AREA VOLUMENES CLASIFICACION

PROG. Dist. CORTE RELLENO CORTE RELLENO VOL. CORTES VOL. RELLENOS DESBROCE
m m2 m2 m3 m3 M.S R.S. R.F. PROP. PREST. TRANSP. (ML)
4+500 0.00 0.00 1.283 0.00 44.625 0.00 0.00 0.00 44.63 0.00
4+525 25.00 0.00 2.287 0.00 67.9875 0.00 0.00 0.00 67.99 25.00
4+550 25.00 0.00 3.152 0.00 100.5 0.00 0.00 0.00 100.50 25.00
4+575 25.00 0.00 4.888 0.00 128.725 0.00 0.00 0.00 128.73 25.00
4+600 25.00 0.00 5.41 0.00 130.15 0.00 0.00 0.00 130.15 25.00
4+625 25.00 0.00 5.002 0.00 132.525 0.00 0.00 0.00 132.53 25.00
4+650 25.00 0.00 5.6 0.00 145.275 0.00 0.00 0.00 145.28 25.00
4+675 25.00 0.00 6.022 0.00 152.5375 0.00 0.00 0.00 152.54 25.00
4+700 25.00 0.00 6.181 0.00 154.925 0.00 0.00 0.00 154.93 25.00
4+725 25.00 0.00 6.213 0.00 158.45 0.00 0.00 0.00 158.45 25.00
4+750 25.00 0.00 6.463 0.00 155.625 0.00 0.00 0.00 155.63 25.00
4+775 25.00 0.00 5.987 0.00 146.6875 0.00 0.00 0.00 146.69 25.00
4+800 25.00 0.00 5.748 0.00 113.875 0.00 0.00 0.00 113.88 25.00
4+825 25.00 0.00 3.362 0.00 77.9625 0.00 0.00 0.00 77.96 25.00
4+850 25.00 0.00 2.875 0.00 65.5625 0.00 0.00 0.00 65.56 25.00
4+875 25.00 0.00 2.37 0.00 77.55 0.00 0.00 0.00 77.55 25.00
4+900 25.00 0.00 3.834 0.00 108.0375 0.00 0.00 0.00 108.04 25.00
4+925 25.00 0.00 4.809 0.00 121.3125 0.00 0.00 0.00 121.31 25.00
4+950 25.00 0.00 4.896 0.00 131.65 0.00 0.00 0.00 131.65 25.00
4+975 25.00 0.00 5.636 0.00 153.8625 0.00 0.00 0.00 153.86 25.00
5+000 25.00 0.00 6.673 0.00 180.025 0.00 0.00 0.00 180.03 25.00
5+025 25.00 0.00 7.729 0.00 195.7125 0.00 0.00 0.00 195.71 25.00
5+050 25.00 0.00 7.928 0.00 192.7 0.00 0.00 0.00 192.70 25.00
5+075 25.00 0.00 7.488 0.00 171.8 0.00 0.00 0.00 171.80 25.00
5+100 25.00 0.00 6.256 0.00 150.975 0.00 0.00 0.00 150.98 25.00
5+125 25.00 0.00 5.822 0.00 150.6375 0.00 0.00 0.00 150.64 25.00
5+150 25.00 0.00 6.229 0.00 152.7875 0.00 0.00 0.00 152.79 25.00
5+175 25.00 0.00 5.994 0.00 153.0875 0.00 0.00 0.00 153.09 25.00
5+200 25.00 0.00 6.253 0.00 157.2125 0.00 0.00 0.00 157.21 25.00
5+225 25.00 0.00 6.324 0.00 154.825 0.00 0.00 0.00 154.83 25.00
5+250 25.00 0.00 6.062 0.00 149.7375 0.00 0.00 0.00 149.74 25.00
5+275 25.00 0.00 5.917 0.00 150.2 0.00 0.00 0.00 150.20 25.00
5+300 25.00 0.00 6.099 0.00 158.375 0.00 0.00 0.00 158.38 25.00
5+325 25.00 0.00 6.571 0.00 163.675 0.00 0.00 0.00 163.68 25.00
5+350 25.00 0.00 6.523 0.00 165.8625 0.00 0.00 0.00 165.86 25.00
5+375 25.00 0.00 6.746 0.00 168.8375 0.00 0.00 0.00 168.84 25.00
5+400 25.00 0.00 6.761 0.00 2626.925 0.00 0.00 0.00 2626.93 25.00
TOTAL 900.00 0.00 203.39 0.00 7611.20 0.00 0.00 0.00 7611.20 900.00
METRADO-CORTE CA
PROGRESIVAS LONG BASE MENOR ALTURA
CANAL
DEL AL (m) b H

CP-B 4500 5400 900 0.80 1.1

METRADO CORTE CAJA C


PROGRESIVAS LONG espesor € coronacion (Cc)
CANAL
DEL AL (m) (m) (m)

CP-B 4500 5400 900 0.075 0.15


ORTE CAJA CANAL
TALUD BASE AREA SECCION PARCIAL TOTAL
Z MAYOR (m2) (m3) (m3)

1 3 2.09 1881 1881

E CAJA CANAL- REFINE


TALUD BASE PERIMETRO Ac Parcial Total
Z MENOR (m) (m2) (m3) (m3)

1 0.80 4.2 0.315 283.5 283.5


METRADO JUNTAS

PROGRESIVAS LONG PERIMETRO # DE VECES Parcial


CANAL
DEL AL (m) (m) # (m3)

CP-B 4500 5400 900 4.2 361 1516.2


Total
(m3)

1516.2
HOJA RESUMEN DE METRADOS DE OBRAS DE ARTE CANAL

Excavacion en

Relleno comp.
Obras de Arte

f'c:140kg/cm2+

f'c:175kg/cm2+
de O. A. Mat.

Compuerta 0.4
f'c:175kg/cm2

f'c:210kg/cm2
Eliminacion
replanteo de

instalacion de
obras de arte
Progresiva

Enrrocado de

desencofrado

Elastomerica
Limpieza y

Suministro e
de material

Encofrado y
Tarrajeo de
excedente

Superficies
N° Veces

Protección

accesorios
desbroce

Acero de

J.W.Stop
trazos y

refuerzo

metalica
30%PM

30%PM

Baranda
Canal

Prop.

X 0.9
Junta
C°c°
C°c°

C°c°

C°c°
N° Obra de Arte

PASE PEATONAL
1 CP-B 4630 PASE PEATONAL 14.26 4.60 3.80 3.53 0.27 1.88 2.90 4.50
2 CP-B 4875 PASE PEATONAL 14.26 4.60 3.80 3.53 0.27 1.88 2.90 4.50
3 CP-B 5338 PASE PEATONAL 14.26 4.60 4.25 3.53 0.73 2.05 2.00 3.60
SALVAVIDAS
1 CP-B 4500 SALVAVIDAS 2.70 2.70 0.28 0.28 0.44 1.70
2 CP-B 4750 SALVAVIDAS 2.70 2.70 0.28 0.28 0.44 1.70
3 CP-B 5010 SALVAVIDAS 2.70 2.70 0.28 0.28 0.44 1.70
4 CP-B 5250 SALVAVIDAS 2.70 2.70 0.28 0.28 0.44 1.70
TOMA DOBLE
1 CP-B 4550 TOMA DOBLE 30.00 30.00 10.10 2.10 8.00 23.40 16.70
2 CP-B 4755 TOMA DOBLE 30.00 30.00 10.10 2.10 8.00 23.40 16.70
3 CP-B 4900 TOMA DOBLE 30.00 30.00 10.10 2.10 8.00 23.40 16.70
4 CP-B 5200 TOMA DOBLE 30.00 30.00 10.10 2.10 8.00 23.40 16.70
TOTAL 173.58 144.60 53.37 18.99 34.39 101.17 7.80 86.20
OBRA : CONSTRUCCION DE CANAL PRINCIPAL (Revestido con concreto) CP N° 01
LUGAR:
ESTRUCTURA: PASE PEATONAL PROGRESIVA: 4630

NUMERO DE MEDIDAS
PROGRESIVA ITEM DESCRIPCION PARCIAL m2 TOTAL UNIDADES
VECES LARGO ANCHO ALTURA
1 OBRAS PRELIMINARES
4630 1.1 TRAZO Y REPLANTEO 4.6 3.1 14.26 14.26 m2
4875
5338

DATOS LARGO
L 4.0 4.6
ae 0.30

ANCHO
L1 2.00 3.1
bv 0.25
0.3 0.3
PLANILLA DE METRAD
PROYECTO:CONSTRUCCION DE CANAL PRINCIPAL (Revestido con concreto) CP N° 01
ENTIDAD: PRORRIDRE
UBICACION:PUNO-AZANGARO-MUÑANI
CANAL: 0.00
PROG. : 4630

TRABAJOS PRELIMINARES

PARTIDA: LIMPIEZA DE TERRENO


Descripción
GRAFICO

Limpieza de terreno, area de trabajo

PARTIDA: TRAZO Y REPLANTEO


Descripción
GRAFICO

Trazo y replanteo de terreno, area

MOVIMIENTO DE TIERRAS

PARTIDA: EXCAVACIÓN MANUAL PARA OBRAS DE ARTE


Descripción
GRAFICO

Excavación en estribos

A1

A2
PARTIDA: RELLENO COMPACTADO
Descripción
GRAFICO

Relleno en estribos

A
2

PARTIDA: ELIMINACIÓN DE MATERIAL EXECEDENTE


CORTE MENOS RELLENO Descripción
GRAFICO

Eliminación de material

CONCRETO SIMPLE

PARTIDA: CONCRETO 175 KG/CM2+30%PM


Descripción
GRAFICO

Concreto en Estribos
CONCRETO ARMADO

PARTIDA: CONCRETO 210 KG/CM2


Descripción
GRAFICO

Concreto en la Losa
cachitos

ENCOFRADO Y DESENCOFRADO

PARTIDA: ENCOFRADO Y DESENCOFRADO


Descripción
GRAFICO

Losa
lados

Zapata
Cuerpo
Apoyos
ACERO
PARTIDA: ACERO FY=4200 KG/CM2
Descripción
GRAFICO

Acero fy=4200 kg/cm2

ENROCADO DE PROTECCIÓN
PARTIDA: ENROCADO DE PROTECCIÓN
Descripción
GRAFICO

Zona de estribos

BARANDAS

PARTIDA: BARANDAS
Descripción
GRAFICO

Barandas
LA DE METRADOS

01
ELABORADO:

FECHA: 10/19/2019

JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m

area de trabajo 4.6 3.10 14.26 14.26 m2

JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m

1 4.6 3.10 14.26 14.26 m2

JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID. H
m m m bz
t
2 4.2 A= 0.45 3.80 3.80 m3 ie
he
L1
bv

A1
A2
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m

2 4.2 A= 0.42 3.53 3.53 m3


H
bz
t
ie
he
L1
bv
Base pequeña
A1
A2
A3

JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
CORTE RELLENO
3.8 3.5 0.27 m3

JUSTIFICACION ae
Cant. Long. Ancho Altura Parcial TOTAL UNID. ac
m m m t
he
hz
bz
2 3.1 A= 0.30 1.88 1.88 m3

A3
A2
A1
A total

L1
bv
0.3
longitud
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m L
t
L1
bv

1 4.00 2.50 0.25 2.5 2.90 m3 ancho


2 4 0.25 0.2 0.4
hv

JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m

0.0 4.50 m2 L
4.00 2.50 0.25 2.5 t
2 2.0 L1
bv
hv

0 0.0
0 0.0
0 0.0
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m

0 0.00 0.00 kg

JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m

0 0.0 0.0 m3

JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m

0 0.0 0.0 m
1.1
0.6
0.25
0.1
0.6
2
0.25
0.3
0.15
0.3025
1.1
0.6
0.25
0.1
0.6
2.00
0.25
0.3
0.0605
0.105
0.3025

0.3
0.3
0.25
0.6
0
0.6

0.018
0.21
0.075
0.303

2
0.25

3.1
4
0.25
2
0.25

2.5

0.45

4
0.25
2
0.25
0.45
PLANILLA DE METRAD
PROYECTO:CONSTRUCCION DE CANAL PRINCIPAL (Revestido con concreto) CP N° 01
ENTIDAD: PRORRIDRE
UBICACION:PUNO-AZANGARO-MUÑANI
CANAL: 0.00
PROG. : 5338

TRABAJOS PRELIMINARES

PARTIDA: LIMPIEZA DE TERRENO


Descripción
GRAFICO

Limpieza de terreno, area de trabajo

PARTIDA: TRAZO Y REPLANTEO


Descripción
GRAFICO

Trazo y replanteo de terreno, area

MOVIMIENTO DE TIERRAS

PARTIDA: EXCAVACIÓN MANUAL PARA OBRAS DE ARTE


Descripción
GRAFICO

Excavación en estribos

A1

A2
PARTIDA: RELLENO COMPACTADO
Descripción
GRAFICO

Relleno en estribos

A
2

PARTIDA: ELIMINACIÓN DE MATERIAL EXECEDENTE


CORTE MENOS RELLENO Descripción
GRAFICO

Eliminación de material

CONCRETO SIMPLE

PARTIDA: CONCRETO 175 KG/CM2+30%PM


Descripción
GRAFICO

Concreto en Estribos
CONCRETO ARMADO

PARTIDA: CONCRETO 210 KG/CM2


Descripción
GRAFICO

Concreto en la Losa
cachitos

ENCOFRADO Y DESENCOFRADO

PARTIDA: ENCOFRADO Y DESENCOFRADO


Descripción
GRAFICO

Losa
lados

Zapata
Cuerpo
Apoyos

ACERO
PARTIDA: ACERO FY=4200 KG/CM2
Descripción
GRAFICO

Acero fy=4200 kg/cm2

ENROCADO DE PROTECCIÓN

PARTIDA: ENROCADO DE PROTECCIÓN


Descripción
GRAFICO

Zona de estribos

BARANDAS

PARTIDA: BARANDAS
Descripción
GRAFICO

Barandas
LA DE METRADOS

01
ELABORADO:

FECHA: 10/19/2019

JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m

area de trabajo 4.6 3.1O 4.6 4.6 m2

JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m

1 4.6 3.10 14.26 14.26 m2

JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID. H
m m m bz
t
2 4.2 A= 0.51 4.25 4.25 m3 ie
he
L1
bv

A1
A2
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m

2 4.2 A= 0.42 3.53 3.53 m3


H
bz
t
ie
he
L1
bv
Base pequeña
A1
A2
A3

JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
CORTE RELLENO
4.3 3.5 0.73 m3

JUSTIFICACION ae
Cant. Long. Ancho Altura Parcial TOTAL UNID. ac
m m m t
he
hz
bz
2 3.1 A= 0.33 2.05 2.05 m3

A3
A2
A1
A total

L1
bv
0.3
longitud
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m L
t
L1
bv

1 4.00 2.50 0.16 1.6 2.00 m3 ancho


2 4 0.25 0.2 0.4
hv

JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m

0.0 3.60 m2 L
4.00 2.50 0.16 1.6 t
2 2.0 L1
bv
hv

0 0.0
0 0.0
0 0.0
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m

0 0.00 0.00 kg

JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m

0 0.0 0.0 m3

JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m

0 0.0 0.0 m
1.1
0.6
0.16
0.1
0.6
2
0.25
0.3
0.204
0.3025
1.1
0.6
0.16
0.1
0.6
2.00
0.25
0.3
0.0605
0.132
0.3025

0.3
0.3
0.16
0.6
0
0.6

0.018
0.264
0.048
0.33

2
0.25

3.1
4
0.16
2
0.25

2.5

0.36

4
0.16
2
0.25
0.36
PLANILLA DE METRADOS-TOMA DOBLE
PROYECTO: DISEÑO DE ESTRUCTURAS HIDRÁULICAS
ENTIDAD: UNAP-FIA ELABORADO: ILAQUITA ESCALANTE GEOVANA
UBICACION: PUNO-PUNO
CANAL: CP-B FECHA: 21/102019
PROG. : 4550

TRABAJOS PRELIMINARES

PARTIDA: TRAZO Y REPLANTEO JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Limpieza de terreno, area de trabajo 2 6 A= 2.50 30.0 30.0 m2

MOVIMIENTO DE TIERRAS

PARTIDA: EXCAVACIÓN MANUAL PARA OBRAS DE ARTE JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Excavación en estribos 2 1 A= 0.2975 0.6 10.1 m3

Excavacion de la compuerta y seccion 1 5.62 1.690833333 9.5


Area1 0.06
Area2 0.2375
Area3 0.468333
Area4 0.8775
Area5 0.345

PARTIDA: RELLENO COMPACTADO JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Relleno en estribos 2 A= 1.05 2.1 2.1 m3

Area1 2.66 Altura1 2.05 5.45


Area2 0.27 Altura2 1.85 0.51
Area3 0.45 Altura3 0.35 0.16
Area4 0.75 Altura4 0.15 0.11
Area5 0.08 Altura5 0.15 0.01
Area6 0.18 Altura6 0.50 0.09
1.05

PARTIDA: ELIMINACIÓN DE MATERIAL EXECEDENTE JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m
CORTE RELLENO
Eliminación de material 1 10.1 2.10 8.0 m3

CONCRETO SIMPLE

PARTIDA: CONCRETO 175 KG/CM2+30%PM JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Concreto en lados 2 6 A= 1.05 12.6 23.4 m3

Concreto en compuerta 1 0.80 A= 2.00 0.8

Base de la Zapata 2 5 A= 1.50 10.0

L L
Area 0.8 2.5 2.00

ENCOFRADO Y DESENCOFRADO

PARTIDA: ENCOFRADO Y DESENCOFRADO JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m
PLANILLA DE METRADOS-TOMA DOBLE
PROYECTO: DISEÑO DE ESTRUCTURAS HIDRÁULICAS
ENTIDAD: UNAP-FIA ELABORADO: ILAQUITA ESCALANTE GEOVANA
UBICACION: PUNO-PUNO
CANAL: CP-B FECHA: 21/102019
PROG. : 4550

Viga Lateral 2 0.60 0.63 0.8 16.7 m2


Losa 2 7.50 0.60 9.0
lados 4 0.60 0.40 1.0

Zapata 2 2.0
Cuerpo 2 2.0
Apoyos 2 2.0

ACERO

PARTIDA: ACERO FY=4200 KG/CM2 JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Acero fy=4200 kg/cm2 2 2.00 2.00 kg

ENROCADO DE PROTECCIÓN

PARTIDA: ENROCADO DE PROTECCIÓN JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Zona de estribos 2 2.0 2.0 m3

BARANDAS

PARTIDA: BARANDAS JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Barandas 2 2.0 2.0 m


NUMERO DIAMETRO
DE ESPECIFICACIONES FORMA DE REFUERZO
PULG
PARTIDA

3234 REFUERZO LONGITUDINAL VIGA 1/2 "

REFUERZO TRANVERSAL VIGA

REFUERZO LONGITUDINAL LOZA 1/2"

REFUERZO TRANVERSAL LOZA ASR 3/8 "

RETUERTO EMPOTRAMIENTO
N DE N PIEZAS X LONGITUD X
ELEMENTOS LONGITUD POR DIAMETRO
ELEM PIEZA
IGUALES

L*2H 1/4 " 3/8 " 1/2 " 5/8 "

2 2 3.9 15.6 L
ASI
L1

2X hv
t
L1
bv
1 9.33333333 2.5 23.3333333 ancho
asp
1 RECUBRIMIENTO

1 11.3333333 2.85 32.3 ASR


4 L
T
4
1/2 "
2

0.45
0.25
2
0.25
2.5
1/2" @ 0.30
0.05

3/8" @ 0.30
3.1
0.25
PLANILLA DE METRADOS SALVAVIDAS
CANAL: CP-B
PROG. : 4500

TRABAJOS PRELIMINARES

PARTIDA: TRAZO Y REPLANTEO JUSTIFICACION


Descripción Cant.
GRAFICO
Trazo y replanteo de terreno, area de trabajo

MOVIMIENTO DE TIERRAS

PARTIDA: EXCAVACIÓN MANUAL PARA OBRAS DE ARTE JUSTIFICACION


Descripción Cant.
GRAFICO

area cuadrado 2.64375


area 1 0.605
area 2 1.80375

a2 a1

PARTIDA: RELLENO COMPACTADO JUSTIFICACION


Descripción Cant.
GRAFICO

no hay relleno

PARTIDA: ELIMINACIÓN DE MATERIAL EXECEDENTE JUSTIFICACION


CORTE MENOS RELLENO Descripción Cant.
GRAFICO

Eliminación de material

CONCRETO SIMPLE

PARTIDA: CONCRETO 175 KG/CM2 JUSTIFICACION


Descripción Cant.
GRAFICO

a1
Concreto lados 2
a3 a2
concreto escaleras 1

A1 0.06
A2 0.075
A3 0.03
0.035
a3

0.04

ENCOFRADO Y DESENCOFRADO

PARTIDA: ENCOFRADO Y DESENCOFRADO JUSTIFICACION


Descripción Cant.
GRAFICO

escaleras ver plano 6

lados 2
RADOS SALVAVIDAS
FECHA: 10/19/2019

JUSTIFICACION DATOS NECESARIOS


Long. Ancho Altura Parcial TOTAL UNID. bs 1
m m m es 0.1
reno, area de trabajo B 0.8
Lep 2.65

2.25 1.20 2.70 2.70 m2

JUSTIFICACION
Long. Ancho Altura Parcial TOTAL UNID.
m m m
Lep 2.65
1.2 A= 0.24 0.3 0.28 m3 H 1.1
e 0.075
B 0.8
n 0.2
C´p 0.2
0.4
bs 1
es 0.1

JUSTIFICACION
Long. Ancho Altura Parcial TOTAL UNID.
m m m

no hay relleno

JUSTIFICACION
Long. Ancho Altura Parcial TOTAL UNID.
m m m
CORTE RELLENO
0.3 0.00 0.30 m3

JUSTIFICACION
Long. Ancho Altura Parcial TOTAL UNID.
m m m

espesor (es) bs 1
0.1 A= 0.24 0.047 0.44 m3 es 0.1
longitud P 0.35
1 A= 0.39 0.39 Cp 0.2
n 0.2
e 0.075
0.4
Hipotenusa 0.40

JUSTIFICACION
Long. Ancho Altura Parcial TOTAL UNID.
m m m

largo n 0.2
1.00 0.20 1.2 1.7 m2 Cp 0.2
altura ultima 0.2
bs 1

A= 0.24 0.47 m2
PLANILLA DE METRADOS
PROYECTO: DISEÑO DE ESTRUCTURAS HIDRÁULICAS
ENTIDAD: PRORRIDRE ELABORADO:
UBICACION: PUNO-AZANGARO-MUÑANI
CANAL: CP FECHA: 10/19/2019
PROG. : 5098

TRABAJOS PRELIMINARES

PARTIDA: LIMPIEZA DE TERRENO JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Limpieza de terreno, area de trabajo 0.0 0.0 m2

PARTIDA: TRAZO Y REPLANTEO JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Trazo y replanteo de terreno, area de trabajo 0 0 A= 0.0 0.0 m2

MOVIMIENTO DE TIERRAS

PARTIDA: EXCAVACIÓN MANUAL PARA OBRAS DE ARTE JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Excavación en estribos 0 A= 0.0 0.0 m3

PARTIDA: RELLENO COMPACTADO JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Relleno en estribos 0 0 A= 0.0 0.0 m3

PARTIDA: ELIMINACIÓN DE MATERIAL EXECEDENTE JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Eliminación de material 0 2.54 0.0 0.0 m3

CONCRETO SIMPLE

PARTIDA: CONCRETO 175 KG/CM2+30%PM JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Concreto en Estribos 0 A= 0.0 0.0 m3

CONCRETO ARMADO

PARTIDA: CONCRETO 210 KG/CM2 JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Concreto en la Losa 0.0 m3


PLANILLA DE METRADOS
PROYECTO: DISEÑO DE ESTRUCTURAS HIDRÁULICAS
ENTIDAD: PRORRIDRE ELABORADO:
UBICACION: PUNO-AZANGARO-MUÑANI
CANAL: CP FECHA: 10/19/2019
PROG. : 5098

ENCOFRADO Y DESENCOFRADO

PARTIDA: ENCOFRADO Y DESENCOFRADO JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Viga Lateral 0 0.0 0.0 m2


Losa 0 0.0
lados 0 0.0

Zapata 0 0.0
Cuerpo 0 0.0
Apoyos 0 0.0

ACERO

PARTIDA: ACERO FY=4200 KG/CM2 JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Acero fy=4200 kg/cm2 0 0.00 0.00 kg

ENROCADO DE PROTECCIÓN

PARTIDA: ENROCADO DE PROTECCIÓN JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Zona de estribos 0 0.0 0.0 m3

BARANDAS

PARTIDA: BARANDAS JUSTIFICACION


Descripción Cant. Long. Ancho Altura Parcial TOTAL UNID.
GRAFICO m m m

Barandas 0 0.0 0.0 m


primero: trazo y replanteo
RESUMEN DE OBRADE ARTE
ITEM DESCRIPCIÓN UNIDAD METRADO
01 Trabajo provisionales
01.01 campamento mes 6
01.02 cartel de obra und 2
01.03 apertura de camino de accesos
01.04 trazo y replanteo m
02 construccion canal PB 4+500 AL 5+400
02.01 movimientos de tierras 7611.2
02.01.01 excavacion de caja canal maquinaria (trapezoidal) m3 1881
02.01.02 refine caja canal m3 283.5
02.01.03 relleno compactado (terraplen) m3 1516.2
03 construccion de obra de arte
03.01 pases peatonales
03.01.01 trabajos preliminares
03.01.01.01 limpieza y desbroce m2 13.8
03.01.01.02 trazo y replanteo m2 42.78
03.01.02 movimientos de tierras
03.01.02.01 excavacion manual para obras de arte m3 11.85
03.01.02.02 relleno compactado m3 10.59
03.01.02.03 eliminacion de material excedente m3 1.27
03.01.02.04 concreto 175 KG/CM2+30%PM m3 5.81
03.01.02.05 encofrado y desencofrado m2 12.6
03.02 salvavidas
03.02.01 trabajos preliminares
03.02.01.01 limpieza y desbroce m2 10.8
03.02.01.02 trazo y replanteo m2 10.8
03.02.02 movimientos de tierras
03.02.02.01 excavacion manual para obras de arte m3 1.12
03.02.02.02 eliminacion de material excedente m3 1.12
03.02.02.03 concreto 175 KG/CM2+30%PM m3 1.76
03.02.02.04 encofrado y desencofrado m2 6.8
03.03 toma doble
03.03.01 trabajos preliminares
03.03.01.01 limpieza y desbroce m2 120
03.03.01.02 trazo y replanteo m2 120
03.03.02 movimientos de tierras
03.03.02.01 excavacion manual para obras de arte m3 40.4
03.03.02.02 relleno compactado m3 8.4
03.03.02.03 eliminacion de material excedente m3 32
03.03.02.04 concreto 175 KG/CM2+30%PM m3 93.6
03.03.02.05 encofrado y desencofrado m2 66.8