI F Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1951 50611913 SANJAYA AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1952 50610993 ADITIA REGI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1953 50610959 PUTRA RIJKHY ALAMSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1954 50614223 SUSWANDI HERI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1955 50611486 ISKANDAR DEDE M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1956 50613862 ZULFANA PAWAS ICHZA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1957 50614390 ALKINDI JORDAN M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1958 50611765 OKTA RISKI CANDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1959 50613070 BUCHORI M IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)
ATARIQ MUHAMMAD SYAMSAL
1960 50613088 M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)
KAMAL
1961 50611624 PRAYOGI DIKA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1962 50611818 RULISTIO ERVIN M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
1963 50613025 PRANOTO ANDRIYANSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1964 50611912 HALAWA ONELIUS M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1965 50613020 LAZUARDI GALIH FEBY M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1966 50612430 DINA DITA FARA F Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1967 50612809 HASANUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1968 50610846 SUGIANTO BANGBANG M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1969 50610837 YANI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1970 50613182 ULUM SOKIBUL M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1971 50611293 MUJIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1972 50610945 SETIAWATI CITRA ERI F Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1973 50613923 MURNIASIH F Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1974 50612068 PAHLEVI RIFKY REZA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1975 50610735 QUBRO JAMALUDIN JUMADIL M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1976 50611411 TASORI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1977 50612086 PRASTOWO GANI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1978 50611828 ANUGRAH ARDIANSYAH HELA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1979 50613790 DEWI ELLA KARTIKA F Manufacturing > Wood joinery CBT Test room-Indonesia 20210325 1st (10:00)

1980 50612375 PRASETYO RIKI TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 1st (10:00)

1981 50610984 TRISNANDI ANDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1982 50612372 WAHYUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1983 50611346 YOSFIKAN CHIBNI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1984 50613621 EFENDI ILYAS M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1985 50614132 WARDANA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1986 50612614 WIGATI UMI F Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1987 50613634 FERDIYANSYAH RIZKY M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1988 50613370 KURNIAWAN RENDY M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1989 50610956 BAKHRI MOHAMAD SAEPUL M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1990 50614092 SAFITRI ADELA DWI F Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1991 50612464 SANTOSO MEYGIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1992 50610914 ISWADI DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1993 50613091 WIJAYA JAKA DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1994 50612023 SUPARNO M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1995 50613689 BERNANDI SEPTIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1996 50611867 PRILIYAN YUDISTIRA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1997 50613277 NURIYAH IRMA F Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1998 50613573 ROHMAD NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

1999 50612070 ARIANDI AGIL FREDI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2000 50612885 YUSUF ANTO RAMADANI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2001 50614155 IKTIARI RIA MAESAPUTRI F Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2002 50611334 RINO M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2003 50611741 SETIAWAN RISNANDAR M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2004 50612853 SAPUTRA RANDIKA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2005 50612405 HIDAYAT INDRA NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)
NURROHMAN MUHAMMAD
2006 50611128 M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)
SULTHON
2007 50611900 SUSANTO AFIF M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2008 50613347 YUNUS MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2009 50610738 SAMSUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2010 50613788 MAYRASNO INDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2011 50611059 SUWANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2012 50612457 ZAKARIA AZIZ M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2013 50613879 RONI ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2014 50613416 HUDA LUTHFI CHOIRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2015 50611439 KUMALASARI FIRDHA F Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2016 50611690 ARYANTO ERWIN M Manufacturing > Assemble CBT Test room-Indonesia 20210325 2nd (11:30)

2017 50611210 SURATNO FILDAN M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2018 50611162 NURAENI ANI F Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2019 50612750 HIDAYAT BOBY M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2020 50613269 ISMAIL M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2021 50612830 RIYADI AKHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2022 50610932 WASKANA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2023 50613120 ADRIANSYAH MUHAMMAD RIFQI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2024 50611347 MIFTAHUDDIN REZA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2025 50612820 RIFAI FIRMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2026 50613556 DEWANTORO M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2027 50612705 NINGRUM ANITA SARI F Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2028 50612788 INDIANSAH M Manufacturing > Wood joinery CBT Test room-Indonesia 20210325 3rd (14:00)

2029 50612856 FAIZAL ZULFI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2030 50611916 ANDRIAN ALDI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2031 50612431 DARUSSALAM ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2032 50614337 ARAFIK A M Manufacturing > Wood joinery CBT Test room-Indonesia 20210325 3rd (14:00)

2033 50613229 SUGIYARTO M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2034 50613200 ASADULLAH ABIMANYU M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2035 50611539 YUNIAR NINDI F Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2036 50612913 WIJAYA CANDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2037 50610849 EKI DEDE M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2038 50611869 KARNEGY ANGGERY M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2039 50613816 HENDRIONO M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2040 50611871 WIJAYANTI ERNI F Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2041 50614243 EFENDI USMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2042 50613803 MARYANTO BOBY M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2043 50611538 SANTOSO BUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2044 50613130 ANDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2045 50612905 QORNI WAIS AL M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2046 50612826 SOLEH NAZARUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2047 50613583 SARI LILIS ANDHIKA F Manufacturing > Measures CBT Test room-Indonesia 20210325 3rd (14:00)

2048 50612719 NURHADI DIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2049 50613838 RASYADHAN RACHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2050 50613501 HASUNI HARI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)
FAJRIANSYAH MUHAMMAD
2051 50613473 M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)
RIZKY
2052 50612730 JULIYANTO SANDI DION M Manufacturing > Assemble CBT Test room-Indonesia 20210325 3rd (14:00)

2053 50612926 ADITIA RIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2054 50612566 SURYOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2055 50612012 BESTARIANTO HENGKI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2056 50612961 BUSTOMMY MUHAMMAD YAZID M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2057 50611833 PRASETIYO PANJI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2058 50611351 AZZIS ABDUL MUKHYIL M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2059 50613609 AWALUDIN AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2060 50613149 FAUZI MUR HARUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2061 50611846 FREN JONI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2062 50611901 HASIBUAN AMIR HAMZAH M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2063 50612195 AZI RAVI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2064 50613927 LESTARI RANTI F Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2065 50613863 WALLY GIFFARY ZAKA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2066 50612658 MAULANA EMAN REGI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2067 50612000 SUBIANTO BAMBANG M Manufacturing > Measures CBT Test room-Indonesia 20210325 4th (15:30)

2068 50613330 OKTAVIANI NUR YATI F Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2069 50610725 ANUGRAH IQBAL CAHYA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2070 50611221 SANTOSO BUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2071 50611951 WINDIARSO STEFANUS M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2072 50614304 RIZKY ADE MOH M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2073 50611751 SURYAMAN MAMAN M Manufacturing > Measures CBT Test room-Indonesia 20210325 4th (15:30)

2074 50612715 KAMELIA SITI F Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2075 50613551 MASHUR M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2076 50611222 TRIYONO REZA M Manufacturing > Measures CBT Test room-Indonesia 20210325 4th (15:30)

2077 50610989 KURNIAWAN ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)
RAMADHAN BAGUS REZKI ANDY
2078 50613248 M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)
PUTRA
2079 50613427 APRIZON MEFTA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2080 50613027 IZAMI YAUPIK M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2081 50611231 PRASETYO TRI BAYU INDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2082 50611138 MARBELA AGRES M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2083 50612865 PRAYOGO PANDU M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2084 50611412 ROKIM M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2085 50611893 WANTININGSIH SUMARI F Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)
SAPUTRA MUHAMMAD
2086 50611163 M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)
RAMADHAN
2087 50611465 ENDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2088 50610982 KHAMID ZULFAN ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210325 4th (15:30)

2089 50612138 SITORUS DONNA MARINTAN F Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2090 50613674 PUTRA BAGUS ADI M Manufacturing > Measures CBT Test room-Indonesia 20210326 1st (10:00)

2091 50612505 ALILAHI SULAIMAN ALDI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2092 50611004 TAOHIDIN ANWAR M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2093 50613218 NUGROHO WIJANARKO FENDI M Manufacturing > Measures CBT Test room-Indonesia 20210326 1st (10:00)

2094 50612060 ARIYANTO IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2095 50611829 ZUBAIR MUCHAMMAD AZIZ M Manufacturing > Measures CBT Test room-Indonesia 20210326 1st (10:00)

2096 50613118 WIJAYA ANGGA M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2097 50612043 AZIS ROHMAN ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2098 50611731 SODIKIN OMNY MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2099 50612352 CHAFIDZOH IFFATUL F Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2100 50610925 ROHADI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2101 50613746 AFGANI OKCY AL M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2102 50611970 PRASETYO CASMANTO RIZKI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2103 50611792 CIPTA SISNUR M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2104 50614397 BAHRI SAMSUL M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2105 50611131 ALAMSAH M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2106 50612693 MAULANA AKMAD FHALIK M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2107 50614230 VIOLITA MAYLINDA VINA F Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2108 50612357 TRIYANA RAHMAT AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2109 50613894 TURYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2110 50613846 HENDRIADI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2111 50611557 SALAM ADE YANUAR M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2112 50614384 HAKIM LUQMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2113 50614269 NURPRAYOGO AJI M Manufacturing > Measures CBT Test room-Indonesia 20210326 1st (10:00)

2114 50613007 SAPUTRA AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2115 50613779 APRIADI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2116 50612811 AGUNG FERI RIZQI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2117 50613448 ZULFIKRI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2118 50611007 RIANA RULI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2119 50613303 MEILANI WIWIT F Manufacturing > Measures CBT Test room-Indonesia 20210326 1st (10:00)

2120 50610791 CAHYONO WIYOGO DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2121 50611505 HAKIM IWAN M Manufacturing > Wood joinery CBT Test room-Indonesia 20210326 1st (10:00)

2122 50611258 SUWARNO M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2123 50612849 TRIANTORO ADE YUNI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 1st (10:00)

2124 50613567 IRAWAN JEMI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210326 1st (10:00)

2125 50611230 RENALDI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2126 50611844 FADILLAH RIFKI NUR HUSEIN M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2127 50612294 ULUM AHMAD MUZAYINUL M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2128 50612525 SULISTIO BAMBANG M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2129 50611530 GADING DINA TIARA F Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2130 50610771 ABDUROHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2131 50611682 SATARI YULIANI F Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2132 50612732 ANANTO HENDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2133 50612971 MUCHSIN ACHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2134 50613557 SYAPUTRA ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2135 50611394 SRIGITA KRISDIAR F Manufacturing > Measures CBT Test room-Indonesia 20210326 3rd (14:00)

2136 50612348 HAKIM MUHAMMAD ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2137 50613278 SETIAWAN FAJAR M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2138 50613029 CAHYONO SIGIT M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2139 50613484 YANTO HENDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2140 50612727 SAMSUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2141 50613475 MUFID BAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2142 50611943 ROMADHON MUHAMMAD TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2143 50611055 IKBAL MOCHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2144 50611518 SAPUTRA SATRIO DIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2145 50611421 ALFIAN RIZKI NUR M Manufacturing > Wood joinery CBT Test room-Indonesia 20210326 3rd (14:00)

2146 50613836 BACHTIAR M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2147 50612456 RIJAL KHOIRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2148 50614208 WIJAYA HENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2149 50614019 KHOIRUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2150 50612899 AROIHAN IRFANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2151 50612061 FERNANDO FRENKY M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2152 50611647 SYAERUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2153 50613400 ABIDIN SAIUN M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2154 50611027 GALIH PANJI MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2155 50611207 ROFIANTI F Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2156 50613575 NUGROHO JATMIKO ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2157 50611393 SAHARA RANA DILLA F Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2158 50611713 SUPRIADI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2159 50610806 RISKI DEA F Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2160 50612139 RULI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 3rd (14:00)

2161 50614175 WIRANTO NANDAR ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2162 50611344 MARIO TATA M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2163 50611638 BASIT ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2164 50610976 OPAN TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2165 50611177 PUJAYANTI F Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2166 50613691 SATRIYO AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2167 50611976 SUJANA DEDE M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2168 50613116 WIYONO SRI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2169 50613750 PRASETYA NANDA OPPIE M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2170 50613880 SUGIANTO BAMBANG EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2171 50613539 WAHYU MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2172 50612916 IRAWAN BAGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2173 50613781 PRAMUDJA NANDA GILANG M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2174 50612628 WIDODO ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2175 50612249 RAMADHAN SYAHRUL M Manufacturing > Wood joinery CBT Test room-Indonesia 20210326 4th (15:30)

2176 50610891 GUNAWAN MOH RONI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2177 50611964 RENALDO ANGGA ARIEF M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2178 50613709 AYUNENGSIH FITRI F Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2179 50612653 ANAM FARIS SYIFAUL M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2180 50613383 UTAMI RATIH TRI F Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2181 50613593 YOLANDA DAVIT M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2182 50613800 ARNANDO WELY FARYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2183 50611038 MAULINKA AYUNDA F Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2184 50611385 FATAHILAH PUTRI FEBRILIA F Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2185 50612532 ANDRIANSYAH RIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2186 50611939 SAADAH MARFUATUS F Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2187 50611584 AFIDAH KUNI ROKHWATAL F Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2188 50612472 ZAELANI ABDUL FARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2189 50610697 KHOIRONI AHMAD BAGAS M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2190 50611183 WARDIMAS BAYU M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2191 50611284 BAEHAQI MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2192 50613708 SULTONI A M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2193 50612604 ABDULAH M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2194 50612931 RAMADANI DENI M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2195 50613989 WAHYUDIN WISNU M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2196 50611927 KHUTOTIH AQMAL AL M Manufacturing > Assemble CBT Test room-Indonesia 20210326 4th (15:30)

2197 50611112 WULAN SRI F Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2198 50610878 MAULANA RISKI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2199 50610906 ALAMSYAH FAHMI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2200 50611225 SOPANDI ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2201 50613096 TARMUDIN IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2202 50613629 ANDRIA WAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2203 50614130 SAPUTRA ISRONI WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2204 50612998 AMARULLOH MOH AGUS FAIZAL M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2205 50613533 ANDRIAN RIRIN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2206 50613820 PRATIWI UCI NADIA F Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2207 50613072 AZIZ LATIF M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2208 50612037 RIZQI MOHAMMAD FAISAL M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2209 50611157 MUHTAR ARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2210 50611525 JUMIYATI IGUS F Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2211 50612108 SAPUTRA REGI ADITIA M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2212 50612101 PAMUNGKAS TRIYADI BAYU M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2213 50612952 WIDIYANTO ERWIN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2214 50611127 YUFAZRI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2215 50614246 SUTIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2216 50614126 SIREGAR JOEL STAR ESTRADA M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2217 50613636 PENGALASAN AHMAD JOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2218 50612563 GHOZALI MUHAMAD RIYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2219 50611311 FIRDAUS NUR M M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2220 50614276 RAMADHAN FAIZ M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2221 50611544 KARIM IBNU FATAH M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2222 50612776 ASMARA SABILLA LANANG M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2223 50613413 IRAWAN M FIKIH M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2224 50613392 SHOLIHUN MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2225 50613640 KOMARILA M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2226 50612799 RIYADI SUGENG M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2227 50613912 SUTRISNO AHMAD M Manufacturing > Measures CBT Test room-Indonesia 20210329 1st (10:00)

2228 50612896 BASYA FAHMI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2229 50613730 HAFDZONI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2230 50611219 MUSTOFA ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2231 50612355 DARSAN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2232 50611206 FASILIDANI GAGAS M Manufacturing > Assemble CBT Test room-Indonesia 20210329 1st (10:00)

2233 50611946 MUSTAKIM RIZKI ISLAM M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2234 50612323 YUSWANTO REZA M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2235 50612411 WAZAUJI BAINAL MARI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)
ADIL MUHAMMAD RIDHO ASY
2236 50613550 M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)
SYAIFUL
2237 50612663 MBAROG AHMAD KHUSNI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2238 50610795 SUSANTO TEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2239 50614082 ADITIA CANDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2240 50611805 IHZA YUSRIL M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2241 50611136 MASITOH IMAS F Manufacturing > Wood joinery CBT Test room-Indonesia 20210329 2nd (11:30)

2242 50610730 SUHERMAN EDI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2243 50611108 SETIAWAN WAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2244 50612370 ANDI MUKHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2245 50610946 SUMARNA NANA M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2246 50614326 ASA IMAS WAHID M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2247 50611821 RAMADHAN GILANG M Manufacturing > Wood joinery CBT Test room-Indonesia 20210329 2nd (11:30)

2248 50614114 GUFRON AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2249 50613524 MIFTAHUDIN M RIZAL M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2250 50612749 LASTIKA MELISA F Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2251 50611744 HALOHO RAPIKA FT F Manufacturing > Measures CBT Test room-Indonesia 20210329 2nd (11:30)

2252 50611014 RUDIANSAH AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2253 50612280 MARTIN LEO M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2254 50612541 APRIANSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2255 50613138 SUPRIYONO M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2256 50611994 FEBRIANA ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2257 50613472 KARIMATIKA HANIFAH MYASTUTI F Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2258 50614309 KASWARA RANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2259 50611703 MAULENDI IKBAL MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2260 50613878 SEPTIANI PATRICIA PUTRI F Manufacturing > Measures CBT Test room-Indonesia 20210329 2nd (11:30)

2261 50612938 MUBARROK MUH FADLIL M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2262 50610877 WIDIYAH LULU F Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2263 50612832 MAULANA MUHAMMAD AUDIA M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2264 50612560 SAPUTRA LUCKY PRADANA M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2265 50613975 ROZAK MIFTAHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2266 50614065 BARINGBING JOSUA AFRIZAL M M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2267 50611063 RUDIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210329 2nd (11:30)

2268 50611711 KURNIAWAN ARIF M Manufacturing > Wood joinery CBT Test room-Indonesia 20210329 2nd (11:30)

2269 50613452 SUMARI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2270 50612120 PRASETYO FERI FRANSISKO M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2271 50611050 FAUZI IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2272 50613597 ROMADHAN PHIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2273 50612313 DASRUN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2274 50612959 ANWAR ACHMAD KHAERUL M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2275 50612950 PRASTYO DIDIK IWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2276 50614117 RIDWAN IKBAL MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2277 50612090 FARISKI M ANGGI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2278 50612775 KADAFI MUAMAR M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2279 50611533 NURSIAM BAYU M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2280 50613184 HARTONO RUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2281 50612945 SUPARDI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2282 50610842 HARYANTO SANDY M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2283 50611803 ARIFIN SAMSUL M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2284 50611115 SULISTIANI INES INDRI F Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2285 50612607 WIDAGDHO PRASTIA WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2286 50611651 TARIKA M Manufacturing > Measures CBT Test room-Indonesia 20210329 3rd (14:00)

2287 50611790 SAPUTRA DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2288 50613280 PRASETYO BEKTI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2289 50613742 IRAWAN DADANG M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2290 50613843 PANGESTU ASWAN ADY M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2291 50611155 SYARIPUDIN ASEP AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2292 50613057 SAWONO M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2293 50613289 WIDODO FADIL HANANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2294 50612692 S DENI ALWAWI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2295 50610897 KANAPI AAN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2296 50611080 NIDALLUDDIN IBNU M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2297 50612829 UMAM RIZAK M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2298 50611975 WAKIYO M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2299 50612093 DARWOTO M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2300 50613052 WAHAB ROFINGUL M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2301 50613159 MUDHOFAR SABIQ M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2302 50612434 IRVANA M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2303 50612533 WINOTO ARYO M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2304 50610707 SUJATI RESTU AMRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210329 3rd (14:00)

2305 50613100 HAPIPI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2306 50611789 PUJIARTO DWI TEGUH M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2307 50612151 PANGESTU GURUH M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2308 50611509 MAWATI YUHYI F Manufacturing > Measures CBT Test room-Indonesia 20210329 4th (15:30)

2309 50612542 BIMANTORO ENGGAL SYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2310 50614141 SURGONO FATTAH M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2311 50611575 ALFARIZI AHMAD ALFAZAR M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2312 50612232 ANDHIKA AAN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2313 50610868 APRIYANTO ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2314 50613271 ALVIANITAMI F Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2315 50611563 YAYA FAHAD M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2316 50612368 AMIRUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2317 50611506 SURANTO IKWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2318 50613782 ALFIYAH SITI F Manufacturing > Wood joinery CBT Test room-Indonesia 20210329 4th (15:30)

2319 50613131 WIDAYAT M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)
S WISHNU PANDJI DARA
2320 50613727 M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)
DJATOEN
2321 50613671 MAHFUZI HERI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2322 50613577 MUSA ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2323 50614356 SUBEKHAN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2324 50612390 IRAWAN HERI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2325 50613044 TRIYATNA SUGENG BAMBANG M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2326 50610755 KUSNADI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2327 50612689 FERNANDO RIKO M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2328 50613477 RIZQI DIMAS AINUL M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2329 50612135 SURYADI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2330 50611103 ANSHARI TRIDES M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2331 50610944 SURONO M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2332 50613290 NURHAMID TEGUH M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2333 50612176 MUSTOFA FATKHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2334 50613924 PUTRA FERDIAN DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2335 50611918 NOFIYANTO DEDI M Manufacturing > Measures CBT Test room-Indonesia 20210329 4th (15:30)

2336 50611511 NURJAMAN RAMA M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2337 50612418 VERDIANTORO OKSAN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2338 50612141 IKHBALUDDIN MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2339 50613352 SUGIYANTO TRIO KURNIA M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2340 50613006 AMARULLOH SAMSUN M Manufacturing > Assemble CBT Test room-Indonesia 20210329 4th (15:30)

2341 50612007 MUNIR KHOIRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2342 50613326 JULIANTO DADANG M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2343 50611369 RATNASARI SELI F Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2344 50610880 RIDO ARIZ FAISAL M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2345 50612762 PRAYITNO ANTON M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2346 50614289 IBRAHIM DIMAS M Manufacturing > Wood joinery CBT Test room-Indonesia 20210330 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2347 50611133 PRATAMA SATRIA YOGA M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2348 50613494 SUNARTO HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2349 50614359 MASDIKUN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2350 50611095 NURHENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2351 50610871 HARDIYANTO DODI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2352 50612657 DANISWARA RAMA GURNITO M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2353 50612773 JAYADI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2354 50612610 SARWOTO M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2355 50613531 IRFAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2356 50611548 ILYAS IBNU M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2357 50611083 BACHTIAR MOHAMMAD ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2358 50611165 BASBARA AKBAR M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2359 50613849 KURNIAWAN ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2360 50614365 AMRULLOH M M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2361 50611469 QUROHMAN TAOFIK M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2362 50614209 MARUF AMIRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2363 50610887 SAPUTRA BOBBY ROYKHAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2364 50610686 ARIFIN BUSRI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2365 50610784 WARNITA M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2366 50613377 GUSMANSYAH ANDRE M Manufacturing > Measures CBT Test room-Indonesia 20210330 1st (10:00)

2367 50610763 GUNAWAN WAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2368 50612997 FEBRURI TEDY M Manufacturing > Wood joinery CBT Test room-Indonesia 20210330 1st (10:00)

2369 50613565 VAWZI DIMAS BEKTI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2370 50611339 ALEXANDRO ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2371 50611882 SUROJI HERMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2372 50613320 ARBIANSYAH BHAKTI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2373 50611308 ISLAMIYAH MISNATUN F Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2374 50613775 PRASETYO DWI TEGO M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2375 50611590 HASANUDIN MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2376 50613012 RIFAI MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210330 1st (10:00)

2377 50612435 SETIAWAN AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2378 50610968 GUNAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2379 50610977 SALAMAH ZAHRA PUTRI F Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2380 50613599 APRIANTO TONI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2381 50611583 MUARIF FARIZ M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2382 50611309 AJIJ UJANG LATIP M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2383 50612771 OKTIRIANI ISNI F Manufacturing > Measures CBT Test room-Indonesia 20210330 2nd (11:30)

2384 50610733 WAHYUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)
MALAU VEBRINA DORGIS
2385 50612132 F Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)
MARGARETH
MUTMAINAH MOHAMAD
2386 50613001 M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)
ABDULLOH
2387 50612285 SUSANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2388 50612450 PRIYATNO HENDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2389 50611667 RIFAI AMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2390 50611172 SALAM RUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2391 50611569 IMAMUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2392 50612937 MULYO AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2393 50613275 SUHERMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2394 50612644 IKSAN MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2395 50612008 MUSTAAL M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2396 50612226 KUNARSO M Manufacturing > Wood joinery CBT Test room-Indonesia 20210330 2nd (11:30)

2397 50611540 ASHARI SEPRIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2398 50613964 KOMARIAH KOKOM F Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2399 50613360 ZULFIKAR ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2400 50612288 PUTRA WISNU ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2401 50613870 AFIQ MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2402 50611896 SAPUTRA FARHAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2403 50613384 ROFIK M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2404 50614331 IRAWAN IMAM SETIO M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2405 50610689 NURJANAH F Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2406 50611185 SETIADI AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2407 50613822 LESTARI DEWI F Manufacturing > Wood joinery CBT Test room-Indonesia 20210330 2nd (11:30)

2408 50611866 WAHYUNI F Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2409 50612664 NADIRIN AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2410 50610844 JUNIYANTI LINDA F Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2411 50614321 YOLANDA CLARISSA NIKE F Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2412 50613620 HIDAYATULLAH M Manufacturing > Assemble CBT Test room-Indonesia 20210330 2nd (11:30)

2413 50612729 JANAH MAULANI FITRIYA F Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2414 50613705 MUSTOFA ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2415 50614039 INDI ACHMAD DAULATUL M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2416 50611273 SUPRIYADI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2417 50613700 HENDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2418 50610883 KHUMAIROH F Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2419 50613396 NURFADHILAH DIELA F Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2420 50610732 TARYONO M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2421 50611582 ABDULLAH SOHIBIN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2422 50613595 ZAUS RAGAM ANDIKA M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2423 50612889 PRAYITNO EKO HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2424 50611796 SAYEKTI MARIANA BAGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2425 50613659 FITRIYANAH DEFI F Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2426 50613645 RIYANTO FELIK AZIS M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2427 50613933 ACHYAR JALALUDDIN M Manufacturing > Measures CBT Test room-Indonesia 20210330 3rd (14:00)

2428 50612316 RIZAL RIFKI NURHAM M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2429 50612860 SUBEHI FAJAR M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2430 50610766 TAJUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2431 50611074 JAMALUDIN RIZAL M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2432 50612161 FATHUROHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2433 50613404 PUTRI TIARA ANISA F Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2434 50614388 ALFIANTO FIKRI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2435 50614072 SETIAWAN GALIH M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2436 50613305 KRISNANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2437 50613626 SETIAWAN RIYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2438 50611437 RUDIYANTO MUHAMAD M Manufacturing > Measures CBT Test room-Indonesia 20210330 3rd (14:00)

2439 50613617 NURHUDA MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2440 50614191 WIGUNA DANDI CAKRA M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2441 50611623 WANILA M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2442 50611838 FERIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2443 50610909 MARZUKI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2444 50612706 LUDIN FAISAL M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2445 50610882 RIYANTO SIGIT M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2446 50613168 PANGESTU AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2447 50611247 FIRMANSYAH AMRI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2448 50613697 AFIANTO DONI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 3rd (14:00)

2449 50613815 BIMO AGIL ARIE M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2450 50613340 ANSORI MOHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2451 50610824 AMIN MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2452 50611084 FATKHURROKHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2453 50610734 SUYONO M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2454 50614346 QINTARA MUHAMMAD ANDRE M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2455 50611704 SAEPULOH DAHLAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2456 50612174 SUWARNO UJANG DANU M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2457 50613911 ARNANTA IKHSAN FAHNI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2458 50612555 ARDIYANTO EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2459 50612074 SAPUTRA ROZI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2460 50612482 PRASETIO EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2461 50613976 TRIONO M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2462 50613489 MASTORI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2463 50613375 DEWI SELVIA YANTI F Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2464 50614193 RIFAI DANU ACHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2465 50613759 S AJENG ALINDA ARUM F Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2466 50610952 RUKMANA TISNA M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2467 50611044 AGRIANA RENDY EDVAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2468 50614021 SANJAYA DEBY DAFID M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2469 50612724 SUGIYANTO YUSUF M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2470 50610936 RIYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2471 50614285 WAHAB M Manufacturing > Wood joinery CBT Test room-Indonesia 20210330 4th (15:30)

2472 50613596 SUSANTI MIA F Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2473 50610794 NURHAYATI MELLY F Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2474 50613785 PRASTIAWAN PIGIF M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2475 50613677 RAHAYU SETIANA F Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2476 50614174 IRAWAN HATTA TONI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2477 50613226 PUTRI BINTANG NURSYASI F Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2478 50613398 PATTIHAWEAN STEFANUS M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2479 50611519 RISTAMANINGSIH VINA F Manufacturing > Measures CBT Test room-Indonesia 20210330 4th (15:30)

2480 50612649 SARIPUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2481 50613734 SAPUTRA MARWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2482 50612325 RAJUKI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2483 50611640 SOPANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2484 50611963 ATMAJI PRIYA M Manufacturing > Assemble CBT Test room-Indonesia 20210330 4th (15:30)

2485 50611956 APRIYANTO BENI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2486 50612994 MUALIMIN SAPUTRA BIMBING M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2487 50611214 MALIK IKHSAN ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2488 50612946 AMIRUDIN EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2489 50611736 SUTARDI TEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2490 50613490 BENI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2491 50613270 HARYANTO TOTO M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2492 50611826 HAKIM LUKMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2493 50613393 PALALI GUNAWAN WIJAYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2494 50612183 SUTIONO M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2495 50611337 WINANTI WIWIN F Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2496 50610854 TAHRUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2497 50611989 SENTAJI DIMAS M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2498 50611134 NGADIMUN M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2499 50611248 MARDIANSYAH NURADJI RAFLI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2500 50613630 GUMELAR M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2501 50613308 KHUSYAIRI AKHMAD IBNU RIZAL M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2502 50613438 PINTONO BAYU AGUNG JOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2503 50611032 TIARA ANISYAH TRI F Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2504 50614226 ARIAWAN NURIA M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2505 50612978 FAJAR IQBAL M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2506 50613034 KHUMERI SYAHRIL M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2507 50610799 ADHITRIYO ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2508 50611054 HIDAYATI NUR F Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2509 50611637 PN ABDUL PATAH M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2510 50611577 SUHENDRO M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2511 50611626 DIMYATI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2512 50612148 ARIFIN YOGA DWIYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2513 50614210 SUSANTO ANJAR M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2514 50611537 YUSUP MAULANA M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2515 50613520 SAPUTRA ADI YULIAN M Manufacturing > Wood joinery CBT Test room-Indonesia 20210331 1st (10:00)

2516 50613710 ARIFUDIN AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)
MADINAH MUHAMMAD BAGUS
2517 50611474 M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)
MUSTOFA
2518 50614401 SOLEH M TOSIM M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2519 50612015 YULIANI CLAUDIA F Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2520 50613109 TRIJAYA ASEPTI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 1st (10:00)

2521 50612910 HIDAYATULLOH MUHAMAD ALDI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2522 50612260 SULAEMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2523 50612466 RIDHO MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2524 50614180 MAULINA RIZKI F Manufacturing > Wood joinery CBT Test room-Indonesia 20210331 2nd (11:30)

2525 50614189 HENDRAWAN BENI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2526 50611648 MAOLANA ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2527 50613941 GULO NIKODEMUS NIKODEMO M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2528 50614095 ANDIKA RICKY M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2529 50613246 ARKAN ZHAFRAN M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2530 50613917 LITARIA F Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2531 50614006 FAJAR WAHYU RISKI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2532 50612688 ALVIAN YOGI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2533 50613459 HERIYANTODI JONRI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2534 50614263 KUSMANTO ARY M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2535 50612901 RATYONO M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2536 50612917 FEBRIANTO ANDIKA M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)
ULUM M QORI MARFUU
2537 50613119 M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)
DAROJATUL
2538 50611383 SARI DIAN MUSTIKA F Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2539 50610775 SAPUTRA TAUFIK M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2540 50612479 IZAZI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2541 50611061 MAULANA RICO M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2542 50611791 ALFANDY PEPY M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2543 50612980 WAHYUDI DIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2544 50613353 FATONI IKHSAN M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2545 50612059 AZIZ FAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2546 50612584 APRIZON M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2547 50611145 MAULANA RIZQO M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2548 50613681 SANJAYA MUHAMMAD RIDHO M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2549 50612140 PRATAMA FANI OKTAFIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2550 50613124 HASIM EKA TOLYS M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2551 50613795 HUDORI A M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2552 50613993 SINTHIA F Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2553 50613517 WIDIAN LEONARDY ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2554 50612335 SUTRISNO CECEP M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2555 50611771 FADILAH AKHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2556 50613356 ILLAHI ROFI ALI NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210331 2nd (11:30)

2557 50611971 ANDICHO LAURENSIUS AREL M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2558 50610917 KHOSIIN M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2559 50611493 NURIDWAN MUCHAMAD RAFLI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2560 50614274 SOLIHIN RIADI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2561 50613164 ZEGA FAJAR SETYA TOTONAFO M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2562 50612992 MULYANI INDAH F Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2563 50613470 HARAHAP PERI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2564 50611199 BUDIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2565 50613033 SUSILAWATI F Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2566 50613125 ROMADONI SAEFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2567 50614196 PAMUNGKAS RIKI AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2568 50612206 FERNANDA BAYU M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2569 50613053 TARMUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2570 50610973 JASA HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2571 50611035 RAHMAN TAUFIX M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2572 50614171 TIA ADE NOVA TRILIS F Manufacturing > Wood joinery CBT Test room-Indonesia 20210331 3rd (14:00)

2573 50613395 SEPTIADI RIZKY M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2574 50612914 OKTAVIA IFAN HAFIZ M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2575 50612200 IRFAN ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2576 50612233 KHAERUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2577 50611282 SUHESTI RIANA F Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2578 50610934 FIRMANSYAH FIKIH M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2579 50611259 PAHLEVI REZA M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2580 50612339 SETIAWAN YOGI TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2581 50613966 SAPUTRA RAMZI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2582 50611881 PUTRA GHALI HERIAN GEMMA M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2583 50613195 MUNA ARINAL KHUSNA F Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2584 50614333 HIDAYAT TAUFIQ M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2585 50614115 SALIM AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2586 50611902 HALAWA JONI BERKAT M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2587 50614007 MARUF KHABIB AL M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2588 50612001 MUSTOFA AHMAT ZAINUL M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2589 50611045 SINAGA TOMMI JULI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2590 50612925 FITRI ANISA F Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2591 50612223 EGAWATI ARI F Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2592 50611782 SOBIRIN IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210331 3rd (14:00)

2593 50610719 WAHYUDI DIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2594 50613074 INDRIANTO IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2595 50611077 DEWI SANTI PUSPITA F Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2596 50614374 NASRUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2597 50613098 SISWONDO M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2598 50613266 EMALIA F Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2599 50612655 AZIZ MOHAMMAD ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2600 50614177 SIHOMBING ERNA ARITA F Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2601 50613919 MELANIA F Manufacturing > Measures CBT Test room-Indonesia 20210331 4th (15:30)

2602 50612346 AERLANA PANGKY M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2603 50613830 ZULKANI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2604 50611695 WULANDARI DEWI F Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2605 50612777 RIZA ROHUL SAUQI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2606 50614386 WAHYUDI TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2607 50611944 SUBADAR MAKRUF M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2608 50611671 BISRI HASAN M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2609 50613768 ISKANDAR M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2610 50612259 SANTOSO BUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2611 50611040 GUSTIA IKHSAN M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2612 50611535 OKTAVIANI VINA NUR F Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2613 50613711 IRAWAN AHMAD DONI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2614 50612869 LESTARI MUJI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2615 50613090 JAMRONI MOH M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)
DARMAWAN MUHAMAD
2616 50610985 M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)
DASHAFRIAL FAUZI
2617 50611503 SUPRAPTO WANOROH M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2618 50613361 KENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2619 50612309 BAHRI SAEFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2620 50612839 DIYANTO HENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2621 50610955 NURRACHMAN RAMDHAN M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2622 50614173 SAPUTRA SEPTIAN DICKY M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2623 50613293 PRASETYO AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2624 50613618 SUPANGAT M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2625 50611152 ARSANNIYANSAH M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2626 50613212 ATMAJA DWI SURYA M Manufacturing > Measures CBT Test room-Indonesia 20210331 4th (15:30)

2627 50612517 PAHRONI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2628 50614170 ZULIO FIONALDO JIENI M Manufacturing > Assemble CBT Test room-Indonesia 20210331 4th (15:30)

2629 50611657 ANDHIKA M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2630 50613655 NUGROHO HERI NOVIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2631 50611317 ISWANTO IIS M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2632 50612367 PRIBADI HESA KURNIA M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2633 50612420 ALVIAN JONI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2634 50611328 HARYO RATNO M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2635 50614287 CHANDRA TOMY M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2636 50612919 SYAFAAT FISGIA IBNU M Manufacturing > Wood joinery CBT Test room-Indonesia 20210401 1st (10:00)

2637 50613332 SAPUTRA WAHYU GUSTI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2638 50610834 APRIANTO EGI ARIP M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2639 50613321 FATHUROKHMAN MUKHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2640 50612701 WARTINI F Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2641 50611734 FIRDAUS MUKHAMAD SLAMET M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2642 50611277 ALAMSYAH SENO AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2643 50613076 MAJID MOHAMAD RIJAL M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2644 50613909 ISKHAK MUHAMMAD YANUAR M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2645 50612446 DAOSAT MUHAMMAD ARSYIT M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2646 50612969 NOPITASARI CUCUN F Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2647 50614148 GONI M IQBAL AKIFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2648 50614185 GAPUR MUHAMMAD ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2649 50614097 KRUSTIADI ERWIN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2650 50613983 SAGIMAN IYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2651 50611853 SETIAWAN DENIS M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2652 50613171 KHOBARUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2653 50612147 SUBANDRIYO AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2654 50611652 MUBAROK MOH ADE MUKHLAS M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2655 50612949 RISKI ALIF VAN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2656 50611028 SAKINA NUR ALMALIA F Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2657 50613897 YANTI IDAH F Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2658 50613351 SYARIFUDIN M Manufacturing > Wood joinery CBT Test room-Indonesia 20210401 1st (10:00)

2659 50610935 MANIK MALA SUSIANTI F Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2660 50611865 RACHMAT M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2661 50613443 SUTIKNO ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2662 50611071 SUKARTONO M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2663 50612292 ALFIYAN MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2664 50611977 HARDYANTI MERYSA F Manufacturing > Assemble CBT Test room-Indonesia 20210401 1st (10:00)

2665 50614372 HANDOYO MASFAKIH M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2666 50613808 MANGGALA RISKI BAYU M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2667 50613193 AMBYAH ALIP M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2668 50610714 ATUN UMI F Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2669 50610899 EFENDY NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2670 50611629 SYATHORI ABDULLAH M Manufacturing > Measures CBT Test room-Indonesia 20210401 2nd (11:30)

2671 50611564 MANSYUR QURO ABDILLAH M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2672 50613282 RAMADAN RIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2673 50613841 PUTRA RAJU MAULANA EKA M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2674 50613752 WARSITO USMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2675 50611484 NURSIDIK RIJAL M Manufacturing > Measures CBT Test room-Indonesia 20210401 2nd (11:30)

2676 50612363 PRAYITNO RESTU MUGI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2677 50612483 DAYANTI DINDA IRMA F Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2678 50612912 RACHMAN AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2679 50613372 SAPUTRA AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2680 50612894 MUARIF MALIK M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2681 50614358 DARYONO M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2682 50611595 WICAKSONO CHANDRA JANUAR M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2683 50611420 YANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2684 50612847 KHUMAENI ALAN ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2685 50612582 RAMADHANI DENNY M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2686 50612787 YUDI SACKBANI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2687 50611403 PERDIANA PENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2688 50614205 SEPTIANTO AZIZ M Manufacturing > Measures CBT Test room-Indonesia 20210401 2nd (11:30)

2689 50613380 FIRMANSYAH AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2690 50611216 ARIFIN JAENAL M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2691 50614105 SAPUTRA GUNTUR DIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2692 50613281 SYIHABUDDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2693 50613773 WIBOWO AGUNG PRI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2694 50612638 MURDIONO M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2695 50613594 SETIAWAN OKSAR HENDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)
SARI TRI NENGSIH EKA
2696 50613723 F Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)
PURNAMA
ABDUROCHMAN RIZAN
2697 50613949 M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)
MUHAMAD FIRDAUS
2698 50614298 MAULANA TAUFICK M Manufacturing > Wood joinery CBT Test room-Indonesia 20210401 2nd (11:30)

2699 50613804 ZAIDI MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2700 50611494 PRIYATNA FIRMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 2nd (11:30)

2701 50611295 ROAENI F Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2702 50611305 TARUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2703 50611252 MAFTUKIN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2704 50613236 FAUZAN AKHMAD HILMI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2705 50613391 PADLY MOHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2706 50612379 PERDANA DIMAS PUTRA M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2707 50612415 FITRIANI F Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2708 50613310 WATI DWI SETYA F Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2709 50611948 PRATAMA DIKY WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2710 50613083 TOLIB M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2711 50612756 PURNAMA JOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2712 50611464 NURPALAH A M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2713 50613497 MULIADI M Manufacturing > Measures CBT Test room-Indonesia 20210401 3rd (14:00)

2714 50611768 MULYANTO DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2715 50612149 SEKALI HARUN KARO M Manufacturing > Wood joinery CBT Test room-Indonesia 20210401 3rd (14:00)

2716 50612056 ALFIKRI ABDUL HOFUR M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2717 50613373 YULIANTO NANANG M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2718 50612661 RISWOYO TITO M Manufacturing > Wood joinery CBT Test room-Indonesia 20210401 3rd (14:00)

2719 50611429 LESTARI F Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2720 50610875 VURWANTI SISKA F Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2721 50611316 SULAEMAN ACEP M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2722 50613461 HUTAGALUNG JOHANES RYO M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2723 50612250 PRASETIA DIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2724 50612716 ZAENUN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2725 50613286 PURKONUILAH M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2726 50611432 ISMAIL GHOFAR M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2727 50612162 WIDIYANTORO SANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2728 50614373 TIRTA ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2729 50613792 VINNARAH VINDO M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2730 50614387 RAMADHAN MUTIARA M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2731 50612622 FIRMANSYAH LATIF M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2732 50613749 SHANDI ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2733 50612595 MAULANA HALFA M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2734 50612690 IRAWAN FERI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2735 50612126 HERIYANTO DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2736 50613852 ANDIRIUS JUPEN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 3rd (14:00)

2737 50610947 NULHAKIM LUKMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2738 50612537 WIDODO REGIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2739 50611890 SITEPU NERVIA MUTIARA BR F Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2740 50611612 PRAWOTO M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2741 50614012 YUSUF AJI NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2742 50612058 KURNIAWAN JEPRI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2743 50614153 PRIONO DWI RIYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2744 50612942 ANDRIYANTO RIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2745 50614005 SHOLEHUDIN M FARID M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2746 50614279 SUPRIYANTO TEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2747 50611447 GUNAWAN INDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2748 50612022 AR TARMIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2749 50612041 RIZKI DENI ADITYA M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2750 50610822 ANDRIYAN ENGKI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2751 50613647 BAYU I NYOMAN KRESNA M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2752 50612629 ABIDIN SAMSUL M Manufacturing > Wood joinery CBT Test room-Indonesia 20210401 4th (15:30)

2753 50612468 FIKRI ZAENUL M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2754 50614057 LISDIANTO RAFLI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2755 50613936 PANANRANG ANISA SAESARIA F Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2756 50611213 FAIZUN ANAS M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2757 50612155 WITANTI NINA IKA F Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2758 50614314 WIGUNA GIGIH PUTRA M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2759 50611070 SULIWA M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2760 50610904 RAMADHANI SANDY M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2761 50613519 NANTO IVAN ADHA M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2762 50613819 BASAR SYAMSUL M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2763 50613265 RUNATA M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2764 50610928 JAELANI ABDUL QODIR M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2765 50614122 MUSTOFA BISRI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2766 50613664 YUSUF WAHID M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2767 50612754 AZIZ M ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2768 50611399 SAPUTRA DODY M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2769 50611188 FAOJI LUTFI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2770 50610922 ROSYAMAHARANI SEPTIANI F Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2771 50610704 MUNANDAR ALIP M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2772 50612717 BUDIAWAN RONI M Manufacturing > Assemble CBT Test room-Indonesia 20210401 4th (15:30)

2773 50614056 SUPARMAN HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2774 50612546 MUNIR FATHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2775 50612981 BUDIMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2776 50613336 AZIZ ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2777 50611974 MASRIKAH F Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2778 50614355 HADI MUHAMMAD SOFYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2779 50613063 NURHIDAYAT M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2780 50611042 RABBANI IKFI ABDILLAH FATHU M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2781 50613196 ALFARIZI MUHAMMAD ANGGI M Manufacturing > Measures CBT Test room-Indonesia 20210405 1st (10:00)

2782 50614284 RIZKI RENALDI ALFA M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2783 50613725 IRAWAN YUDI HENDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2784 50614265 HERMAWAN GILANG ADITIA M Manufacturing > Measures CBT Test room-Indonesia 20210405 1st (10:00)

2785 50610873 YAHYA MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2786 50611117 SYAFII MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2787 50613264 KHOLIS NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2788 50611585 HAMZAH MOHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2789 50612963 REZALDI MOCH ELNO ARIO M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2790 50613197 HANAFIYAH DITYA MONA F Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2791 50612778 TRIYONO RIZKI ABDILAH M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2792 50612413 DALIUS ELRIZKY ROMADHON M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2793 50611859 PRASETYO EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2794 50613637 ABDI DZIKRIAL M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2795 50612789 IRAWAN ERI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2796 50613314 PRASETYO ELANG M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2797 50611877 MAULANA AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2798 50612886 HIDAYAH MUHAMMAD NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2799 50612977 PERTIWI INDAH F Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2800 50612784 FIKRI MUHAMMAD IKHSANUL M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2801 50613703 SITUMORANG MEDALINA F Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2802 50611716 HENDIANA ERWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2803 50613713 PRASETIA DEDY M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2804 50613345 MONIKASARI SELVI F Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2805 50612779 PURNOMO FAJAR DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2806 50613456 GONI ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2807 50613399 SUBIYAKTO M Manufacturing > Wood joinery CBT Test room-Indonesia 20210405 1st (10:00)

2808 50614216 APRILYASI ANISYAH F Manufacturing > Assemble CBT Test room-Indonesia 20210405 1st (10:00)

2809 50611968 RIYANTO DENNY RIZKY M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2810 50611082 EDI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2811 50613498 PRASETIYA TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2812 50610796 AKBAR MUHAMMAD MAULANA M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2813 50611678 RIWANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2814 50613685 HAMBALI ANTON M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2815 50613757 OKTARIANSYAH PRAWEDO DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2816 50614042 MASHURI IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2817 50614023 LESTARI JULIA F Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2818 50612875 MARIJAN ABDUL AZIZ M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2819 50612838 PRAMUKTI AWALUDIN DIMAS M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2820 50612354 PRATOMO HENDRI SETIAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2821 50611650 FAUZI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2822 50612835 SAYUTI DIMAS AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2823 50610978 HAMDANI ABDUL MUIS M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2824 50613426 WISNU M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2825 50613784 PRATAMA DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2826 50613341 KHAERUNISSA NADIA F Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2827 50613939 HULU PENGAMALAN IMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2828 50613442 ROANSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2829 50611492 MANSURI AHMAD M Manufacturing > Wood joinery CBT Test room-Indonesia 20210405 2nd (11:30)

2830 50613717 TRIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2831 50613318 WAHYUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2832 50613958 RUMINAH F Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2833 50612605 TASINUDIN IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2834 50612014 PUTRA ANDIKA M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2835 50613845 SARI NONI PURNAMA F Manufacturing > Wood joinery CBT Test room-Indonesia 20210405 2nd (11:30)

2836 50610975 NURHASANAH SITI SRI F Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)
WIRYOKUSUMO ANGGER
2837 50610967 M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)
PANDOWO
2838 50610731 OKTAVIANI DELA F Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2839 50613065 IRIYANTO ROFINDA M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2840 50612572 SUWANDI KIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2841 50614259 SILVIANITA AULA ALVA F Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2842 50610972 NARSADI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2843 50610754 SYADILI AGIS M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2844 50613227 FATCHURROHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 2nd (11:30)

2845 50613046 SAFALAS IQBAL RINDIKA M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2846 50611289 CAKRA M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2847 50611092 DZAKI FAIZ M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2848 50614382 SOIMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2849 50613173 FATKHURREZA AFRIZAL M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2850 50612796 WALUYO PUJI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2851 50611287 AMIN MOHAMMAD M Manufacturing > Measures CBT Test room-Indonesia 20210405 3rd (14:00)

2852 50612506 MUHARMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2853 50613515 SYAHPUTRA HAMDI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2854 50611125 HARDANI DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2855 50613190 GHONI DIKA AMAR M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2856 50612817 SIDIK FAISAL M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2857 50611924 VALENTINO RIO M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2858 50613970 REFALDI MUHAMAD ILHAM M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2859 50611431 SUNARYA ATEP M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2860 50612404 SURAHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2861 50612258 CAHYATI SHINTIA F Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2862 50610997 ZAELANI SYAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2863 50611435 CASNAWI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2864 50611895 WIRADATI NANI F Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2865 50613580 WAHYUDI TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2866 50611065 RAMDHAN DONY NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2867 50612887 PRASETYO BAYU PUTRA M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2868 50613089 WALIYADIN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2869 50613258 MUSTAKIM M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2870 50612267 SURURI FARID M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2871 50611520 LESTARI ENDAH F Manufacturing > Measures CBT Test room-Indonesia 20210405 3rd (14:00)

2872 50613018 SATRIATAMA DRIASMARA PAKSI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2873 50611686 AGUSTA ALDINO LEONARDI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210405 3rd (14:00)

2874 50613239 HIDAYAT FEBRI DIAN M Manufacturing > Measures CBT Test room-Indonesia 20210405 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2875 50613288 SIDIQ M M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2876 50612988 WARDANA ADITIYA PUTRA M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2877 50612100 PERTIWI YAYANG HANA F Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2878 50612478 ROHMAN DUL M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2879 50612175 SANTOSO TEGUH M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2880 50614145 FATIKHI IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210405 3rd (14:00)

2881 50611562 RIYANI F Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2882 50612394 ARIANTO RIFKI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)
SYAM RAHAYU NUR PERMATA
2883 50610710 F Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)
SARI
2884 50612714 TAKUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2885 50614300 PRIYATNO M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2886 50612224 PRANATA JONI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2887 50612615 RISTIYANTO M Manufacturing > Wood joinery CBT Test room-Indonesia 20210405 4th (15:30)

2888 50612613 HARIYANTO IJUN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2889 50614029 ALJAZULY M MUSTOFA M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2890 50611958 RAIHAN AHMAD WILDAN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2891 50611934 RIZKI FAHMI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2892 50611722 SUPYANA FAJAR M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2893 50611691 PATMAWATI INI F Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2894 50610695 DWIMAYANTI PINDI F Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2895 50612891 SAEHU CAHYA AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2896 50613561 TAUFIK MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2897 50612245 PUTRA PRIMA EGA M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2898 50611144 RIDWAN M Manufacturing > Wood joinery CBT Test room-Indonesia 20210405 4th (15:30)

2899 50613225 SUYUDI IMAM M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2900 50612987 ARIYADI MIFTAHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2901 50613117 TURSINO M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2902 50612083 SOFIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2903 50612870 PURWANTO HERI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2904 50611086 DARMAWAN RIZKI AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2905 50613707 ERDIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2906 50611656 SUDRAJAT M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2907 50613457 SABETHORA YUDHI M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2908 50610793 ROSANTI TUTI F Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2909 50611448 SUSANTI ANI F Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2910 50610926 PRADINA MAYOLALITA F Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2911 50613081 SOBIRIN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2912 50611191 ZULKARNAIN DIMAS IRVAN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2913 50613436 YULIANTI ENDA F Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2914 50610693 HARDIYANTO HERY M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2915 50611616 SUJANTO ANDREW KURNIAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210405 4th (15:30)

2916 50613111 FAIZAH WALIDATUN F Manufacturing > Measures CBT Test room-Indonesia 20210405 4th (15:30)

2917 50611226 WAHYONO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2918 50612471 HIDAYAT ANTON M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2919 50614349 PURNOMO SONI HENDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2920 50613408 WILDAN MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2921 50612477 ARSZAKH SAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2922 50612449 SUBEKTI SEFIAN AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2923 50611246 PRIYONO BUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2924 50612745 HASIM MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2925 50614280 DEWI KIRANA F Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2926 50612461 WARDANI JULIA IRDA F Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2927 50611923 MUBAROK ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2928 50614238 AYUNDA DWI ELOK FIKA F Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2929 50610869 KODILAH M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2930 50610737 APRIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2931 50614248 RUSJANA M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2932 50613953 WIJAYANTI F Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2933 50611205 HAMEDZIC HUSAIN SHALIH M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2934 50611753 SAPUTRA BAMBANG M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2935 50613491 MAIDIA ERA F Manufacturing > Measures CBT Test room-Indonesia 20210406 1st (10:00)

2936 50610938 WARYAMIN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2937 50613394 SETIANA ARIP M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2938 50612521 KRISTIAJI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2939 50611280 HIDAYAT CHAIRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2940 50613858 FAZRI MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2941 50613432 PANJAITAN BOWO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2942 50611227 RIZAL SYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2943 50611001 RUSMANA INDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2944 50614302 TOHIR SAMSUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2945 50611926 YANTO TRI HANAFI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2946 50610987 ZEIN RIZAL FAIZAL MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2947 50613651 SURANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2948 50612117 DAMANIK THERESIA MAHARANI F Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2949 50611815 PUTRA DAVID ARMANDA M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2950 50613257 ARDIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2951 50614159 KADARROSNO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2952 50612067 PREADO DARWIN HANDES M Manufacturing > Assemble CBT Test room-Indonesia 20210406 1st (10:00)

2953 50612158 STR NADA MULIADA M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2954 50613161 CARMIN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2955 50610954 VICKY M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2956 50612002 SETIYONO AGUS TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2957 50612220 AFRIAN FAIZAL M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2958 50611879 ALLFREEDO THISKY M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2959 50611089 RAMDONI RIZKY M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2960 50611475 RAIS ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2961 50613482 KAROSMA AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2962 50611314 YUNIANTO VIVIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2963 50612409 PAMUJI JOHAN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2964 50611234 NAIBAHO OMSEN WANTONI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2965 50611897 WIJAYA DANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2966 50612159 FAWZI AAN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2967 50611159 WIJAYA HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2968 50612205 FEBRIANSAH ARUL M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2969 50612840 WAKRUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2970 50612574 ARISKY DIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
2971 50612918 AGUSRIYANTO FANY M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2972 50613075 DERMAWAN MUHAMMAD AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2973 50612575 MUZAKI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2974 50614138 SIMBOLON SIMON ALFREDO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2975 50610742 RACHMATISYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2976 50612168 SUTANTO TIO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2977 50611150 FARID IRFAN M Manufacturing > Wood joinery CBT Test room-Indonesia 20210406 2nd (11:30)

2978 50612939 DAMAYANTI ATIKA GITA F Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2979 50611166 PRABOWO EGAR IKRO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2980 50613818 ANDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2981 50613032 ZAZULI MUHAMAD IRVAN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2982 50612491 SAEFUDIN ALIF M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2983 50613216 SUPRIAWAN HENDRY M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2984 50613132 YANI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2985 50613731 ALFANI M WILDAN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2986 50613254 SUPANGAT M Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2987 50612282 DIYANTI F Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2988 50613728 TIYA ALIB F Manufacturing > Assemble CBT Test room-Indonesia 20210406 2nd (11:30)

2989 50612197 RIZKY ALFYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

2990 50611367 KUSWANTO AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

2991 50613959 GULO REFORMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

2992 50613465 SAPUTRA ANDIKA ERWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

2993 50613274 PRATAMA HARULD FARGIZ M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

2994 50610850 MULYADI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

2995 50611272 KURNIAWAN SOFYAN ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

2996 50612768 RACHMAN SOFYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

2997 50614086 TAQI MUHAMMAD IBNU M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

2998 50614163 MURNI ANGGIA INDRIANI F Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

2999 50611123 WIKODONO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3000 50613754 AMIRUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3001 50613152 PANGESTU AJI M Manufacturing > Measures CBT Test room-Indonesia 20210406 3rd (14:00)
PRAMUJA AKHMAD SAFIK
3002 50613188 M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)
AGUNG
3003 50611012 KUSDAENIKA CEVI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3004 50611345 ANDRIYANTO RIKY M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3005 50614152 MASIHIN M Manufacturing > Wood joinery CBT Test room-Indonesia 20210406 3rd (14:00)

3006 50613611 KURNIAWAN RIZKI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3007 50612642 ASSEGAF IRHAS M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3008 50611451 SAEFIYADI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3009 50613496 NURYANI F Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3010 50611253 IKHSAN ZAINURI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3011 50610747 FARISI SALMAN AL M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3012 50611499 FAUZI VICKY M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3013 50611724 PRASETIA ANANTO SUGENG M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3014 50611745 PERNAMA INDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3015 50613414 NYOTO ANOM M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3016 50613832 SITEPU BIMA RIO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3017 50611034 ARMANSAH M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3018 50613369 HERYANTO OKI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
3019 50611189 GINANJAR PURBO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3020 50612821 EFENDI SONI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3021 50613706 PRABOWO SETO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3022 50611011 APANDI ALWI AKASAH M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3023 50613428 RIYANSYAH DWIKI EDO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3024 50614214 KURNIAWAN FAJAR M Manufacturing > Assemble CBT Test room-Indonesia 20210406 3rd (14:00)

3025 50611807 INDRASTO DANUR TANJI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3026 50612602 APRIYANTO JEPRI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3027 50612039 ISWANTO BUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3028 50611529 SUHENHEN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3029 50612038 PAMUJI DIAS DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3030 50612229 JUBAIDAH IIN F Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3031 50613300 FAHAT MUHAMMAD HASBI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3032 50611372 HABIBI ADE PUTRA M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3033 50614290 APRIZAL MOHAMAD WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3034 50613831 ARIALDI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3035 50611357 FATHURROKHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3036 50612065 BAWONO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3037 50613016 MAULANA IKBAL M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3038 50613758 SANDY MELANY F Manufacturing > Wood joinery CBT Test room-Indonesia 20210406 4th (15:30)

3039 50613678 SUPRIADI YUSUP M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3040 50614135 SIAHAAN MOSES M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3041 50611969 RIYANTO AGUS DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3042 50610816 FADHLI KHOIRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3043 50613973 GULO ANWAR M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3044 50611299 RIAWAN RIKY M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3045 50612827 PAMUNGKAS NOVAL IBNU M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3046 50611408 NADION M. M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3047 50611397 RUSDI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3048 50614048 MUNANDAR ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3049 50613492 ANDESTA ANGGA M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3050 50612440 PRAYOGI SEPTIAN TRI ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3051 50614131 MASRURI FUAD M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3052 50611198 PRADHANA YUDHA ADHI M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3053 50613169 TRIYONO YUDA M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3054 50611060 ANWAR JULIAN SAEFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3055 50613015 CHUDORY ACEF M Manufacturing > Measures CBT Test room-Indonesia 20210406 4th (15:30)

3056 50611552 KHAERIYAH F Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3057 50613641 MULYONO M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3058 50612054 AGUSTIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3059 50610801 AJI MAS ARI PURNAMA M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3060 50612453 SAMSUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210406 4th (15:30)

3061 50613821 GUPITO NATA M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3062 50611681 CAHYUDI YUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3063 50613256 PURWATI DUSI F Manufacturing > Measures CBT Test room-Indonesia 20210407 1st (10:00)

3064 50613220 SUTRIONO RUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3065 50612871 IRAWAN WILLY M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3066 50611288 MUAMAR M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
3067 50611817 SUKRON MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3068 50613354 GUNAWAN MEI SYAHRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3069 50612251 PRATAMA YOGA M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3070 50613376 ROMIDU M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3071 50612277 ZAENURI FILZA MIFTAH M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3072 50612228 FATAKHUSSALAM WILDAN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3073 50613224 NOVIAN ENGGAR DANU HARDI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3074 50613627 APRIZON M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3075 50611088 SUTO M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3076 50614347 LAKSONO TRI MULYO AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3077 50612873 SUSILO ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3078 50611888 SIAGIAN NOVITA LESTARI F Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3079 50613715 SUPRIADI AFRIZAL DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3080 50614264 RAHMAN RIZKI M Manufacturing > Measures CBT Test room-Indonesia 20210407 1st (10:00)

3081 50613851 WIBISANA FAUZAN ALVI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3082 50611113 NURYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3083 50612153 LESMANA BAYU M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3084 50612927 SUSWANTORO AKHMAD DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3085 50611907 PRASTIYO YOGA M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3086 50613875 SUSANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3087 50613747 ANGGA RIO M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3088 50611594 SAPUTRA TOMI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)
FEBRIANSYAH MUHAMMAD
3089 50611022 M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)
ROIHAN
3090 50614252 OCTAVIANI ANEDI ANNASHR F Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3091 50612269 ALIMUDIN MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3092 50610853 FURIDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3093 50611483 SYAHRI ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3094 50613586 SAFITRI LINTANG MELIYA F Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3095 50614037 RAMADHAN FAJRI NOOR M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3096 50613762 WAHIDIN RIDHO M Manufacturing > Assemble CBT Test room-Indonesia 20210407 1st (10:00)

3097 50613605 DARWIN AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3098 50611702 MUBAROK ALES AGUM M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3099 50613493 PRADIKA MUHAMMAD YUDHA M Manufacturing > Measures CBT Test room-Indonesia 20210407 2nd (11:30)

3100 50611453 FEBRIYANTI DEA DINDA NUR F Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3101 50611717 MUKRODIN M M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3102 50612903 ANDRYANSYAH ARGA M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3103 50612340 SOBIRIN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3104 50614040 NUDIN MUHAMMAD EKHSAN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3105 50611820 ROFAT M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3106 50610706 SUPRIYANTO RIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3107 50613412 RANI F Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3108 50612858 ISWOYO TEGUH M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3109 50612263 ANGGRAINI NADIA F Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3110 50614305 HIDAYAT NURUL M Manufacturing > Wood joinery CBT Test room-Indonesia 20210407 2nd (11:30)

3111 50612837 MUARIF MOH M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3112 50611632 MARGARETA H CECEP HIRMAS M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3113 50612597 ROHMANI BENI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3114 50612046 RIYANTO SURYA FAJAR M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
3115 50611400 ANDREAN MUHAMMAD ANGGA M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3116 50612526 EFIYADI MAHYUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3117 50612185 PAMUNGKAS SUKADI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3118 50612184 PURNOMO HERI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3119 50612940 ANDRIANTO SOFYAN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3120 50612284 TARJONO M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3121 50611481 ALFAJRI MAULIDAN TESAR M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3122 50613662 DAYAN FHONNY SATRIA M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3123 50612606 SANTOSA EDI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3124 50613910 RAHARJA AKSARA M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3125 50610692 JAYA PUTRA M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3126 50613801 KUSUMA TOMI HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3127 50612238 NUGROHO DWI ARYA M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3128 50614348 FIRDAUS M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3129 50614044 AJI ALPINDO PRASTIO M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3130 50612627 APIV KUN SALEH M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3131 50610867 FATKHUROKMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3132 50612558 RIZKI MOHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210407 2nd (11:30)

3133 50612761 FATUROKHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3134 50612567 SAPUTRA ROE M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3135 50613739 PARDEDE LUIS M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3136 50613097 FATHONI KHAIRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3137 50610804 ALDI MOHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3138 50611602 ROHMAN DENI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3139 50612691 SUGIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3140 50612253 FADILLAH FAISAL M Manufacturing > Measures CBT Test room-Indonesia 20210407 3rd (14:00)

3141 50611187 PANGESTU SATRIA AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3142 50610941 SAHID UMAR IBNU M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3143 50613502 REGO NANO OKTA DIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3144 50612345 MUNDIRIN AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3145 50614325 SUWONDO DEDY M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3146 50611425 BUSLI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3147 50612893 BAIHAQI SYAIFULLOH AL M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3148 50610722 MAALIF ROBBANI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3149 50612293 WIBOWO M Manufacturing > Wood joinery CBT Test room-Indonesia 20210407 3rd (14:00)

3150 50614235 MAOLANA OSKAR M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3151 50613160 ROPII M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3152 50611208 OCAISARIA VIVI AGUSTIN F Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3153 50613780 KHOIRI FATHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3154 50612957 POHAN MOHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3155 50614182 RINOTO SIGIT M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3156 50611573 ARIYANTO SANDY M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3157 50610943 TABIDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3158 50613963 UJUNG DELAJA SELIMA F Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3159 50612408 RAHMAN AGUNG YHULIONO M Manufacturing > Measures CBT Test room-Indonesia 20210407 3rd (14:00)

3160 50613857 HARIANTO RENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3161 50612520 AZIMAN PAUZAN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3162 50612676 TAYUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
3163 50614328 PRASETYO AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3164 50611306 TAUFAN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3165 50610957 HIDAYAT ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)
PRABANDARI RR DEBBY
3166 50612350 F Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)
WINDIANINGTYAS
3167 50611139 KAFFAH SILMI F Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3168 50614267 PANCA TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 3rd (14:00)

3169 50612268 APRILIANA FHADILLA F Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3170 50613679 TORI DWI ROHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3171 50610893 LUWIH JAKA M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3172 50613139 SAMIRIN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3173 50613871 SURYADI FRENGKI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3174 50614244 SEPTIAN FADILLAH M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3175 50613585 FI AANG KURAI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3176 50611687 RIPANA YUAN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3177 50612733 HASYIM WAHID M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3178 50611048 AHMADI AGUNG MAULANA M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3179 50614294 PURWANTO EDI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3180 50614323 SANTANA M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3181 50612428 SANTOSO YUGA RIGI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3182 50614315 RAHAYUNINGSIH F Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3183 50613267 PURNAWAN ANGGI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3184 50614108 YULIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3185 50611752 SARAGIH FEBRINA VERONIKA F Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3186 50613480 NAIM DAFFA FAKHRI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3187 50611620 SUHENDRA AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3188 50611361 ZAINULLOH SAIFUL HAQ M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)
ABIHA FATIMAH AZ ZAHRO
3189 50612095 F Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)
UMMU
3190 50611633 RENALDI ADAM M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3191 50612523 NURCAHYADI ABDUL BASIT BUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3192 50612287 KHOLILURROHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3193 50613237 PRIYATNO WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3194 50612536 WANTARA IGA M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3195 50610900 ROHADI DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3196 50612774 KUMALASARI ASA F Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3197 50613817 KUSWOLO DANANG M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3198 50613110 MUSTOFA HABIB ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3199 50613192 NUROHMAH HESTY F Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3200 50611658 HIDAYAT ANDRY M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3201 50611049 IDRIS YOSEP IBRAHIM M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3202 50610913 KUSWOYO EDY M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3203 50612785 MASTUR AHMAD HAMIM M Manufacturing > Assemble CBT Test room-Indonesia 20210407 4th (15:30)

3204 50613564 MAARIF SAEPUL M Manufacturing > Measures CBT Test room-Indonesia 20210407 4th (15:30)

3205 50611917 PURWANTO LATIF M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3206 50613669 SETIAWATI ANA F Manufacturing > Wood joinery CBT Test room-Indonesia 20210408 1st (10:00)

3207 50612097 ANDRIYANTO ELFANDA M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3208 50613980 DEVITA MARYENI F Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3209 50611592 SIDIK FAJAR NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3210 50614199 SOBIRIN MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
3211 50613859 SUYUTI SOLEKHUDDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3212 50613241 NUGROHO ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3213 50610819 SOBARIH ACHMAD SUSANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3214 50610703 DARMAWAN AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3215 50612412 SUTRISNO TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3216 50612192 SINAGA NELLI BR F Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3217 50611755 SANTOSO BAYU M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3218 50612524 ARDIANSYAH MUSLE M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3219 50613787 ANSOR AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3220 50611536 JUNIESA FAQIH M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3221 50614167 ANGGARA TRIO M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3222 50613676 DS ANJAS WAHYU M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3223 50613866 MASFAILLA DIFO AGE M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3224 50610761 AMADREDJA ANNISA F Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3225 50611962 RAMADHAN RIFKI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3226 50613005 SAPUTRO JOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3227 50610981 RAHMANIA DINDA F Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3228 50611643 RAMDANI YANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3229 50611873 MANALU LENARTI F Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3230 50612212 SULASTRI F Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3231 50613285 AKHMAD UNIB M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3232 50611203 WIRNATA M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3233 50613954 PRYANTINO SURYA AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3234 50611894 HENDRIA MERIAM PUTRI F Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3235 50613719 BAKTI GALIH PURNAMA M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3236 50612500 ALAMSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3237 50613263 HAKIM TAFIF LATIFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)

3238 50612985 RIYANTO AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)
ALKARIM PUTRA WAHYU
3239 50612173 M Manufacturing > Assemble CBT Test room-Indonesia 20210408 1st (10:00)
NURFATTAH
3240 50613101 WIDODO SAMPURNO M Manufacturing > Measures CBT Test room-Indonesia 20210408 1st (10:00)

3241 50611808 ASMARUDIN MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3242 50614054 PURNOMO TAUFIK M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3243 50613244 FAHRIZI MUHAMMAD AL M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3244 50613214 PANGESTU TITO ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3245 50610787 SUGITO KANA PENGKU M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3246 50611504 AFRIYANTO TRISNA M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3247 50611759 YANTO NOFI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3248 50612979 MUARIF AAN BILAL M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3249 50611725 GANTINA FAHMI MAULANA M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3250 50611588 HANDIWANSYAH AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3251 50614324 KARSO M Manufacturing > Wood joinery CBT Test room-Indonesia 20210408 2nd (11:30)

3252 50611780 KHOLIK ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3253 50613179 RAHMAWATI NOVITA DEWI F Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3254 50612668 BAQI AWAL AL M Manufacturing > Wood joinery CBT Test room-Indonesia 20210408 2nd (11:30)

3255 50610727 MULUS SAHID M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3256 50612025 JOHAN M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3257 50611331 SAYIDAH F Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3258 50612675 ANDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
3259 50611067 A IRFAN ABDUL RIFAI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3260 50612442 SAPUTRA DANI EGI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3261 50612362 KASWOTO M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3262 50610769 SALAMAH F Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3263 50613068 RIANTO TIRAI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3264 50611860 ARDIANSYAH REKA ANDRES M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3265 50612112 PRASETIYO AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3266 50613692 AZMI TEUKU SYAHRHI MAULIDIL M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3267 50612619 MUSAFAK BATRUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3268 50613325 GUNAWAN IWAN ASEH M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3269 50611097 KRISTIANDI JUNIUS M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3270 50611655 PERMANA SANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3271 50612863 PRABOWO ANDIS KUSTU M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3272 50610803 NURSIPAN M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3273 50613207 PRAYOGO ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3274 50612160 ARANDA DICKY M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3275 50611786 SADIKIN MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3276 50610783 CARMEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 2nd (11:30)

3277 50612590 YUSTIAN EDO M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3278 50611936 ALVIONITA NOVI F Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3279 50610782 TARLI MOHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3280 50612178 TOFIQUROHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3281 50613610 PIBRUANTO ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3282 50613509 ANDRIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3283 50611264 HASAN FUAD M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3284 50610901 SETIAWAN DARMA M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3285 50612490 WARDANA WISNU ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3286 50612050 SEPTIAWAN MUHAMMAD RIZA M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3287 50612020 PRASETIYO AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3288 50613889 RAHMAN ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3289 50614062 SUSANTO EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3290 50612296 KOMARUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3291 50611787 NURLATIF IRZAQUL AULA M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3292 50613805 UTAMA ALDO PUTRA M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3293 50613379 SUHARIN M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3294 50613128 ABDUROZAK MUHAMAD ALWI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3295 50613327 SUCIATI INDAH F Manufacturing > Wood joinery CBT Test room-Indonesia 20210408 3rd (14:00)

3296 50612982 ISKANDAR NUR MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3297 50612256 RAHMAN AHMAD FAIDUR M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3298 50611804 PRATAMA NANDA PUTRA DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3299 50611461 SUPRIADI DIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3300 50613606 YUNITA DEVI F Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3301 50611489 ANGGARA DODI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3302 50612598 ARIWIBOWO AGUNG SENJA M Manufacturing > Wood joinery CBT Test room-Indonesia 20210408 3rd (14:00)

3303 50612646 SETIOSO MOH ALDI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3304 50612569 SUMARNO M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3305 50613947 ANDRIYANSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3306 50612410 WIJAYANTO FANDI AKHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
3307 50610764 NASDA M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3308 50613893 SATRIA AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3309 50614008 THAMA ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3310 50611884 WIDIYONO M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3311 50613346 SETIAWAN RIA M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3312 50612396 PRASONGKO DAFIT M Manufacturing > Assemble CBT Test room-Indonesia 20210408 3rd (14:00)

3313 50611160 RASIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3314 50612996 ARDIYANTO MOH SURYA M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3315 50613535 PRAYOGA HERU M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3316 50611987 SOLEHUDIN SUTANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3317 50612156 YOTAVIANO DIMAS M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3318 50614160 INDRAWAN FICKY M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3319 50612501 HAMIM ABDULLAH M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3320 50613860 SETIAWAN JOKO M Manufacturing > Measures CBT Test room-Indonesia 20210408 4th (15:30)

3321 50612230 SOLIKHIN AKHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3322 50610851 BUDI NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3323 50612583 PRASETIO MUJI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3324 50613979 ANAM SAIFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3325 50612576 SAPUTRA EDI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3326 50613633 WIRAYUDA LUKI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3327 50612324 LATIFURROHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3328 50613714 ISMAIL RIZAL M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3329 50611738 TURIDI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3330 50612674 AF MUHAMAD NUR AZIZ M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3331 50611708 YANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3332 50611021 GUNAWAN WAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3333 50613115 RAHMAN ADE FATHUR M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3334 50613623 ABDILAH KAHFI SUJUD M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3335 50611373 SYARIFUDDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3336 50613315 SUPUTRA ANJAS M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3337 50611527 DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3338 50613481 CAHYA EKO TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3339 50611779 SYAEFUL NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3340 50612118 PERMANA ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3341 50612102 PAMILU FAJAR KUSUMA M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3342 50612057 PUTRA RAHMAD DWI M Manufacturing > Measures CBT Test room-Indonesia 20210408 4th (15:30)

3343 50611477 PRIATMA DIKA MOCHAMAD M Manufacturing > Wood joinery CBT Test room-Indonesia 20210408 4th (15:30)

3344 50611454 AMBANG BACO M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3345 50611824 SOLIHAH MARATUS F Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3346 50611935 WINANDAR WAWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3347 50614069 NURFAUZI MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3348 50613527 HARIYANTO GALANG YOGI M Manufacturing > Assemble CBT Test room-Indonesia 20210408 4th (15:30)

3349 50612528 TARSUDI AMIN M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)
NAINGGOLAN DES LIDIA
3350 50611910 F Manufacturing > Measures CBT Test room-Indonesia 20210409 1st (10:00)
NATALIA
3351 50611740 SINTIYA F Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3352 50612163 SAPUTRA HENGKI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3353 50612721 TRIONO AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3354 50612051 ISKANDAR ANDRE M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
3355 50614109 ANGGI GALUH M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3356 50612738 KURNIAWAN YANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3357 50611558 FIRDAUSE MOCH HABIBIE M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3358 50612577 LISANTO DANU M Manufacturing > Measures CBT Test room-Indonesia 20210409 1st (10:00)

3359 50612764 FATMA KEKE M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3360 50611405 PURNOMO ERUL AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3361 50611996 PUTRA JEKI PRAMANA M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3362 50612182 RISHENDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3363 50611534 HAYATI JULIA F Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3364 50613009 BUDIMAN IMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3365 50610865 SUHERTI F Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3366 50613204 HILAL NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)
PARAMESWARA NANDA
3367 50612540 M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)
YOLANDE
3368 50611473 WIRANTO HANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3369 50610739 ADRIYAN NOWAF M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3370 50611243 RHAFSANJANI FADEL HASEMI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3371 50613292 AMMRULLOH MUSPIK M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3372 50614319 HASAN DZUL FIKRI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3373 50613301 AFUD MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3374 50611099 NAPSIAH SITI F Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3375 50610874 TRIYUDA ERI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3376 50612349 ANAM MIFTAKHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3377 50612458 RINJANI ANDY SENJA M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3378 50614254 RONANI F Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3379 50613251 WAHYUNINGSIH RATNA F Manufacturing > Measures CBT Test room-Indonesia 20210409 1st (10:00)

3380 50613672 SAPUTRA FEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3381 50611985 ISWANTO FAISAL M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3382 50613693 MINTARSIH CICIH F Manufacturing > Measures CBT Test room-Indonesia 20210409 1st (10:00)

3383 50614113 ARUAN CRISMAN DAVID M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3384 50613170 YULIONO M Manufacturing > Assemble CBT Test room-Indonesia 20210409 1st (10:00)

3385 50612462 SUDRAJAT KINANJAR M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3386 50611297 LEONY HANS M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3387 50611613 BAIHAQI GHULAM M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3388 50612713 SAPUTRA DIAN PURNAMA M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3389 50614046 SURYADIN MEI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3390 50612630 ALMAGHFUR BAGUS SOFAN M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3391 50611285 DWIYANTI EVA F Manufacturing > Measures CBT Test room-Indonesia 20210409 3rd (14:00)

3392 50613471 HARTONO LOVI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3393 50611876 AMZA FAUZIN M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3394 50611078 HERMANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)
HAADI IQBAL MAULANA
3395 50611490 M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)
KHOIRUMAN
3396 50613175 SETIAWAN ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3397 50612924 ISMITA SERLY F Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3398 50612397 SAMINGAN M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3399 50614186 ALFERNANDES M Manufacturing > Measures CBT Test room-Indonesia 20210409 3rd (14:00)

3400 50612257 ROHAYUNI F Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3401 50611580 PRIYANTO FRENDI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3402 50612666 NURCAHYA BANDARA M Manufacturing > Wood joinery CBT Test room-Indonesia 20210409 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
3403 50610691 NURHIDAYAT FAJRI M Manufacturing > Measures CBT Test room-Indonesia 20210409 3rd (14:00)

3404 50611362 MUZAKKI AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3405 50611455 AZIZ AHMAD SAEFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3406 50611784 WALUYO M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3407 50612186 FIRMANSYAH MOHAMAD IQBAL M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3408 50612635 HARTO SLAMET M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3409 50612252 EMILIA MEILA F Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)
SINAGA BOBY PAULUS SAUT
3410 50613824 M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)
MARTUA
3411 50614123 TAMPUBOLON PAUL ERIKSON M Manufacturing > Wood joinery CBT Test room-Indonesia 20210409 3rd (14:00)

3412 50611228 NIAMILAH AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3413 50613004 MUSTAKIM MUHAMAD AMIRUL M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3414 50612879 PRATAMA DANI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3415 50614106 PANJAITAN HERMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3416 50614201 SAPUTRA ENDANG M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3417 50613043 HARIMAN TICO ANDIKA M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3418 50613449 TRISSANA M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3419 50613140 HARTINA NOVELIYA PUTRI F Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3420 50614291 LASE ABRYANTO FIRMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210409 3rd (14:00)

3421 50610826 CAHYADI MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3422 50613488 GUNAWAN HENDRI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3423 50612465 DONI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3424 50614200 SAROFANAH F Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3425 50614055 AZIZI RAVIZIO M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3426 50612802 PURNAMA DANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3427 50611739 PEBRIYANA EKA M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3428 50613019 KHALIM ABD M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3429 50612111 SUPRIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3430 50613445 TAMALASARI FITRI F Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3431 50613969 GUMELAR AGUNG M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3432 50611965 ARDIANTAMA ALFIQ M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3433 50613342 HARFANI FISTA F Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3434 50612845 PRASETYO FAJAR MIRDO M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3435 50611823 SUKARNO M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3436 50611750 FATHONI AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3437 50613259 JULIARDI ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3438 50612387 PRIANTO DEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3439 50611031 KUSUMAH ALDI BAHTIAR M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3440 50611611 ROHENDI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210409 4th (15:30)

3441 50612709 FADLI M M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3442 50612194 TRIANA VIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3443 50611327 JULIANTI ELI F Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3444 50611933 ANDRIANSAH M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3445 50611414 TAHIMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3446 50614392 RATNASARI DESI F Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3447 50614090 TRIWAHYUDI ANGGI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3448 50613774 ALI MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3449 50612130 HARIADI ACHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3450 50612522 SETIADI IKHWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
3451 50611836 YUSUF MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3452 50613155 SUSILAWATI DEWI F Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3453 50613847 KURNIAWAN DEDE M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3454 50611841 BASIT AHMAD ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3455 50613926 RANTIKA F Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3456 50611982 KHAMILA INTANIA CAHYA F Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3457 50610716 AFIF HARIST LUTFI M Manufacturing > Assemble CBT Test room-Indonesia 20210409 4th (15:30)

3458 50610933 AROPAH YASIN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3459 50613008 EFENDI SIGIT ARDIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3460 50610744 MUQTAFIN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3461 50614383 KASMO M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3462 50610992 RAHMAN ZAMZAM ZAKIA M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3463 50613368 KASNANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3464 50611701 JUWITA RICA F Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3465 50613688 RAHIM IHSAN ARDIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3466 50612882 DANDI MAS M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3467 50611487 PURNAMA GITA M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3468 50612859 MIFTAHUDDIN ARIF M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3469 50610964 JULIYANTO ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3470 50611417 DANI MOHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3471 50610863 WAKRONI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3472 50612360 IHSAN ANDRI AL M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3473 50614079 WARIDA F Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3474 50613312 NURROKHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3475 50612383 SAPUTRA AZIZ ANDRE M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3476 50613423 LISTIANI FITTRIZAH F Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3477 50613932 HENDRIYANTO FAJAR M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3478 50611819 ROMAWI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3479 50614234 SETIAWAN YUSUF M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3480 50613205 WIDAYAT SYAMSUL M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3481 50611039 RAHMADAN EGIA M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3482 50612928 RAMADHAN RICO KURNIA M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3483 50611312 MUMININ SAIFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3484 50612447 ISMAIL RIZALDI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3485 50611747 SOPIAN YOPI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3486 50613977 IRWANZAH DIMAS M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3487 50610884 BAHRUN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3488 50611094 KAROMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3489 50612121 KURNIAWAN ARJUN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3490 50612932 BIMA M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3491 50611058 ADISWARA MARDI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3492 50611073 KHALWANI M M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3493 50612317 IMRON ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3494 50613411 SUKIMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 1st (10:00)

3495 50612265 CAHYUDI EKO M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3496 50611110 NURHAYATI IIN F Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)
MUBAROK MUHAMMAD FAHRI
3497 50613348 M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)
AL
3498 50614083 SINAGA CRESSTAMI F Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
3499 50610762 PUTRI NADIA IMAN F Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3500 50614286 SAPUTRA DWI BUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3501 50612680 SUGANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3502 50611269 RIYADI AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3503 50611905 KUSMAYANTO HELY M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3504 50611390 HERMAWAN FERRY M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3505 50613150 MAHMUD AMIR M Manufacturing > Wood joinery CBT Test room-Indonesia 20210412 2nd (11:30)

3506 50614253 ROHMAN ABDUL M Manufacturing > Measures CBT Test room-Indonesia 20210412 2nd (11:30)

3507 50612728 WIJAYA EDO SETIYO M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3508 50613657 ARDIANSAH RONI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3509 50613390 DIMUKTI ADIKA CAHYA M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3510 50611047 NURALAMSYAH MUH AMMAR M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3511 50612929 WIBOWO PRASTYO M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3512 50610778 ALFATIK AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3513 50611052 SALMIN M Manufacturing > Measures CBT Test room-Indonesia 20210412 2nd (11:30)

3514 50611875 PRATAMA ADITYA M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3515 50611988 RISMAWAN RIZKI FAHRI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3516 50611679 RADINA M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3517 50613833 FERAWATI F Manufacturing > Wood joinery CBT Test room-Indonesia 20210412 2nd (11:30)

3518 50611555 ANANDA FIKRI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3519 50612380 PRASETYA FIRDAUS DWI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3520 50613108 ANWAR MIFTAKHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3521 50613525 PRIYONO HENDRO M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3522 50612565 PRASETIO MUHAMAD HERMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3523 50614247 RAHMAWATI RIAJENG F Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3524 50610892 WICAKSANA ANGGA M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3525 50614202 SUSANTO RIO ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3526 50614233 NUR MOHAMAD FERDI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3527 50613397 DANIANSYAH RIDHO M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3528 50611192 PERMANA RIZQI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3529 50614278 WIJAYA HARIS ADI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3530 50612783 ISWORO BENI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3531 50612127 ANDIATMA FIRDAUS CAHYA M Manufacturing > Assemble CBT Test room-Indonesia 20210412 2nd (11:30)

3532 50611201 SUROSO M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3533 50613094 ADITYA AGIL M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3534 50612556 IRWANTO AKHMAD ZAENI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3535 50613741 MANIK SERLI F Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3536 50611374 AHMADI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3537 50611610 SUNJAYA EDI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210412 3rd (14:00)

3538 50613751 FITRIYAH RISKA SAYYIDATUL F Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3539 50612626 SAPUTRA YOGI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3540 50614157 PURWASI VERA F Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3541 50614149 SARI FITRI WINDA F Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3542 50614081 SAPUTRA DIYON M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3543 50612974 SARI RANI NOVITA F Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3544 50612844 ARISANDI EBIN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3545 50611641 RODILAH MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3546 50611336 AKMADUN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
HAQQANI ABDURRAHMAN
3547 50613877 M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)
IHKAMUDDIN
3548 50610979 HERMAWAN IRWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3549 50612819 ISA SAHID ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3550 50612534 PRATAMA ADITYA GATA M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3551 50610772 SYARIFUDDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3552 50611194 JIHAD MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3553 50614116 SIMANUNGKALIT JAHOLONG M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3554 50613868 RIVALDO RIO M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3555 50611675 HADI MUHAMMAD SAEFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3556 50612608 ANDRIYAN ALFIN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3557 50613215 ANABAH IDRIS M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3558 50614067 NAWAWI MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3559 50611384 KAHFI ASMAUL M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3560 50612312 ABDULAH M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3561 50613194 SETIAWAN FENDI AGUS M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3562 50614229 RIDWAN M Manufacturing > Wood joinery CBT Test room-Indonesia 20210412 3rd (14:00)

3563 50612024 MUSLIM ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3564 50612165 PRASETYO HENGKI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3565 50612422 ANGGIANTI NUNUK F Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3566 50613967 SAPUTRA DIMAS ALFA M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3567 50614192 KUNCORO ARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3568 50610788 WINANDA IRFAN ARI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 3rd (14:00)

3569 50612687 ZETENDRA JOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3570 50613996 PURNOMO HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3571 50611459 MARUF HANAN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3572 50613544 MARTIN JIMI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210412 4th (15:30)

3573 50611735 BAHARUDIN DHONI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3574 50613607 PRADANA SHANDY M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3575 50611236 MAULANA IKBAL M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3576 50612289 HANDOKO TOTO M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3577 50612279 FATONI MOH M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3578 50611980 ARINDA PUTRI F Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3579 50613604 KAUSAR FAIS AL M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3580 50611398 AZIS ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3581 50612748 FAUZI RAHMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3582 50612589 HUDA AKHMAD ROBIUL M Manufacturing > Measures CBT Test room-Indonesia 20210412 4th (15:30)

3583 50613021 WAKHYUDI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3584 50611424 ALFARISI MUHAMAD SYAHID M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3585 50611170 PRIYONO REDI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3586 50613040 SIHAB RIZKI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3587 50614221 CAHYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3588 50613760 WIDIYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3589 50611341 ALIYUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3590 50612909 RIZAL ARIF ANANG M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3591 50611795 ARMANDO ARIF M Manufacturing > Wood joinery CBT Test room-Indonesia 20210412 4th (15:30)

3592 50612036 ZAKARIA MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3593 50611151 LUBIS ALFAN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3594 50613417 LESMANA DONNI JIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
3595 50612460 HAKIM LUKMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3596 50611488 HUDAIBIAH EBI F Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3597 50613146 DARMA MEGI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210412 4th (15:30)

3598 50612743 UMAR M PATHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3599 50613648 GUSMANIAR F Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3600 50614139 TORIKIN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3601 50613024 QORNI WAIST AL M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)
SIHOMBING PININTA
3602 50613872 F Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)
MAGDALENA
3603 50611672 CASTIMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3604 50611335 ABRORI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3605 50611947 HARTONO PRI M Manufacturing > Assemble CBT Test room-Indonesia 20210412 4th (15:30)

3606 50613201 HARMOKO M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3607 50612208 SEMBIRING DANIEL SEPTANUS M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3608 50612634 HARYANTO CUCUN M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3609 50613276 MUNANDAR RAMELAN ARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3610 50614125 ARIFIN TRIO ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3611 50612934 FADILAH ROSDIANA LAELY F Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3612 50612222 ASHARI HUSAIN M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3613 50612965 AZIS DARUL M Manufacturing > Wood joinery CBT Test room-Indonesia 20210413 1st (10:00)

3614 50614071 SUGIARTO IWAN M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3615 50613563 SEPTIANDA EKY M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3616 50612970 SETIAWAN AZIS M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3617 50612527 SUPRIYONO DOYO M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3618 50613209 BAKHRI SAEFUL M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3619 50611377 APIYANDI RIZDI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3620 50612539 SAPUTRA DWI INDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3621 50613683 SURO MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3622 50612234 SOLEH AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3623 50612854 DAESIH F Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3624 50614066 KURNIAWAN VERI M Manufacturing > Wood joinery CBT Test room-Indonesia 20210413 1st (10:00)

3625 50611973 SUGINO M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3626 50612867 KUSYANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3627 50612030 WIJAYANTO RIZKI HADI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3628 50612364 NGALIM IKHSAN NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3629 50611785 PURNAMA HERU M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3630 50611953 ISROFIL BANI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3631 50613998 PRABOWO KRISNA AJI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3632 50611636 BILLAH MUTASHIM M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3633 50613447 OWEN FETRIC M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3634 50614119 SIBARANI HENKY PAULINUS M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3635 50611827 SETIAWAN TEDI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3636 50614330 TARJONO M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3637 50611105 NURSANDI ANGGIT M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3638 50611126 MAULANA RIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3639 50610930 KRISDIANA KIKI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3640 50613279 KHOZIN AHMAD NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3641 50613798 ARNANI F Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)

3642 50612400 WIDIANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210413 1st (10:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
3643 50611241 MELAWATI F Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3644 50612751 MELLI F Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3645 50613435 RIFAI MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3646 50611628 FIRMANSYAH YAYANG M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3647 50611407 YULISTIYANI INDRI F Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3648 50611303 HIRAWAN ROYA M Manufacturing > Measures CBT Test room-Indonesia 20210413 2nd (11:30)

3649 50614357 AFIFFULLOH DHANY M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3650 50610797 DARMAWAN DADI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3651 50612902 SAPUTRA DIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3652 50610896 CAHAYA M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3653 50612361 PERMANA LUKI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3654 50611482 CAHYADI MUHAMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3655 50614195 PRIHANTORO ALFATUR FARHAN M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3656 50610756 YUSUP M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3657 50613938 SEMBIRING ASAMTA RAS M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3658 50614064 PRASETYO DIMAS M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3659 50611991 FAROGA HENDRA IMEL M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3660 50613157 PRASETYO ARDI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3661 50611574 MAULANA DIMAS FAJAR M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3662 50614047 YANTO FEBRI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3663 50613261 BILANTORO YOGA MEI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3664 50611497 DINI MUHAMMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3665 50611586 ARIYADI ANDI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3666 50613367 PRABOWO DIYON M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3667 50612336 HIDAYAT ANGGIT NUR M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3668 50613615 AZIZ MUHAMMAD ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3669 50612125 ROHIMAH F Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3670 50613013 NUGROHO DWIYAN ARIS M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3671 50612217 PRIMAGUNA SATRIO M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3672 50610690 SUTHEJA HENDRO M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3673 50613690 AKBAR RIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3674 50613104 AMRI SUBEHI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3675 50614272 SETIAWAN DONI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3676 50613158 FATMAWATI WIWIT F Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3677 50612103 IRAWAN ARRIE POERNA M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3678 50611726 HALOMOAN BINSAR ROBIN M Manufacturing > Assemble CBT Test room-Indonesia 20210413 2nd (11:30)

3679 50614266 WAHYUDIN M Manufacturing > Wood joinery CBT Test room-Indonesia 20210413 2nd (11:30)

3680 50612579 SHODIQ AHMAD M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3681 50612995 PRIYAGI BISMA FIRMAN M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3682 50613106 HAKIM LUKMAN NUL M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3683 50611798 ROZAK M FATHUR M Manufacturing > Wood joinery CBT Test room-Indonesia 20210413 3rd (14:00)

3684 50611945 AM ADIK ALFIAN M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3685 50614011 PRAYOGO HERU M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3686 50613588 KATMO M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3687 50611960 PURNOMO TANTO M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3688 50613853 HABIBI MUHAMMAD HARIST M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3689 50611627 GUNAWAN HENDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3690 50613660 ADIANSYAH ANDESI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)
SESI
NO NO UJIAN NAMA GENDER PILIHAN INDUSTRI RUANG UJIAN TGL UJIAN
UJIAN
3691 50613049 ARYANTO AAN M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3692 50612888 ARDIANSYAH M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3693 50613213 PURNOMO AZIZ M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3694 50612766 SETIYAWAN DEDE M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3695 50613433 PUJAWATI SISKA F Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3696 50612968 AWALUDIN IKSANUL M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3697 50611589 WIYANTO SUPRI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3698 50611053 SUWARLI ALI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3699 50612678 ROZAKI ABDUL M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3700 50612984 PRAYOGI ANGGI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3701 50613896 ARIANSYAH JOHAN SIDIK M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)
RUNMANSYAH NANANG
3702 50610785 M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)
RIZKHON
3703 50613087 NUGROHO ZANUAR HARI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3704 50612881 APRIYAN ALBERTUS DENY M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3705 50612652 NURHADI BANI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3706 50613598 DONA HENDRA PRIMANA M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3707 50614303 ANGGONO TRI M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3708 50612365 RATNO M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3709 50610702 FITRIANI FEBY NURAMALIA F Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3710 50612594 TRANSAROJI ADE M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3711 50612815 SISWANTO TEGUH M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3712 50611195 AMALI AHMAD ISLAHUL M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3713 50612028 SUSANTO RATNO KUSMONO M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3714 50612318 ISLAHUDIN M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3715 50613772 SATRIA ARIANDRA M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

3716 50612214 MASHUDIN KHOLIK M Manufacturing > Assemble CBT Test room-Indonesia 20210413 3rd (14:00)

Jakarta, 25 Januari 2021


Direktur
Penempatan Pemerintah

TTD

Drs. Dwi Anto, M.Si.


NIP. 19610203 198703 2 001

You might also like