You are on page 1of 11

48’-0”

3’-0” WIDE VER

3’-0” WIDE VER


3’-0” 42’-0” 3’-0”

8’-0”x4’-0”
BATH
BED BED

8’-0” WIDE STAIR


11’-6”x12’-6” DINING 13’-0”x12’-6”
SPACE
34’-8”

KITCHEN
10’-0”x8’-0”
3’-0” WIDE VER

3’-0” WIDE VER


8’-0”x4’-0”
BATH
BED BED DRAWING
11’-6”x12’-6” 11’-3”x12’-6” 13’-0”x12’-6”

Typical floor plan


48’-0”

3’-0” WIDE VER

3’-0” WIDE VER


3’-0” 42’-0” 3’-0”

8’-0”x4’-0”
BATH
BED
BED 11’-5”x11’-0” BED

8’-0” WIDE STAIR


11’-6”x12’-6” 13’-0”x12’-6”
34’-8”

DINING SPACE
KITCHEN 16’-0”X10’-0”
10’-0”x8’-0”
3’-0” WIDE VER

3’-0” WIDE VER


8’-0”x4’-0”
BATH
BED BED DRAWING
11’-6”x12’-6” 11’-3”x12’-0” 13’-0”x12’-6”

Typical floor plan


12’-6”
8’-10”

41’-2”
11’-11” 16’-3” 13’-0”

F1C1 F3C3 F3C3 F1C1


GB1 GB2 GB1
12’-6”

GB1

GB1

GB1
GB1

F2C2 F4C4 F5C4 F3C3


GB1 GB2 GB1
33’-10”

F2C2 F4C4 F5C4 F3C3


GB1 GB2 GB1
GB1

GB1

GB1
GB1

Layout plan
GB1 GB2 GB1
F1C1 F3C3
F3C3 F1C1
RB1 RB2 RB1

RB1

RB1

RB1

RB1
3/8”dia@6” 1-3/8”dia
2-3/8”dia c/c Alt Ckd Extra Top
Extra Top

RB1 RB2 RB1


1- ½ ”dia
Extra Top

RB1 RB2 RB1


RB1

RB1

RB1

RB1
3/8”dia@4”
c/c Alt Ckd

1-3/8”dia
RB1 Extra Top
RB2 RB1

Reinforcement of roof slab


FOOTING SIZE & BAR SCHEDULE
24”

FOOTING FOOTING SIZE DEFTH SLOVE SHORT COL FOOTING BAR NO


NAME (AxB) (P) (Q) DEFTH(R) (Both Way) OF BAR
3”

F1 5’-9”x5’-9” 13” 3” 5/8 “dia@5”c/c 24


R

F2 6’-0”x6’-0” 14” 3” 5/8 “dia@5”c/c 28


AS PER
F3 6’-6”x6’-6” 15” 3” SITE 5/8 “dia@4½”c/c 36
Q

Col Size:See Column


Size & Bar Schedule
(C1,C2……..)
F4 7’-3”x7’-3” 16” 3” 5/8 “dia@4½”c/c 38
P

Ring/Tie Bar:8mm dia


@100-175-100mmc/c
F5 7’-6”x7’-6” 17” 3” 5/8 “dia@4”c/c 42
3”

PL 1½ ‘’DPC(1:1½:3)
12”

Vertical Bar: See Column COLUMN SIZE & BAR SCHEDULE


Schedule(C1,C2…)
Grade Beam:See Section COLUMN BELOW GROUND 1 ST 2ND 3RD
GL (GB1,GB2……..)
NAME GB FLOOR FLOOR FLOOR FLOOR
`
Short Col Size:
VARIFY

See Column Schedule C1 13”x13” 10”x10” 10”x10” 10”x10” 10”X10”


(C1,C2……..)

Footring Bar:See Footing 6-5/8”dia 6-5/8”dia 6-5/8”dia 6-5/8”dia 4-5/8”dia


Size & Bar Schedule
(F1,F2……) C2 13”x15” 10”x12” 10”x12” 10”x12” 10”x10”

6-5/8”dia 6-5/8”dia 6-5/8”dia 6-5/8”dia 4-5/8”dia

C3 13”x16” 10”x14” 10”x14” 10”x14” 10”x12”

8-5/8”dia 8-5/8”dia 8-5/8”dia 6-5/8”dia 4-5/8”dia

AxB
COLUMN SECTION: CORNER/SIDE COLUMN
C4 13”x16” 10”x14” 10”x14” 10”x12” 10”x12”
Y
2-½ ‘’ dia ST Top

X
2-5/8‘’ dia Extra
8mm dia@5’’ c/c
Top 2-½ ‘’ dia ST Top
ring
2-½ ‘’ dia ST Top
8mm dia @8’’ 2-5/8‘’ dia Extra
Top

Y
c/c Ring

12’’
8mm dia@5’’-8’’-
5’’ c/c ring
2-5/8‘’ dia Extra
Bottom

2-5/8‘’ dia ST
2-5/8‘’ dia ST Bottom Bottom
2-5/8‘’ dia Extra Bottom 10’ 10’’
12’-0’’/12’-7’’
Sec: Y-Y GB1 Sec:X-X

Sec: GB1
Y

2-5/8 ‘’ dia ST Top


X

2-5/8‘’ dia Extra


8mm dia@5’’ c/c
Top 2-5/8 ‘’ dia ST
ring Top
2-5/8 ‘’ dia ST Top
8mm dia @8’’ 2-5/8‘’ dia Extra
X

c/c Ring Top

15’’
8mm dia@5’’-8’’-
5’’ c/c ring
2-5/8‘’ dia Extra
Bottom
2- ¾ ‘’ dia ST Bottom 2- ¾ ‘’ dia ST
2-5/8‘’ dia Extra Bottom Bottom
14’-7”’ 10’ 10’’

Sec: GB2 Sec: Y-Y GB2 Sec:X-X


X

Y
2-½ ‘’ dia ST Top

5’’
2-5/8‘’ dia Extra
8mm dia@5’’ c/c
Top
ring
2-½ ‘’ dia ST Top
2-½ ‘’ dia ST Top

10’’
8mm dia @8’’
X

Y
c/c Ring
2-5/8‘’ dia Extra Top

8mm dia@5’’-
8’’-5’’ c/c ring
2-5/8‘’ dia Extra
Bottom
2-5/8‘’ dia ST Bottom
2-5/8‘’ dia Extra Bottom 2-5/8‘’ dia ST Bottom
10’ 10’
12’-0’’/12’-7’’
’ ’
Sec: Y-Y RB1 Sec: X-X
Sec: RB1

5’’
Y

2-5/8 ‘’ dia ST Top


X

3-5/8‘’ dia Extra


8mm dia@5’’ c/c
Top 2-5/8 ‘’ dia ST
ring Top

10’’
2-5/8 ‘’ dia ST Top 3-5/8‘’ dia
8mm dia @8’’ Extra Top
Y

c/c Ring
X

8mm dia@5’’-
8’’-5’’ c/c ring
2- ¾ ‘’ dia Extra
Bottom

4- 5/8 ‘’ dia ST
2- ¾ ‘’ dia Extra Bottom Bottom
2- ¾ ‘’ dia Extra
10” 10’
’ ’
Bottom Sec: Y-Y RB2 Sec:X-X
15’-5’’
Sec: RB2
6”
6’-0”
3/8”dia @ 4” c/c

9” 12”
10’-0”

½ ”dia @ 4” c/c
9” Top & Bottom
½ ”dia @ 4” c/c
Top & Bottom
6”

½ ”dia @ 4” c/c
3/8”dia @ 10” c/c

3/8”dia @ 8” c/c

½ ”dia @ 4” c/c 6”
1’-0”

10’-0” 4’-0”
REINFORCEMENT OF STAIR DETAILS
Design Data: Door & Window Size:

1. Assumed safe bearing capacity of sub-soil is 1.00Tsf. of depth ‘R’ Main Door:3’-4”x7’-0”
require. Bed Room Door:3’-0”x7’-0”
2. Foundation is suitable for 4(four) storied building. Ver, Bath & Kitchen door:2’-6”x7’-0”
3. Minimum compressive strength of concrete is 17.5Mpa/2500psi at Store Room Door:3’-0”x7’-0”
28days cylinder. Window Normal:4’-0”x4’-6”
4. Ordinary Portland Cement(Cem-I) be used Window KitchenRoom:3’-0”x4’-6”(min)
5. 20mm down graded picked brick chips (LAA value not exceeding Window Drawing Room:5’-0”x4’-6”(min)in
40) Window Dining Room:5’-0”x4’-6”(min)
6. Proportion 1:2:4(Cement: Sand: brick chips)
7. Sand FM:1.8=50% quantity of sand of minimum FM
1.2 and 50% quantity of coarse sand of minimum wKQz wb‡`©kbvt
FM 2.5=1:1 1| wWRvBb co‡Z cv‡i/ey‡S GBiyc
8. All floor uses Brick chips of RCC work. ivRwg¯¿x/mve-K›Uªv±i w`‡q wbg©vvY KvR
9. Minimum yield strength of MS Bar=TMT500W or min 70grade Kiyb|
10. Considering live load=200kg/sqm. 2| Kv‡Ri c~‡e© gvjvgv‡ji ¸bMZgvb cix¶v Kwi‡q
11. Clear cover for wbb|
(a) Slab:20mm(Bottom), 25mm(side), 13mm(Top) 3| e¨env‡ii c~‡e© cvwb I evwji jebv³Zv cix¶v
(b) Beam:38mm(Bottom & side), 25mm(Top). Kwi‡q wbb|
(c) Column:75mm(Below GL)& 38mm(Above GL) 4| XvjvB‡qi c~‡e© iW evBwÛs Gi KvR GKRb
(d) Lintel: 25mm AwfÁ cÖ‡KŠkjx Øviv hvPvB K‡i wbb|
(e) Grade beam:75mm(Bottom), & 50mm(Side & Top). 5| XvjvB‡qi 10N›Uv ci cvwb Øviv wbqwgZ
(f) Footing: 75mm(Bottom), & 50mm(Side). wKDwis Kiyb|
12. Design should be followed. 6| cøvb Gi †Kvb cwieZ©b n‡j wWRvBbKvixi
If there any design lack, consult with the E/C.
PROPOSED 4-STORIED RESIDENTIAL BUILDING
Owner: Md. Tuhin
Vill: Shahapur
Senbag, Noakhali.

Mobile no:01717147166
01964413161

PLAN & DRAWING CENTER


Upazila Parishad, Senbag, Noakhali
Comilla Office:
Chapapur, Adarsha Sadar, Comilla
.

fvj‡K fvj Ges g›`‡K g›` ejyb, Zvi Av‡M fvj I g›` wP‡b wbb|

cwiKwíZ I cÖhyw³MZ evwoB wbivc` I


`xN©¯’vqx
‡UKmB I `xN©¯’vqx evwo wbg©v‡bi Rb¨ civgk© wbb

^gvwUi fvienb ¶gZv(Bearing Capacity) cix¶v K‡i wbb|


^‡Lvqv ev KYvi fs¸iZv(LAA Value) hvPvB Kiæb|
^‡Lvqv ev KYvi mvBR †QvU I eo wgwkÖZ(Gradation) Ges ¾“ mvB‡Ri
g‡a¨ mxgve× wKbv|
^evwji FM:1.8-2.5 ev †gvUv `vbv h_v_© wKbv|
^wm‡g‡›U Clinker h_v_© wKbv, Cem-I ev Cem-II(A-M) K¨vUvMixi wKbv|
^BU, †Lvqv, evwj I cvwb jeY gy³ wKbv|
^†Lvqv, evwj, wm‡g›U I cvwbi wgkÖ‡Yi AbycvZ mwVK wKbv|
^i‡Wi gvb I evBwÛs mwVK bv n‡j wWRvBb †dj Ki‡Z cv‡i|
^cwic~b© wWRvBbwU cÖhyw³MZ ev Load Calculation mnKv‡i Kiv n‡q‡Q
wKbv|
Dc‡iv³ welq Ges Av‡iv wewfbœ Z_¨ ‡UKmB I `xN©¯’vqx
evwo wbg©v‡bi cwiPvqK
GBme Z_¨ Rvb‡Z I civg‡k©i Rb¨ t-
†níjvBbt 01964413161
FRONT ELEVATION

You might also like