You are on page 1of 8

Performance Criteria

1 Understand project management tools, equipment, systems,


processes and techniques

1.1 Project scope, which may include:


a) Contract or other agreement
b) Project brief
c) Project plan or summary
d) Other documents outlining expected outcomes

1.2 Stakeholders, who may include:


a) Customers – internal or external
b) Suppliers
c) Funding organizations
d) Management; employees; and relevant personnel, internal and
external, with special responsibilities
e) Project sponsor

1.3 Project parameters may include:


a) Finances for project
b) Integration of project within organization
c) Legislative and quality standards
d) Physical, human and technical resources available and/or
required for project
e) Procurement requirements associated with project
f) Reporting requirements
g) Risks associated with project
h) Scope of project
i) Timelines
1.4 Project management tools may include:
a) Cost schedule control system
b) Critical path method
c) Gantt and bar charts
d) Life cycle cost analysis
e) Logistics support analysis
f) Project management software
g) Spreadsheets
h) Technical resources required for project

2 Understand the project management conditions, requirements and


established procedures

2.1 Project Management may Include


a) Relevant specifications, such as:
i. Legislation
ii. Regulations
iii. Standards
iv. Codes of practice
v. Manufacturer’s specifications, schedules, manuals and
catalogues
vi. Policy and/or guidelines, government and/or industry

2.2 Established procedures may include:


a) Prescribed processes and measures such as:
i. Conformity notices
ii. Customer requirements and specifications
iii. Design specifications
iv. Job plans
v. Job safety analysis, risk assessment and hazardidentification
documentation
vi. Permissions to work e.g. work permits
vii. People, customers, stakeholders
viii. Documentation e.g. transport dispatches, site orders,
instructions
ix. Schedules, programs, plans
x. Standard operating procedures, encompassing formal
work instructions and/or arrangements of an organization
of how work is to be done and by whom, and including e.g.
record-keeping
PPT Materials

PPT learning materials for this What else needs to be What else can be done to
KLO can be found (mention added to improve the improve the readability and
which documents and page learning and understanding quality of powerpoint E.g
where they can be found experience for students of vocabulary, level of English
used, Grammar, Spelling etc.
this particular KLO

Unit 22. PPT 1.pptx 1.Other documents outlining 1. Ensure the headings are
Project scope.pg 4-5 expected outcomes Colored/bolded.
Project brief pg 9-10, Project
summury Pg.11,Other
documents outlining expected
outcomes
Learning Practice Materials/Activities

Learning Practice Materials for What else needs to be added What else can be done to
this KLO can be found to improve the learning and improve the readability and
(mention which documents understanding experience for quality of of the Learning
and page where they can be students in the Learning Practice materials/activities.
found) Practice Materials/Activities
for this particular KLO

1.Bus_Unit 22- Learning a) Other documents outlining


Practice KLO 1.1.docx expected outcomes
a)Project Scope. Pg 1 & 2
b) Contract Pg 2
b) Project brief 2
c) Project plan or summary
d) Other documents outlining
expected ou
Revision Booklets

The revision booklet for which What else needs to be added What else can be done to
the KLO can be found is to improve the revision improve the readability and
located. (mention which booklet for this particular KLO quality of Revision booklet. E.g
documents and page where vocabulary, level of English
they can be found) used, Grammar, Spelling etc.

Unit 22 Revision Booklet.docx


a) Project scope Pg 8
Project brief
Online Learning suitability SOW and Lesson Plan

What needs to be done to Lesson plan is clearly identifes Lesson plan has smart
make all the teaching and the KLO teaching and learning objectives that is achievable
learning resources for this KLO and there are activities to for the level of the students
suitable for online delivery. support the knowledge theory and links to the PCs/ KLO
(Please be specific to the (indicate where it can be
particuar KLO requirements) found in the document)
SOW and Lesson Plan

Lesson plan includes plenary, Lesson plan addresses Scheme of Work clearly
concept checking exericses etc differentiation covers the units and the PCs
for the knowledge aspect of
the unit
Formative and Summative Assessments

Formative Assessments is 1.Assessment Calendar for


suitable and covers. eg End of knowledge
unit quizzes, activities, word 2. Minimum of 60 questions is
bank - vocabulary etc available for all units
3. All Questions in the Question
bank has been IV'd and ready for
Summative Assessment, Mock and
Final CBT Exams