You are on page 1of 9

Project Title: T Mosque.

Project Site: Fifth Settlement, New Cairo,


Cairo, Egypt.

Project Client: Mr. Hany Hasan.

Project Typology: PU2 Public Buildings.

Project Site Area / Built Area: 2498 m2 /


1868 m2.

Project Program: - Outdoor Prayer Area.


- Indoor Men & Women
Prayer Areas.
- Ablution Area.
- Toilets.
- Imam’s Apartment.
- Minaret.
- Lobbies & Circulation
Corridors.

Project Statement: Taking a modern ap-


proach to the design of a mosque, the “ma-
frooka” Islamic pattern was used to integrate
the plot space and the Qibla direction that
the mosque will be oriented towards. The
design aims to create a sleek holistic spiritu-
al feeling through the spatial design and pat-
tern integration. As well as the incorporation
of shadow and the light as two contrasting
miracles of compassion that descend upon
all creation from the creator.
Form Generation Study
Inspired by the simple structure of a mosque and showing re-
spect to the plot boundary as well as the Qibla direction.
Ground Floor Plan
Scale 1:400

Site Plan Upper Floor Plan


Scale 1:300 Scale 1:400
Section AA
Scale 1:200

Front Elevation Back Elevation


Scale 1:300 Scale 1:300
3D Render
Approach to Main Entrance
3D Render
Outdoor Prayer Area
3D Render
Landscape Area
3D Render
Entrance to Indoor Prayer Area
3D Render
Indoor Prayer Area

You might also like