You are on page 1of 4
KOYO Elevator Layout Drawing Project Name: Deproyec Lima Elevator NO. : KOYO ELEVATOR CO.,LTD Elevator Civil Engineering Technology Requirements ne Serator civil eeginering shuld met lertor wrk enircmetreqiremats a6 the flloing [tow tet alse mia a5" 0-4 2h ania te iy age a fl 5 Been si of on ef ln Sgr si of ea nie dt em {a at lw oe ‘Woche Yoon a sel ie le i ws 1 Dt n'y bl tn ut ee so hein wie ay Hie ct fe te it genet ete en he et ef ‘Biya peal Oey 5. eps fe eli a el a nl te are mem se en yi ia, Cte St ola et eu ee nr Sle el fa rid litera Lae de es eh ps oe es ene alr ih exes Sew 8 eal el tn °° ly esi ie Th eh Alt ea pil th et a a St (Sep el Sin ede ee fv pip sl 5. usin a lyme hn i lt ly po a, ld rip a ch a mh tie ele pe line sie oe lt ahh mi ee mt ea ite ee lr ita elspa ote, Sr, Se et in at aoe Sea lg ad ee 1 we id od ps ii sd alt nae Tal ie espace ep rc el ee of ei om et ir eed of mie en ig me let i a be ice a a lp ae oe sige ie rtd ee en yale a ee ee gt eae, lh i at nO ed Se end geet ee ei Ly ces eg lige le ce ay fe a a itr sl er ited io ao Sh 1d de a ab ei ee a "cab artigo webs a erin bm line ad "Stipa igre il gtd al en el i he a ei eo ore 8 ee ‘pice ingot og pee [Aen poe lb ll 1 le gs eel er el ae ‘term rom, eal bw bye lett ely "ee mt oe wt tat eae ne hd Be me ee a ig 8 Sale stl ticle lt ewe a he ee Pind et We ei” get nme ln eri rt ok em i ee et tan ‘ 4 1 eli, atl ep ed Fight hl fel ele ye sera ml be fled ety lil oe eis mies 1 tab de acy Iie des Tea 2 Stl tl as dat fe west all 06H eames wd Set des oft walls i eye ih eed 4. tag wie sn ei ne tt es se i el Sh i sates yeti a it do ep Oi lt lap ts toy ct et a Se is i kin ara ie ya ne i 10 ga eet See oy el oy lal vo tot Sh eine pti ele, ot Ia et eet eat ct ete 5. Sat plus tana tgs nce Wh pee pla ie eee sw St bia fest on ree tn hs Om Wat te wt ewe in i OOK ge ea at re GAS a to i pt ea sang tle fen ea i: tsa ta lg at ele wi psa cotati il Eta es aL he ei db te! eis ef, et wht a ei th hte et {ith te pnt be hep) ule ya & hei pS li 1 Teta ape Stl ee alah eld, a lan st ot . 1 Se att ele pig stem ll hy ea cla te iti! eto {uw feat heen oI eh ali Lag et ‘het tpt es wie ge 12 Teele pw te i ne ee" st AR ied 1 sai vt a xg ps ait Ow ll eats tel ol ent este mee sah et a Seis fe te lal wn iat | FUR Pit 1 ol etn dhe fe sad eth al Be a lak Hee he tol vat tet fe 2. Stet at a eat eS eh pl ek he ep at ene ac ke ce ete ‘eee of etn fot lt i BEG, sae ll ol pl ty tat eet poke al bolo wt ty FIVE Landing Dar 1 i a, tel ail i edie ett 2 Mh castor is responsible for clsiag the dor afar the elerator is installed Machine reo crit digrn(y we] el gl Controller FL sr ran hg lene so nope Rp) bein ro SL ates ye Ly), rst LW Eugen 5 Shaft Plane Layout TS x Se a ana tae wel a eae este J S ar Power ace a ss a s ens 5 raise THU50-1.0 z hed We [HOYO 22:20 cou Shaft vertical section K-K Landing_door_layout Landing_door_layout Base floor 1 From B vor Walt [at Basket | Sees amp Fog: Deproyec Line ‘asitvigozotote eer Lo trav Ho ter Laon braves 40 THiNNSO-.0 A Tae [ae | Fae IKOY ovo AMEE co.

You might also like