You are on page 1of 31

Accepted Manuscript

Forecasting spare part demand using service maintenance information

Sarah Van der Auweraer, Robert Boute

PII: S0925-5273(19)30101-X
DOI: https://doi.org/10.1016/j.ijpe.2019.03.015
Reference: PROECO 7329

To appear in: International Journal of Production Economics

Received Date: 13 April 2018


Revised Date: 21 January 2019
Accepted Date: 13 March 2019

Please cite this article as: Van der Auweraer, S., Boute, R., Forecasting spare part demand using
service maintenance information, International Journal of Production Economics (2019), doi: https://
doi.org/10.1016/j.ijpe.2019.03.015.

This is a PDF file of an unedited manuscript that has been accepted for publication. As a service to
our customers we are providing this early version of the manuscript. The manuscript will undergo
copyediting, typesetting, and review of the resulting proof before it is published in its final form. Please
note that during the production process errors may be discovered which could affect the content, and all
legal disclaimers that apply to the journal pertain.
ACCEPTED MANUSCRIPT
Forecasting Spare Part Demand using Service Maintenance Information

Sarah Van der Auweraer 1 and Robert Boute 1,2


1
Research Center for Operations Management,
Faculty of Business and Economics, KU Leuven,
Naamsestraat 69, box 3500,
B-3000 Leuven, Belgium,
2
Technology & Operations Management Area,
Vlerick Business School, Belgium

PT
RI
Corresponding author: Sarah Van der Auweraer

Sarah Van der Auweraer


Research Center for Operations Management,

SC
Faculty of Business and Economics, KU Leuven,
Naamsestraat 69, box 3500,
B-3000 Leuven, Belgium,

U
sarah.vanderauweraer@kuleuven.be

+32 16 37 42 41
AN
Acknowledgements
M

This research was supported by the Research Foundation-Flanders (FWO-Vlaanderen), grant no. G069016N.
D
TE
C EP
AC
ACCEPTED MANUSCRIPT

Forecasting Spare Part Demand using Service Maintenance Information

Abstract

PT
We focus on the inventory management of critical spare parts that are used for service maintenance. These
parts are commonly characterized by a large variety, an intermittent demand pattern and oftentimes a high

RI
shortage cost. Specialized service parts models focus on improving the availability of parts whilst limiting
the investment in inventories. We develop a method to forecast the demand of these spare parts by linking it

SC
to the service maintenance policy. The demand of these parts originates from the maintenance activities that
require their use, and is thus related to the number of machines in the field that make use of this part (known

U
as the active installed base), in combination with the part’s failure behaviour and the maintenance plan.
We use this information to predict future demand. By tracking the active installed base and estimating the
AN
part failure behaviour, we provide a forecast of the distribution of the future spare parts demand during the
upcoming lead time. This forecast is in turn used to manage inventories using a base-stock policy. Through
a simulation experiment, we show that our method has the potential to improve the inventory-service trade-
M
off, i.e., it can achieve a certain cycle service level with lower inventory levels compared to the traditional
forecasting techniques for intermittent spare part demand. The magnitude of the improvement increases for
D

spare parts that have a large installed base and for parts with longer replenishment lead times.
TE

Keywords: Inventory management, Forecasting, Spare parts, Service maintenance, Installed base

1. Introduction
EP

In this paper we propose a forecast method for spare part demand by making use of information on
the maintenance operations. We address the following research questions: (1) How can we use information
C

from maintenance operations to generate forecasts, and (2) to what extent does this method improve the
inventory management of the spare parts, compared to more traditional forecast methods that only rely on
AC

historical part demand to construct forecasts.


Efficient spare part management is indispensable for companies that increasingly offer services related
to the products they originally supply. Indeed, the after-sales activities (such as maintenance and repairs)
generate a more steady stream of revenue and can as such be an important source of profit (Auramo &
Ala-risku, 2005; Cohen et al., 2006). At the same time, challenges are associated with managing these

Preprint submitted to Elsevier March 14, 2019


ACCEPTED MANUSCRIPT

after-sales activities in a cost-effective way. The demand for spare parts, for instance, is very hard to
predict. When a critical part is requested and not available in stock, the company is not able to perform
the maintenance operation in time. This could jeopardize a client’s productivity, causing time delays and
high costs. To prevent part unavailability, companies keep stock buffers to deal with the uncertainty in part
demand. Keeping extra stock, however, can become costly when this is done for a large number of items, or

PT
for expensive items. Efficient spare parts inventory management is thus an important but challenging task,
where the investment in inventories is to be traded off against the desired service levels.

RI
1.1. Background and Motivation

Our research is inspired by an Original Equipment Manufacturer (OEM) in the compressed air, generator,

SC
and pump industry who is currently facing these challenges. The OEM has service maintenance contracts
with its customers, in which they guarantee a pre-defined availability of spare parts. The OEM is thus
responsible for the maintenance of the machines installed at its customers. We refer to those assets as the

U
active installed base, i.e., the number of sold (installed) machines that haven’t been discarded, and can

AN
generate spare parts demand either to replace failed components or for preventive maintenance. The OEM
currently manages over 250 000 different spare parts. The demand for approximately 40 000 of these parts
is currently forecasted using simple exponential smoothing (SES) and inventories are managed using a base-
M
stock policy. For the remaining 210 000 parts demand is too small (only one or two items per year) or
too little historical demand observations are available to keep the part in inventory. The company aims to
D

increase the part availability in the future, without unduly inventory investments. To date, the spare part
inventory is managed by the Service Logistics department. The Service Operations department, however,
TE

who is in charge of the maintenance operations itself, is increasingly collecting data on its installed base, such
as machine survival and part reliability data. The Service Logistics department is therefore investigating
EP

whether they can make use of this information to improve their spare part inventory management.
Managing spare part inventory is challenging, as many of them are characterised by an intermittent
demand pattern: many periods of zero demand interspersed by occasional non-zero demands (e.g., Boylan
C

& Syntetos, 2010). As standard forecasting techniques produce inaccurate results for these intermittent
AC

demands, specific techniques have been developed, with Croston-based methods the most widely used (Cros-
ton, 1972; Syntetos et al., 2009a; Boylan & Syntetos, 2010; Bacchetti & Saccani, 2012). These techniques are
time-series based in the sense that rely on the historical demand pattern and assume it can be extrapolated
to predict future demand. the assumption that future values of the demand series can be predicted based on
past demand, and no attempt is made to identify variables that influence the series (Stevenson, 2012). We
believe that we can use more detailed sources of information, such as reliability characteristics and the main-

2
ACCEPTED MANUSCRIPT

tenance policy, to generate forecasts, rather than merely looking at past demand data. The amount of data
collected and stored by companies increases, which makes the use of more sophisticated data driven methods
possible. These methods allow to capture the drivers of the demand, instead of the observed demand alone.

1.2. Related Literature

There are a number of papers that discuss the use of installed base information for spare part demand

PT
forecasting (see Van der Auweraer et al., 2019). The demand drivers that are most commonly discussed in
literature are the maintenance policy, which depicts when a part is replaced (e.g., Hu et al., 2015; Romeijnders

RI
et al., 2012), the size and age of the installed base (e.g., Jalil et al., 2011; Kim et al., 2017; Stormi et al.,
2018), and the part failure probability (e.g., Barabadi, 2012; Si et al., 2017; Ritchie & Wilcox, 1977). Those

SC
works tend to focus on only a specific subset of installed base information and the combination of these
different demand drivers is generally lacking. Moreover, the literature typically makes a distinction between
forecasting models for spare part demand for preventive maintenance (e.g., Hu et al., 2015; Romeijnders

U
et al., 2012; Wang & Syntetos, 2011; Wang, 2011) and forecasting demand for corrective maintenance (e.g.,

AN
Hong et al., 2008; Jin & Liao, 2009; Kim et al., 2017; Minner, 2011; Stormi et al., 2018), sometimes also
referred to as reliability based forecasting. Both are rarely combined, however.
The literature on reliability based forecasting tends to focus on a specific phase in the product life cycle
M
(PLC) of the installed base, oftentimes the initial (e.g., Jin & Liao, 2009) or end-of-life (EOL) phase (e.g.,
Hong et al., 2008; Kim et al., 2017). By restricting the analysis to a specific PLC phase, simplifying model
D

assumptions can be made. For example, when the end-of-life phase is studied, potential expansion of the
installed base in the future can be neglected, which reduces the complexity of the forecasting problem.
TE

However, these models are not applicable in the other life cycle phases and are in this way limited. In
addition, the majority of the methods makes restrictive distributional assumptions, for example on the
EP

failure behaviour of the parts. Exceptions to this are Minner (2011) and the extension of his model by
Wu & Bian (2015). Their methods are applicable in every phase of the PLC and are not restrictive on
the distributional assumptions. Nonetheless, these approaches rapidly become complex and computationally
C

intensive because of their recursive nature, which renders them hard to apply in a practical setting.
AC

When it comes to the benefit of using information from the service operations, we find that they generally
increase the forecast accuracy of spare parts. the proposed methods in the literature generally show promis-
ing performance: they are capable to predict the actual demand well and increase forecast accuracy. Nev-
ertheless, their performance evaluation is typically decoupled from inventory management and their impact
on inventories and availability is rarely evaluated. This is in contradiction to Syntetos et al. (2010), who
state that forecasting performance in an inventory context should always be evaluated with respect to its

3
ACCEPTED MANUSCRIPT

implications for stock control.

1.3. Our Contribution to the Literature

Our work contributes to the existing literature by offering a versatile forecast method that considers
a larger set of spare part demand drivers (in combination with each other) to construct the forecasts. It
incorporates information on the maintenance policy, which can be either corrective or preventive. Corrective

PT
maintenance generates stochastic demand, whereas preventive maintenance interventions generate deter-
ministic demand, as they are known in advance. Our method also takes into account the evolution of the

RI
active installed base over time, which can increase through the sales of new machines that are serviced and
decrease through the end-of-use of old machines. Finally, our method considers the part reliability, which

SC
defines when a part in the installed base will fail and require a corrective replacement. We refer to this
collection of information used as Service Maintenance Information (SMI).
Our method is applicable throughout the full PLC, and is not tailored to one specific phase. Consequently,

U
there is no need for separate methods for the different PLC phases, and there is no need to identify the current

AN
PLC stage. Moreover, it does not put restrictions on the probability distributions of the different model
components as it uses real data observations to generate its forecast. The method uses a statistical fit on the
historical part failures, and continuously improves this fit (“learns”) as more information becomes available.
M
The versatility of our method makes it applicable for a large variety of parts, regardless of the part specific
characteristics and without any distributional assumption.
D

We also consider the data requirements for our method to be amenable for implementation in a practical
setting. Our method requires data of historical machine sales and discards to track the evolution of the
TE

installed base over time, a history of past part failures to estimate the part failure probability, and information
on past preventive maintenance actions on the installed machines together with the current preventive
EP

maintenance schedule –if applicable.


The result of our forecast is an estimate of the distribution of the demand during the upcoming lead
time. This distribution can be used as an input for an inventory policy; we apply it to determine the optimal
C

base-stock policy to attain a pre-defined target service level. This way, we connect forecasting directly with
AC

inventory management.
We find that our method has the potential to improve forecast accuracy and outperform the current
state-of-the-art forecasting procedures for intermittent demand. The proposed method is able to achieve a
higher inventory-service efficiency, especially when the installed base is large and lead times are long.
The paper is organised as follows: In Section 2 we introduce and describe our forecasting method. We
evaluate its performance in a numerical study, which we introduce in Section 3. The results of this numerical

4
ACCEPTED MANUSCRIPT

t The current point in time. t >0.


L The replenishment lead time.
j The machine age; t – time of machine installation. j ≤ t.
i The part age; t – time of part installation. i ≤ j.
pi,j,t,L The probability of a demand occurring for a part of age i, installed in a machine of age j,
in the time interval (t, t + L].
pm
j,t,L The conditional probability of a machine with age j to survive after the lead time L, esti-
mated at time t.

PT
ppi,t,L The conditional failure probability of a part with age i in (t, t + L], estimated at t.
nij (t) The counted number of parts with age i, installed in machines with age j, at t.
D
b t,L The demand forecast made at time t over lead time L.
Nt The size of the active installed base at time t.

RI
λ
bt+s The estimated number of future machine sales occurring in period t + s, estimated at t.
Tp The lifetime of a part (time from replacement until failure)
Tm The economic lifetime of a machine (time from installation until discard)

SC
fTp (θ) The probability distribution of the time until part failure.
fTm (θ) The probability distribution of the time until machine discard.

Table 1: Notations used.

U
study are discussed in Section 4. Section 5 concludes the paper.
AN
2. Installed Base Forecasting for Future Service Part Demand
M
In this section we present our approach to use information on the maintenance operations to forecast
future spare parts demand. We distinguish between three main sources of information: (1) the maintenance
policy, (2) the size and age of the installed base, where we distinguish between the installation of the machine
D

and the installation of the part, and (3) the part reliability. These model components are explained in further
TE

detail in the following sections. Table 1 presents the notation used.


The spare part demand forecast, D
b t,L , is made at time t for the upcoming replenishment lead time L.

This timeframe is denoted by the discrete time interval (t, t+L]. The lead time L is considered deterministic,
EP

and in our company example its value can range from a week to over five months. At time t, we estimate
the probability pbi,j,t,L that a part of age i installed in a machine with age j generates a demand in the
C

upcoming lead time L. Next, we monitor how many parts nij (t) of age i are installed in machines with
age j. The forecast D
b t,L then consists of the sum of the demand probabilities for each of the parts in the
AC

installed base. In the remainder of this section we first describe how the demand forecast is derived when
a corrective maintenance policy is in place (i.e., with only corrective replacements). Thereafter, in Section
2.6 we discuss the demand forecast in case a preventive maintenance policy applies (with corrective and
preventive replacements).

5
ACCEPTED MANUSCRIPT

2.1. The Active Installed Base

The active installed base can be defined as the set of systems or products for which a company provides
after-sales services (Dekker et al., 2013). It is the active set of machines, which contain the part under study
and can generate a future demand for spare parts. This is the number of machines that has been sold to
customers and has not been discarded yet. A machine discard occurs when a customer ends the use of a

PT
machine. We observe the active installed base at time t and note the age j of each active machine. The age
j of the machine is a discrete number and represents its time since installation.

RI
Machines typically last longer than their parts, which are replaced upon failure of the part (or preven-
tively). Therefore, we also monitor the age i of the studied part in each installation, i.e., the time since the
last part replacement, or if the part has not been replaced yet, the time since installation. We explicitly

SC
distinguish between part age and machine age, contrary to, for example, Kim et al. (2017), because a demand
occurs for a machine that is still active and experiences a failure, and machines can be discarded from the

U
active installed base before they have failed, which means they can no longer generate a spare part demand.
The part age is a discrete number, expressed in the same time unit as the machine age. Thus, the part age
AN
is always smaller than or equal to the age of the machine in which it is installed: i ≤ j. The part age i drives
the part failure probability, and the machine age j drives the machine survival probability.
M
Let Nt denote the size of the active installed base at time t, which corresponds to the sum of the number
of parts nij (t) of age i installed in machines of age j, for each part-machine age combination at time t:
D

j
t X
X
Nt = nij (t). (1)
j=1 i=1
TE

As the installed base is monitored at each time t, we do not need to make assumptions on its evolution
over time, and its product life cycle behaviour is automatically captured.
EP

In practical settings, monitoring the installed base implies keeping track of the machine sales and discards
to determine the size and age of the installed base, and of the maintenance interventions, i.e., the timing
of the corrective and preventive part replacements. As such, the company can determine nij (t) by simply
C

counting the number of parts of age i, installed in active machines of age j.


AC

2.2. Demand Probability

Every part of age i, installed in a machine of age j, has a probability of being replaced in the upcoming
lead time, that is in the interval (t, t + L]. This probability is denoted by pi,j,t,L , which depends on both
the failure probability of the part, defined by the part age i, and the probability that the machine is not
discarded during the lead time, depending on the machine age j. The demand probability pi,j,t,L is therefore
defined by the product of (1) the failure probability of the part with age i in the interval (t, t + L], ppi,t,L ,

6
ACCEPTED MANUSCRIPT

which is independent of the machine age j, and (2) the survival probability of a machine with age j, pm
j,t,L ,

which is independent of the part age i and the part failure behaviour. Let Tp denote the lifetime of a part
(time from replacement until failure) and Tm the economic lifetime of a machine (from installation until
discard). We can then express pi,j,t,L as:

pi,j,t,L = P (Tp ≤ i + L|Tp > i) · P (Tm > j + L|Tm > j)

PT
(2)
= ppi,t,L · pm
j,t,L .

We estimate the probability of pi,j,t,L using an estimation of the part failure probability ppi,t,L , and an

RI
estimation of the machine survival probability pm
j,t,L , which are discussed next.

2.3. Machine Survival Probability

SC
The machine lifetime Tm is stochastic, but we assume that machines installed at different points in time
have identical lifetime probability distribution fTm . We consider machine lifetime independent of the part

U
lifetime. This implies that the lifetime of a machine solely depends on the machine age j, and not on the
age of the consisting parts nor the number of historical failures this machine has already experienced. This
AN
independence seems a reasonable assumption if the machines are expensive relative to the parts (mix of
expensive and cheaper items). In that case, a machine will not be discarded if it experiences part failures,
M
but it will be repaired and parts will be replaced. This is in contrast to, for example, consumer electronics,
where the decision to discard the product is highly dependent on the number of historical failures of the
D

product and the customer’s willingness to repair (again) (Lu & Wang, 2015).
The probability at time t that the machine is not discarded in the time interval (t, t + L] is defined by
TE

R∞
f (θ)dθ
j+L Tm
pm
j,t,L = R ∞ . (3)
j
fTm (θ)dθ
EP

Typically, fTm (θ) is not known by the service provider. However, when a company keeps track of the
evolution of its installed base over time, it can estimate fTm (θ), and consequently pm
j,t,L , using censored

observation data of the historical machine lifetime data.


C

2.4. Part Failure Behaviour


AC

Without loss of generality, we assume there is no influence of different usages or the operating environ-
ment on the failure probability distribution, and parts installed at different points in time have identical
lifetime probability distribution fTp (θ). We consider parts that are non-repairable, i.e., need replacement
and generate a part demand upon failure. When replaced, we assume the part to be as-good-as-new.
Analogously to the probability of a machine discard, we determine for each of the parts in the active
installed base the conditional probability of failure during the upcoming lead time ppi,t,L , given that the part

7
ACCEPTED MANUSCRIPT

did not fail yet, and has reached age i at time t:


R i+L
fTp (θ)dθ
ppi,t,L = i
Ri , (4)
1 − 0 fTp (θ)dθ

where fTp (θ) is the probability distribution of the time-to-failure.


In some cases, fTp (θ) can be estimated directly using data from, for example, stress testing. An alternative

PT
would be to keep track of historical corrective and preventive replacements, in which case the company needs
to register the type of replacement with the associated part ages upon replacement, as well as the age of parts

RI
which are still operational at the time of observation. Those part ages are in fact the part survival time.
For failed parts, the survival time is recorded as a non-censored observation. For preventively replaced parts

SC
and parts which are still operational, this survival time is a lower bound; it is registered as a right-censored
observation. Moreover, for parts that did not fail but whose machine is no longer active, the part survival
time gets a lower bound as well. This way, a distribution can be fit and ppi,t,L can be estimated. Because the

U
machine discards are implicitly taken into account in the estimate, pm
j,t,L is already included in the estimation

of the part failure probability ppi,t,L .

2.5. Lead Time Demand Forecast


AN
To obtain the lead time demand forecast we first estimate the demand probabilities for the different part
M
age - machine age combinations in the installed base using an estimator of the part failure probability and
an estimator of the machine surivial probability:
D

pbi,j,t,L = pbpi,t,L · pbm


j,t,L , (5)
TE

which we then multiply with the respective ni,j (t) to obtain the demand estimated at time t over the risk
period1 L. The lead time demand forecast D
b t,L then equals:
EP

j
t X
X
D
b t,L = nij (t) · pbi,j,t,L . (6)
j=1 i=1
C

In addition, we can also include the possibility of new machines sales that cause a part failure during
that same lead time. We acknowledge that in most cases the effect will be limited because the duration of
AC

the lead time is typically smaller compared to the time to failure. The number of new installations during
the lead time can be estimated either by assuming a sales process, or by including projections from the
marketing department. The expected number of sales in period t + s is denoted by λ
bt+s . Each of the newly

1 Note that in a periodic review inventory policy, demand is forecasted over the risk period, which is defined by the lead time

plus the review period.

8
ACCEPTED MANUSCRIPT

installed items has an associated demand probability of pi,j,t+s,L−s . The forecasted part demand, estimated
at time t over L, is then given by:

X j
t X L
X
D
b t,L = nij (t) · pbi,j,t,L + bt+s · pb0,0,t+s,L−s .
λ (7)
j=1 i=1 s=1

In order to use the forecast as a decision input for an inventory policy we need to forecast the distribution

PT
of the lead time demand. For each part in the installed base, the probability of demand is expressed by
pbi,j,t,L . The forecast of the probability distribution of the lead time demand at time t, Pb(Dt,L ) is then

RI
defined by a Poisson binomial distribution, i.e., a sum of independent Bernoulli random variables which may
have different expectations, namely pbi,j,t,L (Hong, 2013). Note that when the expectations, pbi,j,t,L , are equal

SC
for all i and j, the Poisson binomial distribution boils down to a binomial distribution.
With an active installed base of size Nt at time t and the forecasted lead time demand probability at
time t for part k, denoted as pbk , k ∈ [1, Nt ], we then have the following forecast of the lead time demand

U
probabilities:
Nt
Pb(Dt,L = 0) =
Y
AN
a=1
(1 − pba ),

...,
!
M
X Y Y
Pb(Dt,L = dt,L ) = pba · (1 − pbb ) , (8)
A∈Zn a∈A b∈Ac

...,
D

Nt
Y
Pb(Dt,L = Nt ) = pba ,
TE

a=1

with Zn the combinations of parts in the active installed base that can be selected from {1 ,2, . . . , Nt } for
which the total demand equals dt,L . For example, if we estimate the probability of demand to be equal
EP

to two (Pb(Dt,L = 2)), with an active installed base consisting of three parts (Nt = 3), then Zn constitutes
all the combinations of two part numbers that can generate a demand of two: Zn =(1,2),(2,3),(1,3). A is
C

then the set of possible parts that effectively generate a demand (i.e., fail) in the subset of Zn , for example
A = {1, 2}, and Ac is its complement: Ac = {1 ,2, . . . , Nt } \A, in this case Ac = 3. In our example, we
AC

p1 · pb2 ) · (1 − pb3 ) + (b
would then obtain Pb(Dt,L = 2) = (b p2 · pb3 ) · (1 − pb1 ) + (b
p1 · pb3 ) · (1 − pb2 ).

2.6. Preventive Maintenance Policy

Spare part demand not only comes from unscheduled corrective replacements (due to failures), but also
from preventive replacements. The latter stems from scheduled maintenance, aimed at preventing failures
by replacing parts before they fail. We assume that for both corrective and preventive maintenance actions,

9
ACCEPTED MANUSCRIPT

Figure 1: Illustration of preventive replacements, with τ = 8 and Nt = 2.

PT
spare parts replace the failed or worn parts.
Preventive maintenance can be time-based, i.e., a part is replaced every so many running hours or after

RI
a certain calendar time, regardless of its condition, or inspection-based, where a part is inspected after a
certain time and it is decided upon whether to replace the part or not. Between two preventive replacements,

SC
a breakdown might still occur, calling for a corrective replacement. When a time-based periodic replacement
policy is in place and the planned periodic maintenance interventions are not rescheduled due to intermediate

U
corrective interventions within the periodic maintenance interval, the preventive replacements generate a
deterministic demand stream. When such a preventive policy applies, we can exploit the knowledge about
AN
planned maintenance, which is known as advance demand information, to predict its demand.
We denote τ as the periodic maintenance interval, i.e., the calendar time between two preventive main-
M
tenance interventions. A larger interval τ reduces the total number of preventive replacements but increases
the probability of an unplanned corrective intervention (if τ approaches ∞, the preventive policy reduces to
a corrective policy). A short interval τ , however, does not fully utilise the part lifetime. The optimal length
D

of the maintenance interval τ is the result of this tradeoff (e.g., Jardine & Tsang, 2013). In our work, we
TE

consider the value of τ as exogenously given.


The actual planning of the time-based periodic part replacement is based on the time since installation.
We define tj,P M as the time of the next periodic replacement of the part under study for a machine with
EP

age j. As such, tj,P M equals the time of installation of the machine, (t − j) , plus the smallest value that
is a multiple of the periodic maintenance interval and exceeding the machine age j. If we define T as the
C

set {τ , 2τ , 3τ ,. . . }, then tj,P M = (t − j) + min{x|x ∈ T , x > j}. This is illustrated in Figure 1, where a
demand forecast is made at time 10, the installed base consists of two machines, installed at time 1 and 7
AC

respectively, with τ = 8. At time t = 10, the age of the first installed machine equals 9 and the age of the
second installed machine equals 3. As such, t9,P M = (10 − 9) + 2 × 8 = 17 and t3,P M = (10 − 3) + 1 × 8 = 15.
If the lead time L = 7, the forecast for the preventive maintenance demand at time t = 10 equals 2.
The total number of replacements in the upcoming lead time Dt,L is at least as large as the number of

10
ACCEPTED MANUSCRIPT

planned periodic replacements, that is, larger than or equal to:


Nt
X
Ik,tj,P M (9)
k=1

where Ik,tj,P M is an indicator function that equals one if for part k, installed in a machine with age j,
tj,P M ∈ (t, t + L], and zero otherwise. To account for discards we can correct Equation (9) with the number

PT
of planned discards in (t, t + L].
When a preventive maintenance policy is in place, the demand originating from corrective replacements

RI
during the lead time is forecasted by the probability that a part with age i fails during the lead time,
but prior to the periodic replacement, that is in the interval (t, min(tj,P M , t + L)]. Let π be the age of

SC
the part at the time of the periodic replacement or at the end of the lead time, whichever comes first:
π = min{i + (tj,P M − t), i + L}. Then:

fTp (θ)dθ
ppi,j,t,L = i
, (10)

U
Ri
1 − 0 fTp (θ)dθ

AN
where fp (Tp ) is the probability distribution of the time-to-failure, estimated based on censored failure ob-
servations. Remark that under a preventive policy the failure probability ppi,j,t,L becomes dependent on the
machine age, as it determines the timing of the periodic replacement.
M
The forecasted distribution of the total part demand for both preventive and corrective replacements in
the upcoming lead time is then given by:
D

Nt
X Nt
Y
Pb(Dt,L = Ik,tj,P M + 0) = (1 − pba ),
TE

k=1 a=1

...,
Nt
X X Y Y
Pb(Dt,L = Ik,tj,P M + dt,L ) = ( pba (1 − pbb )), (11)
EP

k=1 A∈Zn a∈A b∈Ac

...,
Nt Nt
C

X Y
Pb(Dt,L = Ik,tj,P M + Nt ) = pba .
k=1 a=1
AC

3. Numerical Study

We set up a simulation experiment to illustrate the benefits of our forecasting method using Service
Maintenance Information (SMI). The prime benchmark method in our study is the Syntetos-Boylan Ap-
proximation (SBA) method discussed by Syntetos & Boylan (2005). Hasni et al. (2018) show in a recent
study the potential outperformance of this method compared with bootstrapping techniques for intermittent

11
ACCEPTED MANUSCRIPT

demand, and as such advocate the value of the SBA method as a benchmark. In addition, we compare
with simple exponential smoothing (SES) (e.g., Brown, 1963; Gardner, 2006), as this method is often used
in industry and also by the OEM which motivates our research. We first discuss the design of the simu-
lation experiment (Section 3.1), and then we address the performance evaluation of the forecast methods
throughout the product life cycle (Section 3.2).

PT
3.1. Experimental Design

We make the following assumptions for every period t (where t equals one week) in our simulation

RI
experiment. First, machines containing the part under study are sold to customers. They become operational
immediately after the sales have occurred. We assume new sales occur following a Poisson process with rate

SC
λ, although it is possible to use any kind of sales process. We consider two different machine installation
rates λ = {0.25; 1.25} installations per week. To mimic the product life cycle, we distinguish three stages in
the sales process. We let the expected sales be λ/2 in the first 240 weeks, λ in the next 400, and again λ/2

U
in the final 160 weeks (until the sales end).

AN
Second, when machines terminate their life, they no longer generate a spare part demand. We assume a
random machine survival probability and use an exponential distribution with parameter 1/ρ to model the
time to discard, but any type of distribution can be included (exponentially distributed machine survival has
M
been used by for example Gharahasanlou et al., 2016; Hong et al., 2008; Hu et al., 2015; Kim et al., 2017;
Liu & Tang, 2016; Stormi et al., 2018). The average lifetime of a machine in our simulation experiment is
D

set to ρ = 720 weeks.


Third, maintenance is performed and parts are replaced. The time to failure probability distribution can
TE

take any shape, although in a realistic setting it is positive and typically skewed to the right. Examples
are the lognormal distribution, the exponential distribution, or the Weibull distribution. We opt to use the
EP

latter in this study, with scale and shape parameters α and β, as suggested by Barlow & Hunter (1960).
We consider two different part failure properties α={336; 480} and β=1.5, assuming a machine operates
continuously (24/7). The scale and shape parameter of the part failure behaviour, α and β, are not affected
C

by the product life cycle, as they are independent of the life cycle of the installed base. The preventive
AC

maintenance interval is considered exogenous, and is set to τ = 2/3α.


Fourth, the installed base record is updated by monitoring and counting the parts in active machines
with its respective ages i and j. And fifth, a demand forecast for the upcoming lead time is made. The lead
time L varies from 1 to 20 weeks. We set the smoothing constants for the SES and SBA forecast methods
equal to γ = 0.1, which is common practice for intermittent demand. As such, we investigate 80 scenarios
with parameter values inspired by the OEM and summarised in Table 2.

12
ACCEPTED MANUSCRIPT

Parameter Values
λ {0.25; 1.25} per week
α {336; 480}
β 1.5
ρ 720 weeks
τ 2/3 α
L {1,2,...,20} weeks
γ 0.1

PT
Table 2: Parameter settings of the numerical experiment.

RI
U SC
AN
Figure 2: Illustration of the link between the PLC of a machine, the installed base evolution, and the spare part demand per
period, together with the timings of the simulation experiment (Adapted from Dekker et al., 2013).
M

3.2. Performance Evaluation for Different PLC Phases


D

We evaluate the model performance by registering the forecast accuracy, the achieved cycle service level,
TE

and the average per period inventory holdings, in the three life cycle phases (initial, mature, and end-of-life).
Although the forecast method is identical in each of the three, we distinguish the performance evaluation in
these life cycle phases because the dynamics of spare part demand are related to those of the demand for
EP

machines (Dekker et al. 2013). Figure 2 illustrates the connection between the product life cycle and spare
part demand. For the initial phase, we assume no previous knowledge on the part failure behaviour exists.
C

We can thus only start to make an estimate about the parameters of the part failure probability in this phase
as soon as the first demand occurs. From then on, the model is periodically updated, i.e. we re-estimate
AC

the failure behaviour based on new observations. We evaluate the model performance in the initial phase
during the first 240 weeks, starting with the first machine installation in week 1. The SBA method is also
initialised in this initial phase as proposed by Teunter & Duncan (2009). In the mature phase, we observe
the model performance from week 400 to 640, and in the EOL phase we observe week 1360 until week 1600.
The performance of the methods is measured for every scenario in 100 simulation runs. Table 3 reports

13
ACCEPTED MANUSCRIPT

Initial phase Mature phase EOL phase


λ α (1) (2) (3) (1) (2) (3) (1) (2) (3)
ADS CV APZ ADS CV APZ ADS CV APZ
0.25 336 1.02 0.04 97.85 1.1 0.27 83.15 1.08 0.25 87.06
480 1.01 0.01 98.69 1.07 0.22 88.69 1.05 0.18 90.66
1.25 336 1.1 0.26 89.1 1.55 0.51 39.77 1.4 0.47 49.88
480 1.05 0.15 93.61 1.32 0.45 56.32 1.27 0.42 61.92

PT
Table 3: Descriptive demand statistics for β = 1.5 and ρ = 720 weeks: (1) The average per period demand size, when demand
occurs (ADS), (2) the coefficient of variation of the per period demand size (CV), and (3) The average percentage of periods
with zero demand (APZ).

RI
U SC
AN
M
D
TE

Figure 3: Example of a spare part demand time series, for λ = 1.25, α = 480, β = 1.5 and ρ = 720.
EP

some descriptive demand statistics for the different scenarios, which shows the variety in demand patterns
in the different scenarios: (1) The average demand size, when demand occurs (ADS), (2) the coefficient
C

of variation of the demand size, when it occurs (CV ), and (3) the average percentage of weeks with zero
demand (AP Z). Figure 3 provides an example of a demand pattern for λ = 1.25, α = 480, β = 1.5, ρ = 720,
AC

and the EOL phase starting after 800 weeks.

4. Results and Discussion

We first discuss the performance of our proposed method when only corrective maintenance is in place.
We focus both on forecast accuracy (Section 4.1) as well as inventory implications (Section 4.2). Thereafter,
we discuss the performance of our method when a preventive maintenance policy is in use (Section 4.3).

14
ACCEPTED MANUSCRIPT

Initial phase Mature phase EOL phase


λ α SES SBA SMI SES SBA SMI SES SBA SMI
0.25 336 0.002 0.009 -0.004 0.005 0.061 -0.005 -0.001 -0.012 0
480 0.002 0.002 -0.005 0.004 0.059 0.003 -0.001 -0.012 0.001
1.25 336 0.011 0.062 -0.012 0.025 0.075 0.005 -0.009 0 0.004
480 0.007 0.037 -0.009 0.016 0.059 -0.003 -0.007 -0.008 0.003

Table 4: Mean Error (ME) measured in the different PLC phases. The lowest absolute value for each scenario and PLC phase

PT
is shaded. Additional parameter values: β = 1.5 and ρ = 720 weeks.

Initial phase Mature phase EOL phase


λ α SES SBA SMI SES SBA SMI SES SBA SMI

RI
0.25 336 0.162 0.159 0.163 0.446 0.44 0.435 0.392 0.383 0.381
480 0.128 0.126 0.132 0.364 0.36 0.356 0.326 0.319 0.317
1.25 336 0.361 0.36 0.358 0.99 0.981 0.966 0.86 0.848 0.836
480 0.271 0.269 0.272 0.781 0.771 0.762 0.72 0.709 0.701

SC
Table 5: Root Mean Square Error (RMSE) measured in the different PLC phases. The lowest value for each scenario and PLC
phase is shaded. Additional parameter values: β = 1.5 and ρ = 720 weeks.

U
4.1. Forecast Accuracy

AN
We use the classic measures to evaluate forecast accuracy: Mean error (ME), and Root Mean Square
Error (RMSE). We do not include relative-to-the-series measures, such as the mean average percentage error,
because the actual demand (and thus the denominator in these forecast accuracy measures) is oftentimes
M
zero in intermittent demand patterns (Syntetos & Boylan, 2005). The results for the one-period-ahead ME
and RMSE are presented in Table 4 - 5. Our method using Service Maintenance Information is denoted as
D

SMI and is benchmarked against the Syntetos-Boylan approximation (SBA) and simple exponential smooth-
ing (SES).
TE

We find that the SMI method outperforms SES and SBA in the mature and EOL phase according to
both forecast accuracy measures, although the difference is limited. The SMI method is outperformed in the
EP

initial phase of the PLC by SBA, but the difference is again very small.
We also observe that the SMI method tends to overestimate demand slightly in the initial phase, resulting
in a small negative ME. Given the large amount of zero values in the initial phase (between 89.1% and 98.69%
C

of the periods have zero demand), SES and SBA have a higher forecast accuracy in this phase.
AC

Figure 4 shows the forecasting performance of the SMI and SBA methods for one particular scenario in the
mature phase. The SMI method, indicated by the dotted line, anticipates the increase in demand, whereas
the SBA method (the dashed line) lags behind. Moreover, the SBA method is very reactive whenever
a demand occurs, whereas the SMI methods provides a more stable forecast. Although not displayed in
Figure 4, similar behaviour can be observed in the EOL phase, where the SBA method tends to lag behind
on the decreasing trend in demand and consequently overestimates demand. This is also indicated by the

15
ACCEPTED MANUSCRIPT

PT
RI
U SC
Figure 4: The forecasting performance of SBA and SMI compared to the actual demand, for λ = 1.25, α = 480, β = 1.5 and
ρ = 720 in the mature phase.

negative ME for SBA (and SES) in this phase.


AN
M
4.2. Inventory Implications

In addition to the forecast performance, we also measure the impact of our SMI forecast method on the
inventory holdings. We use a periodic order-up-to-level (T, S) policy, which is often used in an intermittent
D

demand context (e.g., Eaves & Kingsman, 2004; Sani & Kingsman, 1997; Syntetos & Boylan, 2006; Syntetos
TE

et al., 2009b). At the end of the review period T , the demand forecast is estimated and the optimal order-
up-to-level St is determined to satisfy a target service level. A replenishment order is placed to raise the
inventory position up to the level St .
EP

We consider the inventory review period T to be one week. During a week the following sequence of events
occurs: receive orders (placed L+1 weeks ago) at the beginning of the week, observe demand throughout
C

the week, forecast future demand (at the end of the week), evaluate the inventory position, and place a new
order if necessary.
AC

The order-up-to level St is optimised to meet a target cycle service level (CSL), which is the target
fraction of cycles in which demand can be delivered from stock. In our experiment, we attempt to meet a
CSL of respectively 70%, 80%, 85%; 90%, 95%, and 99%. Backorders can be carried forward. We use Eq. (8)
to define the forecasted lead time demand distribution, Pb(Dt,L = x), for the SMI method under corrective

16
ACCEPTED MANUSCRIPT

PT
RI
U SC
Figure 5: Example of a cumulative lead time demand distribution at t = 600, when a corrective maintenance policy is in place,

AN
with λ = 0.25, α = 336, β = 1.5, ρ = 720, L = 6 weeks and T = 1 .

maintenance. As such, St is the smallest integer value that satisfies


M
St
X
CSL ≤ Pb(Dt,L = x). (12)
x=0
D

Figure 5 illustrates the forecasted lead time demand distribution for the scenario with λ = 0.25, α = 336,
L = 6, T = 1, at time t = 600, where a corrective maintenance policy is in place. For a target service level
TE

of 70% and 99%, the required base-stock level equals 2 and 6 respectively.
To determine the order-up-to-level when the SES and SBA forecast methods are used, it is necessary to
EP

make an assumption on the underlying demand distribution (Syntetos et al., 2009a). We follow the approach
of Babai et al. (2012), Syntetos & Boylan (2006), and Syntetos et al. (2015) to approximate the lead time
demand by a Negative Binomial Distribution (NBD). The NBD is defined by a mean and a variance, which
C

can be defined based on the forecasts. The mean of the distribution is estimated by the lead time (+ review
AC

period) demand forecast. The variance is constructed by the associated smoothed mean squared error (MSE),
M SEt,T +L , with a smoothing constant η of 0.25 (Babai et al., 2012; Pennings & Dalen, 2017; Syntetos et al.,
2010):
( t
)2
X
M SEt,T +L = η b t−(T +L),T +L −
D + (1 − η)M SEt−1,T +L , (13)
i=t−T −L+1

where Di is the demand occurring in period i. The NBD assumes the variance to be larger than the mean.

17
ACCEPTED MANUSCRIPT

PT
RI
U SC
Figure 6: Tradeoff between the achieved CSL and the average inventory levels, averaged over all scenarios, when a corrective
maintenance policy is in place.
AN
When this assumption is not met, Sani & Kingsman (1997) show that the variance can be set equal to 1.1
M
times the mean. The order-up-to level for a target CSL is calculated as the corresponding quantile of the
lead time (plus review period) demand distribution.
D

We investigate the tradeoff between the achieved CSL and the average per period inventory levels nec-
essary to attain this CSL. Figure 6 presents this tradeoff curve over all scenarios, life cycle phases, and lead
TE

times, and shows how the SMI method outperforms SES and SBA. As the tradeoff curve associated with the
SMI method lies consistently above the frontier of SES and SBA, using the SMI forecast method results in
EP

lower average inventory holdings than SES and SBA, for the same service level. Likewise, it yields a higher
service level for the same inventory holdings.
If we look into more detail, we can observe differences in performance between the PLC phases (Figure 7).
C

In the initial phase (Figure 7a), the SMI method is outperformed for most CSL targets by SBA and SES.
AC

As indicated by the ME, SMI overestimates demand in the initial phase, and consequently reaches high
CSLs with more inventory than necessary. SES and SBA, on the contrary, underestimate the demand in
the initial phase according to the ME, resulting in lower inventory levels. Because of the highly sporadic
nature of demand in the initial phase (89 to 98% of periods without demand) SES nonetheless reaches the
target CSLs of 70%, and 80%. For a target CSL over 95%, however, the SMI method outperforms SES and
SBA in the initial phase, achieving a higher CSL with lower inventory levels. In the mature and EOL phase

18
ACCEPTED MANUSCRIPT

PT
RI
(a) Initial phase (b) Mature phase

U SC
AN
M
D

(c) EOL phase


TE

Figure 7: Tradeoff between the achieved CSL and the average inventory levels in the different PLC phases, averaged over all
scenarios, when a corrective maintenance policy is in place.

(Figures 7b-7c), the SMI method outperforms SES and SBA consistently. In the EOL phase (Figure 7c) we
EP

observe that for a target CSL of 99%, the SMI average inventory levels are 41% lower compared to SBA,
and 56% lower relative to SES.
C

In both the mature and EOL phase, we observe that the efficiency gains of the SMI method are higher for
longer lead times and a large installed base. Figure 8 illustrates the efficiency curves for the EOL phase for
AC

short (L=1) and long (L=20) lead times, and small (λ=0.25) and large (λ=1.25) installed base sizes. The
gap between the SMI method and the SBA and SES method increases when L increases. The SMI method
anticipates the demand, whereas SBA and SES lag behind. This lagging effect increases when lead times
are longer. Figure 8 also shows how the outperformance of the SMI method augments when the size of the
installed base increases. In this case, SMI has more information available to generate its forecasts.

19
ACCEPTED MANUSCRIPT

PT
RI
(a) λ=0.25, L=1 (b) λ=0.25, L=20

U SC
AN
M
D

(c) λ=1.25, L=1 (d) λ=1.25, L=20


TE

Figure 8: Tradeoff between the achieved CSL and the average inventory levels in the EOL phase, for different values of lead
time and installed base size, with α=366, β=1.5, and ρ=720.
EP

Similar behaviour can be observed in the mature phase, as illustrated in Figure 9. Here, we present the
results for three different lead time scenarios (L=1, L=8, and L=20), when λ=1.25 and α=480. The SMI
method outperforms SBA and SES in terms of efficiency, and the difference in performance increases with a
C

longer lead time.


AC

4.3. Preventive Maintenance

When a periodic preventive replacement policy is in place the SES and SBA methods can be applied in
two ways: Either we can use them to forecast all demand (both for corrective and preventive replacements),
as is often done in practice. Or the methods can be applied to only forecast the stochastic part of the demand,
i.e., the demand for corrective replacements, and separate it from the demand for preventive replacements,

20
ACCEPTED MANUSCRIPT

PT
RI
U SC
(a) L=1
AN (b) L=8
M
D
TE
EP

(c) L=20
C

Figure 9: Tradeoff between the achieved CSL and the average inventory levels in the mature phase, for different lead time
values, with λ=1.25, α=480, β=1.5, and ρ=720.
AC

21
ACCEPTED MANUSCRIPT

PT
RI
SC
Figure 10: Tradeoff between the achieved CSL and the average inventory levels, averaged over all scenarios, when a preventive
maintenance policy is in place.

U
which is known some time in advance (see also Poppe et al., 2017). We refer to the former methods as SES

AN
and SBA, and to the latter methods as SES PM and SBA PM.
Figure 10 shows the inventory-service tradeoff curve of SES, SBA , SES PM and SBA PM compared with
our SMI method, averaged over all scenarios, life cycle phases, and lead times. It illustrates how SES PM
M
and SBA PM (continuous lines) outperform their counterparts which do not include the advance demand
information (dashed lines). The SMI method outperforms all methods.
D

Looking at the different lifecycle phases, we find that in the initial phase (Figure 11a) the SMI method
only outperforms the other forecast methods for high target CSLs. This was also observed when a corrective
TE

maintenance policy was in place (Figure 7a). In the mature and EOL phase (Figure 11b and 11c) the SMI
method outperforms SBA and SES, even when advance demand information of the preventive replacements
EP

is taken into account in their forecasts (SES PM and SBA PM).

5. Conclusions
C

In this paper we present a method to forecast spare part demand which incorporates information on the
AC

service maintenance operations that drive spare part demand. The main idea behind our approach is that
spare part demand is generated by part failures and equipment maintenance, which is useful information to
predict future demand. We consider a larger set of spare part demand drivers (in combination with each
other) than the existing literature to construct the forecasts: information on the (evolution of the) active
installed base, the part reliability, and the maintenance policy to forecast future spare part demand.
We provide a forecast of the distribution of the future spare parts demand during the upcoming lead

22
ACCEPTED MANUSCRIPT

PT
RI
U SC
(a) L=1
AN (b) L=8
M
D
TE
EP

(c) L=20
C

Figure 11: Tradeoff between the achieved CSL and the average monthly inventory levels in the different PLC phases, when a
preventive maintenance policy is in place.
AC

23
ACCEPTED MANUSCRIPT

time, rather than a point forecast. This distribution is in turn used to manage inventories; We apply it to
determine the optimal a base-stock policy to attain a pre-defined target service level. This way, we connect
forecasting directly with inventory management.
Our approach is intuitively appealing and straightforward, which can facilitate its implementation in
practice. Additionally, our method is applicable throughout the full product life cycle of the installed

PT
machines, which means there is no need to use different methods for each of the PLC phases, and there is
also no need to identify each PLC stage. Moreover, it can be applied both when both a corrective and a

RI
preventive maintenance policy apply, and it is not dependent on predefined probability distributions.
A numerical simulation experiment shows its improvement potential compared to the current best-in-
class forecast methods that do not take this service maintenance information into account. Our method is

SC
capable to achieve higher cycle service levels with lower inventories in the mature and end-of-life phase of
the machines, and its improvement potential is larger when the installed base is relatively large, and when

U
lead times are longer.
The main challenge to implement our method is the collection of accurate data. Our method requires
AN
keeping track of historical machine sales and discards to monitor the evolution of the installed base over
time, as well as a history of past part failures, and information on (past and future) preventive maintenance
M
interventions. As such, forecasting becomes the outcome of an inter-organizational process, where cooper-
ation and information sharing (for example on historical failures, maintenance actions, and product sales)
between different departments within the same company is needed. When the quality of the data is poor,
D

the method lacks its necessary inputs.


TE

A second limitation of our method is that it does not consider the possibility of a part requiring mul-
tiple replacements within the same replenishment lead time, where the replaced part (either preventive or
corrective) fails again prior to its replenishment. This renders the model less accurate with very long lead
EP

times (multiple months) in combination with short part lifetimes (failure within the month). In most set-
tings, including ours, the time to failure is typically much longer than the replenishment lead time. Heavy
C

equipment typically has an expected lifetime of several years, where the probability of the two replacements
within the same replenishment lead time is negligible.
AC

For future work we suggest to investigate the impact of imperfect or missing information on the results,
given the sensitivity of our method to good data quality. We could also extend the model with inspection-
based preventive maintenance, where the demand originating from preventive inspections is also stochastic.
Finally, whereas this paper optimises inventories for a given target service level, future research could be
devoted to a dynamic inventory model with cost-optimal service levels.

24
ACCEPTED MANUSCRIPT

References

Auramo, J., & Ala-risku, T. (2005). Challenges for going downstream. International Journal of Logistics:
Research and Applications, 8 , 333–345.

Babai, M. Z., Ali, M. M., & Nikolopoulos, K. (2012). Impact of temporal aggregation on stock control

PT
performance of intermittent demand estimators : Empirical analysis. Omega, 40 , 713–721. doi:10.1016/
j.omega.2011.09.004.

RI
Bacchetti, A., & Saccani, N. (2012). Spare parts classification and demand forecasting for stock control:
Investigating the gap between research and practice. Omega, 40 , 722–737.

SC
Barabadi, A. (2012). Reliability and spare parts provision considering operational environment: A case
study. International Journal of Performability Engineering, 8 , 497–506.

U
Barlow, R., & Hunter, L. (1960). Optimum Preventive Maintenance Policies. Operations Research, 8 ,
90–100.
AN
Boylan, J. E., & Syntetos, A. A. (2010). Spare parts management: A review of forecasting research and
extensions. IMA Journal of Management Mathematics, 21 , 227–237.
M
Brown, R. G. (1963). Smoothing, Forecasting and Prediction of Discrete Time Series. Englewood Cliffs,
New Jersey: Prenctice-Hall.
D

Cohen, M. A., Agrawal, N., & Agrawal, V. (2006). Winning in the aftermarket. Harvard Business Review ,
TE

(pp. 129–138).

Croston, J. D. (1972). Forecasting and Stock Control for Intermittent Demands. Operational Research
EP

Quarterly, 23 , 289–303.

Dekker, R., Pinçe, Ç., Zuidwijk, R., & Jalil, M. N. (2013). On the use of installed base information for spare
C

parts logistics: A review of ideas and industry practice. International Journal of Production Economics,
143 , 536–545.
AC

Eaves, A. H. C., & Kingsman, B. G. (2004). Forecasting for the Ordering and Stock-Holding of Spare Parts.
The Journal of the Operational Research Society, 55 , 431–437. doi:10.1057/palgravejors.2601390.

Gardner, E. S. (2006). Exponential smoothing : The state of the art — Part II. International Journal of
Forecasting, 22 , 637–666. doi:10.1016/j.ijforecast.2006.03.005.

25
ACCEPTED MANUSCRIPT

Gharahasanlou, A. N., Ataei, M., Khalokakaie, R., Ghodrati, B., & Jafarie, R. (2016). Tire demand planning
based on reliability and operating environment. International Journal of Mining and Geo-Engineering,
50 , 239–248.

Hasni, M., Aguir, M. S., Babai, M. Z., & Jemai, Z. (2018). Spare parts demand forecasting : a review on
bootstrapping methods. International Journal of Production Research, . doi:10.1080/00207543.2018.

PT
1424375.

Hong, J. S., Koo, H.-y., Lee, C.-s., & Ahn, J. (2008). Forecasting service parts demand for a discontinued

RI
product. IIE Transactions, 40 , 640–649.

SC
Hong, Y. (2013). On computing the distribution function for the Poisson binomial distribution. Computa-
tional Statistics and Data Analysis, 59 , 41–51.

Hu, Q., Bai, Y., Zhao, J., & Cao, W. (2015). Modeling spare parts demands forecast under two-dimensional

U
preventive maintenance policy. Mathematical Problems in Engineering, 2015 .

AN
Jalil, M. N., Zuidwijk, R., Fleischmann, M., & van Nunen, J. A. (2011). Spare parts logistics and installed
base information. Journal of the Operational Research Society, 62 , 442–457.
M
Jardine, A. K. S., & Tsang, A. H. (2013). Maintenance, replacement, and reliability: theory and applications.
CRC press.
D

Jin, T., & Liao, H. (2009). Spare parts inventory control considering stochastic growth of an installed base.
TE

Computers and Industrial Engineering, 56 , 452–460.

Kim, T. Y., Dekker, R., & Heij, C. (2017). Spare part demand forecasting for consumer goods using installed
base information. Computers and Industrial Engineering, 103 , 201–215.
EP

Liu, X., & Tang, L. C. (2016). Reliability analysis and spares provisioning for repairable systems with
dependent failure processes and a time-varying installed base. IIE Transactions, 48 , 43–56.
C

Lu, X.-C., & Wang, H.-N. (2015). The Laptop Spare Parts Studying under Considering Users’ Repair
AC

Willingness. International Journal of Simulation Modelling, 14 , 158–169.

Minner, S. (2011). Forecasting and Inventory Management for spare Parts: An Installed Base Approach. In
N. Altay, & L. A. Litteral (Eds.), Service Parts Management Chapter 8. (pp. 157–169). London: Springer.

Pennings, C. L. P., & Dalen, J. V. (2017). Integrated hierarchical forecasting. European Journal of Opera-
tional Research, 263 , 412–418.

26
ACCEPTED MANUSCRIPT

Poppe, J., Basten, R. J. I., Boute, R. N., & Lambrecht, M. R. (2017). Numerical study of inventory
management under various maintenance policies. Reliability Engineering and System Safety, 168 , 262–
273.

Ritchie, E., & Wilcox, P. (1977). Renewal theory forecastting for stock control. European Journal of
Operational Research, 1 , 90–93.

PT
Romeijnders, W., Teunter, R., & Van Jaarsveld, W. (2012). A two-step method for forecasting spare parts
demand using information on component repairs. European Journal of Operational Research, 220 , 386–

RI
393.

Sani, B., & Kingsman, B. G. (1997). Selecting the Best Periodic Inventory Control and Demand Forecasting

SC
Methods for Low Demand Items. Journal of the Operational Research Society, 48 , 700–713. doi:10.1057/
palgrave.jors.2600418.

U
Si, X.-s., Zhang, Z.-X., & Hu, C.-H. (2017). An adaptive Spare Parts Demand Forecasting Method Based

AN
on Degradation Modeling. In Data-Driven Remaining Useful Life Prognosis Techniques Chapter 15. (pp.
405–417). Berlin: Springer.

Stevenson, W. J. (2012). Operations Management: Theory and Practice. New York: McGraw-Hill/Irwin.
M
Stormi, K., Laine, T., Suomala, P., & Elomaa, T. (2018). Forecasting sales in industrial services: Modeling
business potential with installed base information. Journal of Service Management, 29 , 277–300.
D

Syntetos, A. A., & Boylan, J. E. (2005). The accuracy of intermittent demand estimates. International
TE

Journal of Forecasting, 21 , 303–314.

Syntetos, A. A., & Boylan, J. E. (2006). On the stock control performance of intermittent demand estimators.
EP

International Journal of Production Economics, 103 , 36–47. doi:10.1016/j.ijpe.2005.04.004.

Syntetos, A. A., Boylan, J. E., & Disney, S. M. (2009a). Forecasting for inventory planning: a 50-year review.
C

Journal of the Operational Research Society, 60 , 149–161.


AC

Syntetos, A. A., Nikolopoulos, K., & Boylan, J. E. (2010). Judging the judges through accuracy-implication
metrics : The case of inventory forecasting. International Journal of Forecasting, 26 , 134–143. doi:10.
1016/j.ijforecast.2009.05.016.

Syntetos, A. A., Nikolopoulos, K., Boylan, J. E., Fildes, R., & Goodwin, P. (2009b). The effects of inte-
grating management judgement into intermittent demand forecasts. International Journal of Production
Economics, 118 , 72–81.

27
ACCEPTED MANUSCRIPT

Syntetos, A. A., Zied Babai, M., & Gardner, E. S. (2015). Forecasting intermittent inventory demands:
Simple parametric methods vs. bootstrapping. Journal of Business Research, 68 , 1746–1752. doi:10.
1016/j.jbusres.2015.03.034.

Teunter, R. H., & Duncan, L. (2009). Forecasting intermittent demand: a comparative study. The Journal
of the Operational Research Society, 60 , 321–329. doi:10.1057/palgrave.jors.2602569.

PT
Van der Auweraer, S., Boute, R. N., & Syntetos, A. A. (2019). Forecasting spare part demand with in-
stalled base information : A review. International Journal of Forecasting, 35 , 181–196. doi:10.1016/j.

RI
ijforecast.2018.09.002.

SC
Wang, W. (2011). A joint spare part and maintenance inspection optimisation model using the Delay-Time
concept. Reliability Engineering and System Safety, 96 , 1535–1541.

Wang, W., & Syntetos, A. A. (2011). Spare parts demand: Linking forecasting to equipment maintenance.

U
Transportation Research Part E , 47 , 1194–1209.
AN
Wu, X., & Bian, W. (2015). Demand Analysis and Forecast for Spare Parts of Perishable Hi-Tech Products.
In Logistics, Informatics and Service Sciences (LISS), 2015 International Conference on (pp. 1–6). IEE.
M
D
TE
C EP
AC

28
ACCEPTED MANUSCRIPT
- We develop a new method to forecast spare part demand.
- Our forecast method makes explicit use of service maintenance information.
- Our forecast method is applicable throughout the entire product life cycle.
- Our method outperforms the current policies in forecast and inventory performance.
- The efficiency improvement increases for a large installed base and long lead time.