Professional Documents
Culture Documents
Area B - Asfalt-Sh6
Area B - Asfalt-Sh6
Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS © 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS
B1 B2 B3
DPE
OD125H
© 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS © 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS © 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS
B4 B5 B6
LEGEND
NewTransmision main
Existing pipelines
Distribution area B
© 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS © 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS © 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS
border line
Air valve
B-234
L= 25.00 m
Hydrant
Northing arrow
B-032
40H
DPE
B-030
E
B-404 No.11
2 2 5HDP
O D
REVISIONS
OD9
PE
0HD
B-224 Somaliland
ENGINEER
Approved by:
JV CES Consulting Engineers Z. Vrekic
B-226 Saltzgitter GmbH and Checked by:
MS Consultancy K. Zaric
© 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS © 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS © 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS
Designed by:
K. Zaric
Project
Construction of Hargeisa Water
Supply and Basic Sanitation Scale
Project 1:2500
SHEET:
Title
6/6
DISTRIBUTION NETWORK
AREA B DRAWING No.