You are on page 1of 2

Proforma-4

BRIDGE INVENTORY

Name of the Road :

Date of Survey :0

Clear Roadway Width between


Length of Bridge Face to Face
Span Arragement(Expansion

High Level or Submissible


joint to Expansion joint)
Year of Constructuion
Name of River Bridge
DETAILS OF

Width of Footpath(m)
Toatal Outer width of
SUPER STRUCTURE

Number of Spans

of Abutments (m)
WEARING COAT
Locatin (Km)

Clear Spans
Bridge No.

Bridge(m)
Kerbs(m)
Sl.No

Thickness (m)

Sl.No
Thickness of

Material of
Gradient

Bearing
Type of
Hanrail parapet

Type

Type
Slab
slab
Thickness & Height(m)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
16+070
1 - - 5x1.5 - - - -

24+105
2 - - 2x3.0 - - - -

3 - 36+115 - 2x3.0 - - - -

36+636
4 - - 1x5.7 - - - -

2x24.2 + 2x15 +
5 - 36+778* - 1x19.08 + - - - -
1x37.28
36+980
6 - - 8x3.0 - - - -

37+680
7 - - 3x3.0 - - - -

37+700
8 - - 2x2.5 - - - -

38+570
9 - - 10x2.75 - - - -

38+705
10 - - 2x3.0 - - - -

39+385
11 - - 8x3.0 - - - -

39+678
12 4x2.3

40+202
13 4x1.55

Client: APCO Consultant: SESPL


Proforma-4

BRIDGE INVENTORY

Abutment

Lowest Water Level(L.W.L)


SUB-STRUCTURE Pier Foundation Protection Work Present Condition of Bridge

Road Formation Level(m)


Vertical Clearance(Below
Bottom of Deck Slab)(m)
Foundation

High Flood Level(H.F.L)


skew angle(Degree)

Clear water way (m)


Direction of Flow
Thickness on Pier
Materials Used
(m)
Height of Pier &
Abutment (m)

Abutments
Approach

Bearings
Material

Material

Parapet
Type

Type

Type

Slab
Pier
Bed
Remarks
Abutment
Bottom

Pier
Top

22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 45 46 49

Open Open Minor Bridge

Open Open Minor Bridge

Open Open Minor Bridge

Raft Raft Minor Bridge

Pile Pile ROB

Raft Raft Minor Bridge

Open Open Minor Bridge

Open Open Minor Bridge

Open Open Minor Bridge

Open Open Minor Bridge

Open Open Minor Bridge

Open Open Minor Bridge

Open Open Minor Bridge

Client: APCO Consultant: SESPL

You might also like