BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU


TAHUN 2018 (ALTERNATIF III) TAHAP I

BAB I. PERENCANAAN BANGUNAN


PELIMPAH
I.1. Penelusuran Banjir (Routing) Pelimpah
Tabel IX-1 Hubungan Elevasi, Tampungan Bendungan, dan Debit Melalui Pelimpah
Bendungan Cidanau Dengan Lebar = 25 m
Elevasi H S S/Dt Q Q/2  
(m) (m) (m3)   (m /dt)
3
  (m /dt)
3
(m /dt)
3

66.0 0.0 - 0.000 0.000 0.000 0.000 0.000


66.1 0.1 119,035.87 33.066 1.958 0.979 32.086 34.045
66.2 0.2 238,071.74 66.131 3.916 1.958 64.173 68.089
66.3 0.3 357,107.61 99.197 7.520 3.760 95.437 102.957
66.4 0.4 476,143.48 132.262 11.124 5.562 126.700 137.824
66.5 0.5 595,179.35 165.328 16.133 8.066 157.261 173.394
66.6 0.6 714,215.22 198.393 21.142 10.571 187.822 208.964
66.7 0.7 833,251.09 231.459 27.293 13.646 217.812 245.105
66.8 0.8 952,286.96 264.524 33.443 16.722 247.803 281.246
66.9 0.9 1,071,322.83 297.590 40.312 20.156 277.434 317.746
67.0 1.0 1,190,358.70 330.655 47.181 23.590 307.065 354.246
67.1 1.1 1,314,097.60 365.027 55.065 27.533 337.494 392.560
67.2 1.2 1,437,836.50 399.399 62.950 31.475 367.924 430.874
67.3 1.3 1,561,575.41 433.771 71.852 35.926 397.845 469.697
67.4 1.4 1,685,314.31 468.143 80.755 40.378 427.765 508.520
67.5 1.5 1,809,053.21 502.515 90.257 45.129 457.386 547.643
67.6 1.6 1,932,792.11 536.887 99.759 49.880 487.007 586.766
67.7 1.7 2,056,531.02 571.259 110.240 55.120 516.139 626.379
67.8 1.8 2,180,269.92 605.631 120.721 60.360 545.270 665.991
67.9 1.9 2,304,008.82 640.002 131.664 65.832 574.170 705.834
68.0 2.0 2,427,747.73 674.374 142.607 71.304 603.071 745.678
68.1 2.1 2,555,860.43 709.961 154.350 77.175 632.786 787.136
68.2 2.2 2,683,973.14 745.548 166.094 83.047 662.501 828.595
68.3 2.3 2,812,085.85 781.135 178.366 89.183 691.952 870.318
68.4 2.4 2,940,198.56 816.722 190.638 95.319 721.403 912.041
68.5 2.5 3,068,311.27 852.309 203.687 101.844 750.465 954.152
68.6 2.6 3,196,423.98 887.896 216.736 108.368 779.528 996.263
68.7 2.7 3,324,536.69 923.482 229.852 114.926 808.556 1038.409
68.8 2.8 3,452,649.40 959.069 242.969 121.484 837.585 1080.554
68.9 2.9 3,580,762.11 994.656 257.986 128.993 865.663 1123.649
69.0 3.0 3,708,874.81 1030.243 273.004 136.502 893.741 1166.745
69.1 3.1 3,841,376.27 1067.049 287.328 143.664 923.385 1210.713
69.2 3.2 3,973,877.73 1103.855 301.653 150.827 953.028 1254.681
69.3 3.3 4,106,379.18 1140.661 317.317 158.658 982.003 1299.319
69.4 3.4 4,238,880.64 1177.467 332.980 166.490 1010.977 1343.957
69.5 3.5 4,371,382.10 1214.273 348.590 174.295 1039.978 1388.568
69.6 3.6 4,503,883.55 1251.079 364.199 182.099 1068.979 1433.178
69.7 3.7 4,636,385.01 1287.885 380.919 190.459 1097.425 1478.344
69.8 3.8 4,768,886.46 1324.691 397.639 198.819 1125.871 1523.510
69.9 3.9 4,901,387.92 1361.497 415.182 207.591 1153.906 1569.088

LAPORAN AKHIR
Halaman 1
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

Elevasi H S S/Dt Q Q/2  


(m) (m) (m3)   (m /dt)
3
  (m /dt)
3
(m /dt)
3

70.0 4.0 5,033,889.38 1398.303 432.726 216.363 1181.940 1614.666


70.1 4.1 5,170,770.15 1436.325 449.801 224.901 1211.425 1661.226
70.2 4.2 5,307,650.93 1474.347 466.876 233.438 1240.909 1707.786
70.3 4.3 5,444,531.70 1512.370 485.626 242.813 1269.557 1755.183

Tabel IX-2 Penelusuran Banjir Q1000th Melalui Pelimpah


t Inflow (I1+I2)/2   H Outflow Elevasi
(jam) (m3/dt)   3
(m /dt) 3
(m /dt) (m) (m3/dt) (m)
0.0 4.744 - - - 0.000 4.744 66.000
1.0 5.147 4.946 0.000 4.946 0.015 0.284 66.015
2.0 54.297 29.722 4.661 34.384 0.101 1.978 66.101
3.0 103.308 78.803 32.406 111.209 0.324 8.373 66.324
4.0 140.720 122.014 102.836 224.850 0.644 23.846 66.644
5.0 176.656 158.688 201.004 359.692 1.014 48.302 67.014
6.0 205.544 191.100 311.390 502.491 1.384 79.372 67.384
7.0 222.654 214.099 423.118 637.217 1.727 113.108 67.727
8.0 231.481 227.067 524.109 751.177 2.013 144.165 68.013
9.0 234.663 233.072 607.012 840.084 2.228 169.473 68.228
10.0 234.183 234.423 670.611 905.035 2.383 188.578 68.383
11.0 231.262 232.723 716.457 949.180 2.488 202.146 68.488
12.0 226.703 228.983 747.033 976.016 2.552 210.462 68.552
13.0 221.074 223.889 765.554 989.443 2.584 214.622 68.584
14.0 214.825 217.949 774.820 992.770 2.592 215.653 68.592
15.0 208.397 211.611 777.116 988.727 2.582 214.401 68.582
16.0 201.789 205.093 774.327 979.420 2.560 211.517 68.560
17.0 195.246 198.518 767.903 966.421 2.529 207.489 68.529
18.0 189.021 192.134 758.932 951.066 2.493 202.731 68.493
19.0 182.886 185.954 748.335 934.289 2.453 197.532 68.453
20.0 176.855 179.870 736.756 916.627 2.411 192.059 68.411
21.0 170.962 173.909 724.567 898.476 2.367 186.648 68.367
22.0 165.244 168.103 711.828 879.931 2.323 181.194 68.323
23.0 160.025 162.634 698.737 861.372 2.279 175.735 68.279
24.0 155.100 157.563 685.637 843.200 2.235 170.390 68.235
max 2.592 215.653 68.592
Sumber: Analisa Konsultan

LAPORAN AKHIR
Halaman 2
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

Gambar IX-1 Hidrograf Penelusuran Banjir (Flood Routing) Q1000th Melalui Pelimpah

Tabel IX-3 Penelusuran Banjir QPMF Melalui Pelimpah


t Inflow (I1+I2)/2   H Outflow Elevasi
(jam) (m /dt)
3
  (m /dt)
3
(m /dt)
3
(m) (m /dt)
3
(m)
0.0 4.7440 - - - 0.000 4.744 66.000
1.0 5.1474 4.946 0.000 4.946 0.015 0.284 66.015
2.0 67.1649 36.156 4.661 40.817 0.120 2.348 66.120
3.0 128.3416 97.753 38.470 136.223 0.395 10.958 66.395
4.0 172.5763 150.459 125.265 275.724 0.785 32.503 66.785
5.0 218.4015 195.489 243.220 438.709 1.220 64.747 67.220
6.0 254.8269 236.614 373.963 610.577 1.660 106.059 67.660
7.0 277.6055 266.216 504.518 770.734 2.060 149.704 68.060
8.0 289.1731 283.389 621.030 904.419 2.382 188.396 68.382
9.0 293.0227 291.098 716.023 1007.120 2.626 220.115 68.626
10.0 292.2723 292.647 787.006 1079.653 2.798 242.689 68.798
11.0 288.4662 290.369 836.965 1127.334 2.909 259.270 68.909
12.0 282.6114 285.539 868.063 1153.602 2.970 268.424 68.970
13.0 275.4193 279.015 885.178 1164.194 2.994 272.115 68.994
14.0 267.3931 271.406 892.079 1163.485 2.992 271.868 68.992
15.0 258.8876 263.140 891.617 1154.757 2.972 268.827 68.972
16.0 250.1696 254.529 885.931 1140.459 2.939 263.844 68.939
17.0 242.0869 246.128 876.615 1122.744 2.898 257.671 68.898
18.0 234.0482 238.068 865.073 1103.140 2.852 250.840 68.852
19.0 225.5637 229.806 852.301 1082.107 2.804 243.510 68.804
20.0 217.0692 221.316 838.597 1059.913 2.751 236.545 68.751
21.0 209.0173 213.043 823.368 1036.411 2.695 229.231 68.695
22.0 201.3793 205.198 807.180 1012.379 2.638 221.751 68.638
23.0 194.1177 197.749 790.627 988.376 2.581 214.292 68.581
24.0 187.4465 190.782 774.084 964.866 2.525 207.007 68.525
Max 2.994 272.115 68.994
Sumber: Analisa Konsultan

LAPORAN AKHIR
Halaman 3
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

Gambar IX-2 Hidrograf Penelusuran Banjir (Flood Routing) QPMF Melalui Pelimpah

I.2. Analisa Hidrolika Pelimpah


Bangunan pelimpah untuk Bendungan Cidanau ini direncanakan menggunakan tipe pelimpah
samping, dengan mercu Tipe OGEE dan elevasi crest pelimpah direncanakan pada elevasi
+66.00. Untuk menentukan kapasitas Bendungan Cidanau dilakukan analisa routing
pelimpah. Dimana pelimpah direncanakan dapat melewatkan debit banjir dengan kala ulang
1000 tahun. Dari analisa didapat lebar optimum pelimpah adalah 25,00 m, debit Inflow Q1000
adalah 234,66 m3/detik, debit outflow Q1000 adalah 215,65 m3/detik. Tinggi muka air banjir
outflow Q1000 adalah 2,59 m pada elevasi +68,59, dari hasil analisa ditambahkan tinggi
jagaan sebesar 1,35 sehingga didapat elevasi +69,94, jadi elevasi puncak bendungan +70.00
aman.

Kapasitas debit pelimpah adalah debit Q1000 sebesar 215,65 m3/detik. Dengan lebar
pelimpah 25 m didapat tinggi muka air di atas pelimpah adalah 2,59 m.

Q  C . L eff . Hd3 / 2

L eff  L '  2  N .Kp  Ka  . Hd


dimana :
Q = debit (m3/detik)
C = koefisien debit
Hd = tinggi tekanan total di atas mercu pelimpah (m)
Leff = panjang efektif pelimpah (m)
L’ = panjang pelimpah (m)

LAPORAN AKHIR
Halaman 4
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

N = jumlah pilar
Kp = koefisien kontraksi pilar
Ka = koefisien kontraksi abutmen

+68,59 (hasil routing pelimpah Q1000)

Hd = 2,59 Hs
+66,00
E

P = 3,00

+63,00

+59,20

Gambar IX-3 Sketsa Aliran Di Atas Pelimpah

A. Saluran Pegarah

Saluran pengarah berfungsi mengarahkan aliran ke mercu pelimpah dengan kecepatan


rendah dan kemudian arah aliran dan kecepatannya berubah secara perlahan tanpa
menimbulkan turbulensi pada kedalaman air yang cukup. Persyaratan hidrolik pada
saluran pelimpah adalah :
P  H/5
V  4 m/dt
Dimana :
H = kedalaman air di atas mercu (m)
P = kedalaman air dibawah mercu (m)
V = kecepatan aliran pemasukan (m/dt)
Agar terbentuk aliran yang tenang dengan fluktuasi muka air kecil, maka angka Froud
disyaratkan sebagai berikut :
F  0,40
q H
F= V
g ( H  P) 3
P

Dengan :
F = angka Froude
Q = debit persatuan panjang (m3/dt)

LAPORAN AKHIR
Halaman 5
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

G = percepatan gravitasi, m/dt2 (= 9,81)

B. Perencanaan Mercu Type OGEE

Metode yang digunakan untuk menentukan tipe profil di hilir puncak ambang adalah
dengan lengkung Harrold sebagai berikut :

dengan :
H = tinggi tekanan rencana
X = jarak horizontal dari titik tertinggi mercu bendung ke titik di permukaan mercu di
sebelah hilirnya.
Y = jarak vertikal dari titik tertinggi mercu bendung ke titik di permukaan mercu di
sebelah hilirnya.

Profil di bagian hulu dapat diperoleh dengan persamaan :


X1 = 0,282 Hd
X2 = 0,175 Hd
R1 = 0,5 Hd
R2 = 0,2 Hd

Gambar IX-4 Ilustrasi Puncak Mercu

0,282 . Hd = 0,282 . 2,59 = 0,73 m

0,175 . Hd = 0,175 . 2,59 = 0,45 m; diambil 0,50 m


R1 = 0,5 . Hd = 0,5 . 2,59 = 1,30 m; diambil 1,30 m

LAPORAN AKHIR
Halaman 6
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

R2 = 0,2 . Hd = 0,2 .2,59 = 0,52 m; diambil 0,50 m

Penampang hilir pelimpah memakai persamaan lengkung Harrold :

X 1,85  2,0 . Hd 0 ,85 . Y

2.59

0.70

0.50

0.50
1.30

Gambar IX-5 Skematis Mercu Pelimpah Bendungan Cidanau

C. Profil muka air yang melalui pelimpah

Perhitungan muka air yang melalui pelimpah dapat dilakukan per pias dengan
menggunakan persamaan-persamaan berikut :
Q
 VZ . YZ
L
VZ  2 . g .  Z  Ho  YZ 
VZ
FZ 
g . YZ
Q
2 . g .  Z  Ho  YZ    0
L . YZ
dimana :
Q = debit banjir rencana (m3/detik)
L = lebar pelimpah (m)
VZ = kecepatan aliran pada titik sejauh Z (m/detik)
YZ = kedalaman air pada titik sejauh Z (m)
FZ = bilangan Froude pada titik sejauh Z.
Untuk :
Q1000 = 215,65 m3/detik
L = 25,0 m

LAPORAN AKHIR
Halaman 7
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

Tabel IX-4 Profil Muka Air Yang Melalui Pelimpah

Perhitungan Profil Muka Air Saluran Samping dengan Metode Integrasi Numeris
Penetapan Penampang Kontrol [Q1000]
Data Saluran :
Qrencana = 215.65 m3/det
So = 0.0250
Lpel = 25.00 m
z1 = 0.700
z2 = 0.700
n-Man = 0.015
B-sal_hu = 10.000 m
B-sal_hi = 12.000 m
q = 8.626 m3/det/m'

[kontrol] [dicoba]
x dx B-sal-x Qx Qhit dQ Q1+Q2 Yc Ac Tc Vc Fr v1+v2 dQ dv ym' Rc hf dy' jum_dy'

0.00 10.00
3.13 3.13 10.25 26.957 26.957 0.000 26.957 0.872 9.472 11.471 2.846 1.000 2.846 26.957 2.846 ..... 1.484 0.003 ...
6.25 3.13 10.50 53.913 53.913 0.000 80.870 1.348 15.425 12.387 3.495 1.000 6.341 26.957 0.649 1.786 2.392 0.003 1.789 1.789
9.38 3.13 10.75 80.870 80.870 0.000 134.783 1.725 20.627 13.165 3.921 1.000 7.416 26.957 0.425 1.082 3.011 0.002 1.085 2.873
12.50 3.13 11.00 107.827 107.827 0.000 188.697 2.045 25.422 13.863 4.241 1.000 8.162 26.957 0.321 0.825 3.479 0.002 0.827 3.700
15.63 3.13 11.25 134.783 134.783 0.000 242.610 2.326 29.949 14.506 4.500 1.000 8.742 26.957 0.259 0.685 3.855 0.002 0.688 4.388
18.75 3.13 11.50 161.740 161.740 0.000 296.523 2.577 34.281 15.108 4.718 1.000 9.219 26.957 0.218 0.595 4.168 0.002 0.598 4.985
21.88 3.13 11.75 188.697 188.697 0.000 350.437 2.805 38.463 15.677 4.906 1.000 9.624 26.957 0.188 0.531 4.436 0.002 0.534 5.519
25.00 3.13 12.00 215.653 215.653 0.000 404.350 3.014 42.523 16.219 5.071 1.000 9.977 26.957 0.165 0.483 4.670 0.002 0.485 6.004
Keterang an : E:\PEKERJAAN\PEKERJAAN 2018\C3\BENDUNGAN CIDANAU\LAPORAN\HIDROLOGI\hidrolikapelimpahcidanau\[hidrolika-spillw ay -Cidanau-Q1000.x ls]sketsapmf
x = Jarak titik x dari hulu saluran samping [m]
dx = Jarak antar pias [m]
B-sal-x = Lebar saluran samping pada titik x [m]
Qx = Debit pada titik x [m3/det]
Qhit = Q hasil perhitungan dari persamaan aliran kritis[m3/det]
dQ = Beda debit dari titik x2 dan x1 [m3/det]
Yc = Kedalaman kritis [m]
Ac = Luas tampang saluran kritis [m2]
Tc = Lebar permukaan saluran kritis[m]
vc = Kecepatan kritis[m/det]
ym' = penurunan muka air karena kehilangan energi akibat benturan [m]
Rc = Jari-jari hidrolis kritis [m]
hf = Kehilangan energi akibat gesekan [m]
dy' = Jumlah penurunan muka air [m]
jum_dy' = Penurunan kumulatif muka air [m]

LAPORAN AKHIR
Halaman 8
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

ANALISIS PROFIL MUKA AIR PADA SALURAN SAMPING [Q1000]


ANALISIS PROFIL MUKA AIR DARI HILIR KE HULU

Qrencana = 215.65 m3/det


So = 0.0250
Lpel = 25.00 m
z1 = 0.700
z2 = 0.700
n-Man = 0.015
B-sal_hu = 10.00 m
B-sal_hi = 12.00 m
q = 8.63 m3/det/m'
Ya = 5.142 m
Xc = 25.000 m

[dicoba] [kontrol]
x dx Zo dy' ddy' Z y B-Sal-x Ax Qx vx Q1+Q2 v1+v2 dQ dv dym' P R hf dy' F T'
Aliran Sub Kritis, perhitungan bertahap ke arah hulu

25.00 .... 58.575 0.000 - 63.717 5.142 12.00 80.204 215.653 2.689 0.796 20.312
21.88 3.13 58.653 0.187 0.000 63.981 5.328 11.75 82.479 188.697 2.288 404.350 4.977 26.957 0.401 0.186 24.758 3.331 0.001 0.187 0.770 20.287
18.75 3.13 58.731 0.148 0.000 64.207 5.476 11.50 83.964 161.740 1.926 350.437 4.214 26.957 0.362 0.147 24.869 3.376 0.001 0.148 0.746 20.211
15.63 3.13 58.809 0.118 0.000 64.403 5.594 11.25 84.839 134.783 1.589 296.523 3.515 26.957 0.338 0.118 24.907 3.406 0.000 0.118 0.723 20.094
12.50 3.13 58.888 0.093 0.000 64.575 5.687 11.00 85.204 107.827 1.266 242.610 2.854 26.957 0.323 0.093 24.885 3.424 0.000 0.093 0.700 19.943
9.38 3.13 58.966 0.071 0.000 64.725 5.759 10.75 85.124 80.870 0.950 188.697 2.216 26.957 0.315 0.071 24.809 3.431 0.000 0.071 0.678 19.762
6.25 3.13 59.044 0.051 0.000 64.854 5.810 10.50 84.634 53.913 0.637 134.783 1.587 26.957 0.313 0.051 24.684 3.429 0.000 0.051 0.656 19.552
3.13 3.13 59.122 0.031 0.000 64.963 5.841 10.25 83.752 26.957 0.322 80.870 0.959 26.957 0.315 0.031 24.510 3.417 0.000 0.031 0.633 19.314
0.00 3.13 59.200 0.010 -0.001 65.051 5.851 10.00 82.467 0.000 0.000 26.957 0.322 26.957 0.322 0.011 24.283 3.396 0.000 0.011 0.610 19.045
Keterang an : E:\PEKERJAAN\PEKERJAAN 2018\C3\BENDUNGAN CIDANAU\LAPORAN\HIDROLOGI\hidrolikapelimpahcidanau\[hidrolika-spillw ay -Cidanau-Q1000.x ls]sketsapmf
Zo = Elevasi dasar saluran pada titik x [m]
dy' [4] = nilai penurunan kedalaman aliran yang dicoba [m]
ddy' = beda antara dy' coba dengan dy' hasil hitungan [m]
Z = Elevasi muka air di saluran samping [m]
Y = Kedalaman aliran di saluran samping [m]
F = Tinggi jagaan
T' = Lebar saluran di atas jagaan

LAPORAN AKHIR
Halaman 9
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

I.3. Analisa Hidrolika Saluran Transisi


Saluran transisi merupakan saluran untuk menyesuaikan bentuk saluran dari saluran
pengarah masuk ke bentuk saluran peluncur yang segi empat. Juga merupakan saluran yang
berada di hilir dari pelimpah yang dipersiapkan untuk menstabilkan aliran sebelum masuk ke
saluran peluncur.

Pada saat air memasuki saluran pelimpah telah terjadi peredaman energi karena benturan
antar massa air akibat bergolaknya air di saluran ini, sehingga saat memasuki saluran transisi
air telah tenang. Debit desain yang dipakai dalam perencanaan ini adalah Q100 dan Q1000.

Saluran transisi direncanakan dengan panjang 30 meter dan lebar pada bagian hulu 12 m
dan di hilir 10 m. Perhitungan tinggi muka air di saluran transisi dengan memakai persamaan
Bernoulli. Saluran transisi ini direncanakan dengan kondisi awal saluran kondisi aliran sub
kritis dan akhir saluran pada kondisi aliran kritis. Selengkapnya perhitungan profil muka air di
saluran transisi dapat dilihat pada Tabel IX-5. Dari perhitungan tersebut didapat tinggi muka
air kritis sebesar 1,32 m (Q1000) dan lebar saluran menjadi menyempit dari 12 m menjadi 10
m.

I.4. Analisa Hidrolika Saluran Peluncur


Saluran peluncur merupakan saluran yang menghubungkan saluran transisi ke kolam olak.
Di saluran peluncur ini, aliran yang terjadi adalah aliran super kritis dimana bilangan Froude
yang terjadi lebih dari 1. Analisa saluran peluncur dapat dilihat pada Tabel IX-6.

LAPORAN AKHIR
Halaman 10
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

Tabel IX-5 Perhitungan Profil Muka Air di Saluran Transisi


ANALISIS PROFIL MUKA AIR PADA SALURAN TRANSISI [Q1000]
ANALISIS PROFIL MUKA AIR DARI HILIR KE HULU
Data :
Q1000 = 215.653 [m3/det]
q = 21.57 [m3/det/m']
z1 = 0.000 0.7
z2 = 0.000 0.7
n-Mann = 0.015
Zo = 58.485 m
So = 0.0030
B-sal 1 = 10.000 m
B-sal 2 = 12.000 m
L-trans = 30.00 m
Yc = 3.619 m
dicoba kontrol
X B Zo Z dH z1 z2 y A T D v Fr v^2/2g H P R R^(4/3) Sf Sf-rt dx hf he H F T'
0.000 10.00 58.485 62.104 0.000 0.000 3.619 36.192 10.000 3.619 5.959 1.000 1.810 63.914 17.238 2.100 2.688 0.003 63.914 0.976 10.000
6.000 10.40 58.503 63.092 0.000 0.140 0.140 4.589 50.669 11.685 4.336 4.256 0.653 0.923 64.015 19.667 2.576 3.532 0.001 0.002 6.000 0.012 0.08863 64.015 0.89290 11.935
12.000 10.80 58.521 63.359 0.000 0.280 0.280 4.838 58.803 13.509 4.353 3.667 0.561 0.686 64.044 20.848 2.821 3.985 0.001 0.001 6.000 0.006 0.02378 64.044 0.85810 13.990
18.000 11.20 58.539 63.522 0.000 0.420 0.420 4.983 66.244 15.386 4.305 3.255 0.501 0.540 64.063 22.010 3.010 4.345 0.001 0.001 6.000 0.004 0.01453 64.063 0.83242 16.085
24.000 11.60 58.557 63.635 0.000 0.560 0.560 5.078 73.343 17.287 4.243 2.940 0.456 0.441 64.076 23.240 3.156 4.629 0.000 0.000 6.000 0.003 0.00995 64.076 0.81216 18.197
30.000 12.00 58.575 63.717 0.000 0.700 0.700 5.142 80.204 19.198 4.178 2.689 0.420 0.368 64.085 24.552 3.267 4.847 0.000 0.000 6.000 0.002 0.00722 64.085 0.79563 20.312
Keterangan : E:\PEKERJAAN\PEKERJAAN 2018\C3\BENDUNGAN CIDANAU\LAPORAN\HIDROLOGI\PERHITUNGAN HIDROLOGI BENDUNGAN CIDANAU\[13-Spill Cute Cidanau.x ls]Gbr
X = Jarak dari titik hulu saluran transisi (titik hilir saluran samping) [m]
Zo = Elevasi dasar saluran transisi [m]
Z = Elevasi muka air pada saluran transisi [m]
z1 = Kemiringan lereng saluran 1 (sisi kiri saluran)
z2 = Kemiringan lereng saluran 2 (sisi kanan saluran)
y = Kedalaman aliran pada saluran transisi [m]
A = Luas penampang basah [m2]
P = Perimeter [m]
R = Jari-jari hidrolis [m]
Sf = Kemiringan garis energi
Sf-rt = Kemiringan garis energi rata-rata
hf = Kehilangan energi akibat gesekan [m]
he = Kehilangan energi akibat turbulensi [m]
H = Tinggi energi spesifik [m]
Z = Elevasi muka air di saluran samping [m]
Y = Kedalaman aliran di saluran samping [m]
F = Tinggi jagaan
T' = Lebar saluran di atas jagaan

LAPORAN AKHIR
Halaman 11
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

Tabel IX-6 Perhitungan Profil Muka Air di Saluran Peluncur


ANALISIS PROFIL MUKA AIR PADA SALURAN PELUNCUR [Q1000]
ANALISIS PROFIL MUKA AIR DARI HULU KE HILIR
Data :
Q1000 = 215.653 [m3/det]
q = 21.57 [m3/det/m']
z1 = 0.000
z2 = 0.000
n-Mann = 0.015
Zo = 58.485 m
So = 0.230
B-sal 1 = 10.000 m
B-sal 2 = 8.000 m
L-pelunc = 190.00 m
Yc = 3.619 m
dicoba kontrol
X B Zo Z dH z1 z2 y A T D v Fr v^2/2g H P R R^(4/3) Sf Sf-rt dx hf he H F T'
0.000 10.00 58.485 62.104 0.000 0.000 3.619 36.192 10.000 3.619 5.959 1.000 1.810 63.914 17.238 2.100 2.688 0.003 63.914 0.976 10.000
38.000 9.60 49.745 51.280 0.000 0.000 0.000 1.535 14.735 9.600 1.535 14.636 3.772 10.918 62.198 12.670 1.163 1.223 0.039 0.021 38.000 0.805 0.91083 62.198 1.28531 9.600
76.000 9.20 41.005 42.284 0.000 0.000 0.000 1.279 11.769 9.200 1.279 18.323 5.172 17.112 59.396 11.759 1.001 1.001 0.075 0.057 38.000 2.182 0.61939 59.396 1.40564 9.200
114.000 8.80 32.265 33.445 0.000 0.000 0.000 1.180 10.380 8.800 1.180 20.775 6.107 21.998 55.442 11.159 0.930 0.908 0.107 0.091 38.000 3.465 0.48859 55.442 1.48803 8.800
152.000 8.40 23.525 24.665 0.000 0.000 0.000 1.140 9.575 8.400 1.140 22.521 6.735 25.852 50.517 10.680 0.897 0.865 0.132 0.119 38.000 4.540 0.38542 50.517 1.55106 8.400
190.000 8.00 14.785 15.917 0.000 0.000 0.000 1.132 9.054 8.000 1.132 23.820 7.149 28.918 44.835 10.263 0.882 0.846 0.151 0.141 38.000 5.375 0.30663 44.835 1.60290 8.000
Keterangan : E:\PEKERJAAN\PEKERJAAN 2018\C3\BENDUNGAN CIDANAU\LAPORAN\HIDROLOGI\hidrolikapelimpahcidanau\[hidrolika-spillw ay -Cidanau-Q1000.x ls]peluncurpmf
X = Jarak dari titik hulu saluran transisi (titik hilir saluran samping) [m]
Zo = Elevasi dasar saluran transisi [m]
Z = Elevasi muka air pada saluran transisi [m]
z1 = Kemiringan lereng saluran 1 (sisi kiri saluran)
z2 = Kemiringan lereng saluran 2 (sisi kanan saluran)
y = Kedalaman aliran pada saluran transisi [m]
A = Luas penampang basah [m2]
P = Perimeter [m]
R = Jari-jari hidrolis [m]
Sf = Kemiringan garis energi
Sf-rt = Kemiringan garis energi rata-rata
hf = Kehilangan energi akibat gesekan [m]
he = Kehilangan energi akibat turbulensi [m]
H = Tinggi energi spesifik [m]
Z = Elevasi muka air di saluran samping [m]
Y = Kedalaman aliran di saluran samping [m]
F = Tinggi jagaan
T' = Lebar saluran di atas jagaan

LAPORAN AKHIR
Halaman 12
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

I.5. Analisa Hidrolika Kolam Olakan


Untuk menentukan type kolam olakan yang sesuai digunakan klasifikasi type kolam olakan
yang menjadi standar perencanaan di Indonesia. Adapun Kalisifikasi type kolam olakan ini
didasarkan pada harga bilangan Froude dan kecepatan yang terjadi, rinciannya sebagai
berikut :
a. USBR Type I : 1,7 < Fr < 2,5
b. USBR Type II : Fr > 4,5; q > 45,0 m3/detik/m; V > 18 m/detik
c. USBR Type III : Fr > 4,5; q < 18,5 m3/detik/m; V < 18 m/detik
d. USBR Type IV : 2,5 < Fr < 4,5.
Pada pelimpah Bendungan Cidanau terjadi bilangan Froude (Fr) = 7,149 dan kecepatan (V) =
21,57 m/detik, jadi kolam olakan yang digunakan adalah kolam olakan USBR Tipe III. Analisa
dapat dilakukan sebagai berikut :

Tipe USBR III


Yu Q-1000 = 1.13 m
Fru Q-1000 = 7.15

Y2/Yu = 0.5 *{(1 + 8 Fr2)0.5 - 1}


= 9.62
Yu = 1.13 ≈ 1.20 m
Y2 = 10.89 ≈ 11.00 m

2.7 Y2 = 29.40 ≈ 40.00 m


0,82 Y2 = 8.93 ≈ 10.00 m
n = 1.58 ≈ 2.00 m
n3 = 2.10 ≈ 2.20 m
0,2 n3 = 0.42 ≈ 0.50 m
0,75 n3 = 1.58 ≈ 2.00 m
Lebar pelimpah (B) direncanakan ≈ 15.00 m

Gambar IX-6 Dimensi Kolam Olak USBR Tipe III

LAPORAN AKHIR
Halaman 13
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

I.6. Data Teknis Bangunan Pelimpah


Dari hasil perhitungan-perhitungan tersebut di atas dapat digambarkan bahwa parameter dan
data-data teknis bangunan pelimpah, saluran peluncur (chute way) dan bangunan peredam
energi. Adapun data-data teknis bangunan pelimpah dari analisa empiris dapat diuraikan
sebagai berikut :
 Elevasi ambang pelimpah : + 66,00 M
 Elevasi dasar pelimpah hulu : + 63,00 M
 Elevasi dasar pelimpah hilir : + 59,20 M
 Lebar saluran pengarah : 25,00 M
 Lebar saluran transisi : 12,00 M
 Panjang saluran transisi : 30,00 M
 Kemiringan saluran sransisi : 0
 Lebar saluran peluncur : 10,00 M
 Panjang saluran peluncur : 190,00 M
 Kemiringan saluran peluncur : 0,222
 Lebar kolam olak : 15,00 m
 Panjang kolam olak : 40,00 M
 Tipe kolam olak : USBR TIPE III

LAPORAN AKHIR
Halaman 14
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

Gambar IX-7 Situasi Pelimpah dan Potongan Memanjang

LAPORAN AKHIR
Halaman 15
BBWS – CIDANAU CIUJUNG CIDURIAN DETAIL DESAIN BENDUNGAN CIDANAU
TAHUN 2018 (ALTERNATIF III) TAHAP I

LAPORAN AKHIR