KOYO
Elevator Layout Drawing
Project Name: Deproyec Lima
Elevator NO. :
KOYO ELEVATOR CO.,LTDElevator Civil Engineering Technology Requirements
ne Serator civil eeginering shuld met lertor wrk enircmetreqiremats a6 the flloing
[tow tet alse mia a5" 0-4
2h ania te iy age a fl
5 Been si of on ef ln Sgr si of ea nie dt em
{a at lw oe
‘Woche Yoon
a sel ie le i ws
1 Dt n'y bl tn ut ee so hein wie ay
Hie ct fe te it genet ete en he et ef
‘Biya peal Oey
5. eps fe eli a el a nl te
are mem se en yi ia,
Cte St ola et eu ee nr Sle el fa
rid litera
Lae de es eh ps oe es
ene alr ih exes Sew 8 eal el tn °° ly esi ie
Th eh Alt ea pil th et a a St
(Sep el Sin ede ee fv pip sl
5. usin a lyme hn i lt ly po a, ld rip a ch a mh
tie ele pe line sie oe lt ahh mi ee mt ea ite ee lr
ita elspa ote, Sr, Se et in at aoe
Sea lg ad ee
1 we id od ps ii sd alt nae Tal
ie espace ep rc el ee of ei om et
ir eed of mie en ig me let i a be ice a a lp ae oe
sige ie
rtd ee en yale a ee ee gt eae, lh i at nO ed Se end
geet ee ei Ly ces eg lige le ce ay fe a a
itr sl er ited io ao Sh
1d de a ab ei ee a
"cab artigo webs a erin bm line ad
"Stipa igre il gtd al en el i he a ei eo ore 8 ee
‘pice ingot og pee
[Aen poe lb ll 1 le gs eel er el ae
‘term rom, eal bw bye lett ely
"ee mt oe wt tat eae ne hd Be me ee a ig 8
Sale stl ticle lt ewe a he
ee Pind et We ei”
get nme ln eri rt ok em i ee et
tan
‘
4
1 eli, atl ep ed Fight hl fel ele ye sera ml be
fled ety lil oe eis mies
1 tab de acy Iie des
Tea
2 Stl tl as dat fe west all 06H eames wd
Set des oft walls i eye
ih eed
4. tag wie sn ei ne tt es se i el
Sh i sates yeti a it do ep Oi lt
lap ts toy ct et a
Se is i kin ara ie ya ne i
10 ga eet
See oy el oy lal vo tot
Sh eine pti ele, ot Ia et eet eat ct ete
5. Sat plus tana tgs nce Wh pee pla ie eee sw St
bia fest on ree tn hs Om
Wat te wt ewe in i OOK
ge ea at re GAS
a to i pt ea sang tle fen ea i:
tsa ta lg at ele wi psa cotati il Eta es aL he ei db
te! eis ef, et wht a ei th hte et
{ith te pnt be hep) ule ya & hei pS li
1 Teta ape Stl ee alah eld, a lan
st ot .
1 Se att ele pig stem ll hy ea cla te iti! eto
{uw feat heen oI eh ali Lag et
‘het tpt es wie ge
12 Teele pw te i ne ee" st AR ied
1 sai vt a xg ps ait Ow ll eats
tel ol ent este mee sah et a
Seis fe te lal wn
iat |
FUR Pit
1 ol etn dhe fe sad eth al Be a lak Hee he
tol vat tet fe
2. Stet at a eat eS eh pl ek he ep at ene ac ke ce ete
‘eee of etn fot lt i BEG, sae ll ol pl ty tat
eet poke al bolo wt ty
FIVE Landing Dar
1 i a, tel ail i
edie ett
2 Mh castor is responsible for clsiag the dor afar the elerator is installed
Machine reo crit digrn(y we]
el gl
Controller FL sr ran hg
lene so nope
Rp) bein ro
SL ates
ye
Ly),
rst LWEugen 5
Shaft Plane Layout TS
x Se
a ana tae
wel a eae
este J S ar Power
ace a
ss
a
s ens
5 raise
THU50-1.0 z
hed We
[HOYO 22:20 couShaft vertical section
K-K
Landing_door_layout
Landing_door_layout
Base floor
1
From B
vor Walt [at Basket | Sees
amp Fog:
Deproyec Line
‘asitvigozotote
eer Lo trav Ho
ter Laon braves 40
THiNNSO-.0 A
Tae [ae | Fae
IKOY
ovo AMEE co.