m m2 m2 m3 m3 M.S R.S. R.F. PROP. PREST. TRANSP. (ML)
4+500 0.00 0.00 1.283 0.00 44.625 0.00 0.00 0.00 44.63 0.00
4+525 25.00 0.00 2.287 0.00 67.9875 0.00 0.00 0.00 67.99 25.00
4+550 25.00 0.00 3.152 0.00 100.5 0.00 0.00 0.00 100.50 25.00
4+575 25.00 0.00 4.888 0.00 128.725 0.00 0.00 0.00 128.73 25.00
4+600 25.00 0.00 5.41 0.00 130.15 0.00 0.00 0.00 130.15 25.00
4+625 25.00 0.00 5.002 0.00 132.525 0.00 0.00 0.00 132.53 25.00
4+650 25.00 0.00 5.6 0.00 145.275 0.00 0.00 0.00 145.28 25.00
4+675 25.00 0.00 6.022 0.00 152.5375 0.00 0.00 0.00 152.54 25.00
4+700 25.00 0.00 6.181 0.00 154.925 0.00 0.00 0.00 154.93 25.00
4+725 25.00 0.00 6.213 0.00 158.45 0.00 0.00 0.00 158.45 25.00
4+750 25.00 0.00 6.463 0.00 155.625 0.00 0.00 0.00 155.63 25.00
4+775 25.00 0.00 5.987 0.00 146.6875 0.00 0.00 0.00 146.69 25.00
4+800 25.00 0.00 5.748 0.00 113.875 0.00 0.00 0.00 113.88 25.00
4+825 25.00 0.00 3.362 0.00 77.9625 0.00 0.00 0.00 77.96 25.00
4+850 25.00 0.00 2.875 0.00 65.5625 0.00 0.00 0.00 65.56 25.00
4+875 25.00 0.00 2.37 0.00 77.55 0.00 0.00 0.00 77.55 25.00
4+900 25.00 0.00 3.834 0.00 108.0375 0.00 0.00 0.00 108.04 25.00
4+925 25.00 0.00 4.809 0.00 121.3125 0.00 0.00 0.00 121.31 25.00
4+950 25.00 0.00 4.896 0.00 131.65 0.00 0.00 0.00 131.65 25.00
4+975 25.00 0.00 5.636 0.00 153.8625 0.00 0.00 0.00 153.86 25.00
5+000 25.00 0.00 6.673 0.00 180.025 0.00 0.00 0.00 180.03 25.00
5+025 25.00 0.00 7.729 0.00 195.7125 0.00 0.00 0.00 195.71 25.00
5+050 25.00 0.00 7.928 0.00 192.7 0.00 0.00 0.00 192.70 25.00
5+075 25.00 0.00 7.488 0.00 171.8 0.00 0.00 0.00 171.80 25.00
5+100 25.00 0.00 6.256 0.00 150.975 0.00 0.00 0.00 150.98 25.00
5+125 25.00 0.00 5.822 0.00 150.6375 0.00 0.00 0.00 150.64 25.00
5+150 25.00 0.00 6.229 0.00 152.7875 0.00 0.00 0.00 152.79 25.00
5+175 25.00 0.00 5.994 0.00 153.0875 0.00 0.00 0.00 153.09 25.00
5+200 25.00 0.00 6.253 0.00 157.2125 0.00 0.00 0.00 157.21 25.00
5+225 25.00 0.00 6.324 0.00 154.825 0.00 0.00 0.00 154.83 25.00
5+250 25.00 0.00 6.062 0.00 149.7375 0.00 0.00 0.00 149.74 25.00
5+275 25.00 0.00 5.917 0.00 150.2 0.00 0.00 0.00 150.20 25.00
5+300 25.00 0.00 6.099 0.00 158.375 0.00 0.00 0.00 158.38 25.00
5+325 25.00 0.00 6.571 0.00 163.675 0.00 0.00 0.00 163.68 25.00
5+350 25.00 0.00 6.523 0.00 165.8625 0.00 0.00 0.00 165.86 25.00
5+375 25.00 0.00 6.746 0.00 168.8375 0.00 0.00 0.00 168.84 25.00
5+400 25.00 0.00 6.761 0.00 2626.925 0.00 0.00 0.00 2626.93 25.00
TOTAL 900.00 0.00 203.39 0.00 7611.20 0.00 0.00 0.00 7611.20 900.00
METRADO-CORTE CA
PROGRESIVAS LONG BASE MENOR ALTURA
CANAL
DEL AL (m) b H
1516.2
HOJA RESUMEN DE METRADOS DE OBRAS DE ARTE CANAL
Excavacion en
Relleno comp.
Obras de Arte
f'c:140kg/cm2+
f'c:175kg/cm2+
de O. A. Mat.
Compuerta 0.4
f'c:175kg/cm2
f'c:210kg/cm2
Eliminacion
replanteo de
instalacion de
obras de arte
Progresiva
Enrrocado de
desencofrado
Elastomerica
Limpieza y
Suministro e
de material
Encofrado y
Tarrajeo de
excedente
Superficies
N° Veces
Protección
accesorios
desbroce
Acero de
J.W.Stop
trazos y
refuerzo
metalica
30%PM
30%PM
Baranda
Canal
Prop.
X 0.9
Junta
C°c°
C°c°
C°c°
C°c°
N° Obra de Arte
PASE PEATONAL
1 CP-B 4630 PASE PEATONAL 14.26 4.60 3.80 3.53 0.27 1.88 2.90 4.50
2 CP-B 4875 PASE PEATONAL 14.26 4.60 3.80 3.53 0.27 1.88 2.90 4.50
3 CP-B 5338 PASE PEATONAL 14.26 4.60 4.25 3.53 0.73 2.05 2.00 3.60
SALVAVIDAS
1 CP-B 4500 SALVAVIDAS 2.70 2.70 0.28 0.28 0.44 1.70
2 CP-B 4750 SALVAVIDAS 2.70 2.70 0.28 0.28 0.44 1.70
3 CP-B 5010 SALVAVIDAS 2.70 2.70 0.28 0.28 0.44 1.70
4 CP-B 5250 SALVAVIDAS 2.70 2.70 0.28 0.28 0.44 1.70
TOMA DOBLE
1 CP-B 4550 TOMA DOBLE 30.00 30.00 10.10 2.10 8.00 23.40 16.70
2 CP-B 4755 TOMA DOBLE 30.00 30.00 10.10 2.10 8.00 23.40 16.70
3 CP-B 4900 TOMA DOBLE 30.00 30.00 10.10 2.10 8.00 23.40 16.70
4 CP-B 5200 TOMA DOBLE 30.00 30.00 10.10 2.10 8.00 23.40 16.70
TOTAL 173.58 144.60 53.37 18.99 34.39 101.17 7.80 86.20
OBRA : CONSTRUCCION DE CANAL PRINCIPAL (Revestido con concreto) CP N° 01
LUGAR:
ESTRUCTURA: PASE PEATONAL PROGRESIVA: 4630
NUMERO DE MEDIDAS
PROGRESIVA ITEM DESCRIPCION PARCIAL m2 TOTAL UNIDADES
VECES LARGO ANCHO ALTURA
1 OBRAS PRELIMINARES
4630 1.1 TRAZO Y REPLANTEO 4.6 3.1 14.26 14.26 m2
4875
5338
DATOS LARGO
L 4.0 4.6
ae 0.30
ANCHO
L1 2.00 3.1
bv 0.25
0.3 0.3
PLANILLA DE METRAD
PROYECTO:CONSTRUCCION DE CANAL PRINCIPAL (Revestido con concreto) CP N° 01
ENTIDAD: PRORRIDRE
UBICACION:PUNO-AZANGARO-MUÑANI
CANAL: 0.00
PROG. : 4630
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
Excavación en estribos
A1
A2
PARTIDA: RELLENO COMPACTADO
Descripción
GRAFICO
Relleno en estribos
A
2
Eliminación de material
CONCRETO SIMPLE
Concreto en Estribos
CONCRETO ARMADO
Concreto en la Losa
cachitos
ENCOFRADO Y DESENCOFRADO
Losa
lados
Zapata
Cuerpo
Apoyos
ACERO
PARTIDA: ACERO FY=4200 KG/CM2
Descripción
GRAFICO
ENROCADO DE PROTECCIÓN
PARTIDA: ENROCADO DE PROTECCIÓN
Descripción
GRAFICO
Zona de estribos
BARANDAS
PARTIDA: BARANDAS
Descripción
GRAFICO
Barandas
LA DE METRADOS
01
ELABORADO:
FECHA: 10/19/2019
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID. H
m m m bz
t
2 4.2 A= 0.45 3.80 3.80 m3 ie
he
L1
bv
A1
A2
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
CORTE RELLENO
3.8 3.5 0.27 m3
JUSTIFICACION ae
Cant. Long. Ancho Altura Parcial TOTAL UNID. ac
m m m t
he
hz
bz
2 3.1 A= 0.30 1.88 1.88 m3
A3
A2
A1
A total
L1
bv
0.3
longitud
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m L
t
L1
bv
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
0.0 4.50 m2 L
4.00 2.50 0.25 2.5 t
2 2.0 L1
bv
hv
0 0.0
0 0.0
0 0.0
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
0 0.00 0.00 kg
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
0 0.0 0.0 m3
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
0 0.0 0.0 m
1.1
0.6
0.25
0.1
0.6
2
0.25
0.3
0.15
0.3025
1.1
0.6
0.25
0.1
0.6
2.00
0.25
0.3
0.0605
0.105
0.3025
0.3
0.3
0.25
0.6
0
0.6
0.018
0.21
0.075
0.303
2
0.25
3.1
4
0.25
2
0.25
2.5
0.45
4
0.25
2
0.25
0.45
PLANILLA DE METRAD
PROYECTO:CONSTRUCCION DE CANAL PRINCIPAL (Revestido con concreto) CP N° 01
ENTIDAD: PRORRIDRE
UBICACION:PUNO-AZANGARO-MUÑANI
CANAL: 0.00
PROG. : 5338
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
Excavación en estribos
A1
A2
PARTIDA: RELLENO COMPACTADO
Descripción
GRAFICO
Relleno en estribos
A
2
Eliminación de material
CONCRETO SIMPLE
Concreto en Estribos
CONCRETO ARMADO
Concreto en la Losa
cachitos
ENCOFRADO Y DESENCOFRADO
Losa
lados
Zapata
Cuerpo
Apoyos
ACERO
PARTIDA: ACERO FY=4200 KG/CM2
Descripción
GRAFICO
ENROCADO DE PROTECCIÓN
Zona de estribos
BARANDAS
PARTIDA: BARANDAS
Descripción
GRAFICO
Barandas
LA DE METRADOS
01
ELABORADO:
FECHA: 10/19/2019
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID. H
m m m bz
t
2 4.2 A= 0.51 4.25 4.25 m3 ie
he
L1
bv
A1
A2
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
CORTE RELLENO
4.3 3.5 0.73 m3
JUSTIFICACION ae
Cant. Long. Ancho Altura Parcial TOTAL UNID. ac
m m m t
he
hz
bz
2 3.1 A= 0.33 2.05 2.05 m3
A3
A2
A1
A total
L1
bv
0.3
longitud
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m L
t
L1
bv
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
0.0 3.60 m2 L
4.00 2.50 0.16 1.6 t
2 2.0 L1
bv
hv
0 0.0
0 0.0
0 0.0
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
0 0.00 0.00 kg
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
0 0.0 0.0 m3
JUSTIFICACION
Cant. Long. Ancho Altura Parcial TOTAL UNID.
m m m
0 0.0 0.0 m
1.1
0.6
0.16
0.1
0.6
2
0.25
0.3
0.204
0.3025
1.1
0.6
0.16
0.1
0.6
2.00
0.25
0.3
0.0605
0.132
0.3025
0.3
0.3
0.16
0.6
0
0.6
0.018
0.264
0.048
0.33
2
0.25
3.1
4
0.16
2
0.25
2.5
0.36
4
0.16
2
0.25
0.36
PLANILLA DE METRADOS-TOMA DOBLE
PROYECTO: DISEÑO DE ESTRUCTURAS HIDRÁULICAS
ENTIDAD: UNAP-FIA ELABORADO: ILAQUITA ESCALANTE GEOVANA
UBICACION: PUNO-PUNO
CANAL: CP-B FECHA: 21/102019
PROG. : 4550
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
L L
Area 0.8 2.5 2.00
ENCOFRADO Y DESENCOFRADO
Zapata 2 2.0
Cuerpo 2 2.0
Apoyos 2 2.0
ACERO
ENROCADO DE PROTECCIÓN
BARANDAS
RETUERTO EMPOTRAMIENTO
N DE N PIEZAS X LONGITUD X
ELEMENTOS LONGITUD POR DIAMETRO
ELEM PIEZA
IGUALES
2 2 3.9 15.6 L
ASI
L1
2X hv
t
L1
bv
1 9.33333333 2.5 23.3333333 ancho
asp
1 RECUBRIMIENTO
0.45
0.25
2
0.25
2.5
1/2" @ 0.30
0.05
3/8" @ 0.30
3.1
0.25
PLANILLA DE METRADOS SALVAVIDAS
CANAL: CP-B
PROG. : 4500
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
a2 a1
no hay relleno
Eliminación de material
CONCRETO SIMPLE
a1
Concreto lados 2
a3 a2
concreto escaleras 1
A1 0.06
A2 0.075
A3 0.03
0.035
a3
0.04
ENCOFRADO Y DESENCOFRADO
lados 2
RADOS SALVAVIDAS
FECHA: 10/19/2019
JUSTIFICACION
Long. Ancho Altura Parcial TOTAL UNID.
m m m
Lep 2.65
1.2 A= 0.24 0.3 0.28 m3 H 1.1
e 0.075
B 0.8
n 0.2
C´p 0.2
0.4
bs 1
es 0.1
JUSTIFICACION
Long. Ancho Altura Parcial TOTAL UNID.
m m m
no hay relleno
JUSTIFICACION
Long. Ancho Altura Parcial TOTAL UNID.
m m m
CORTE RELLENO
0.3 0.00 0.30 m3
JUSTIFICACION
Long. Ancho Altura Parcial TOTAL UNID.
m m m
espesor (es) bs 1
0.1 A= 0.24 0.047 0.44 m3 es 0.1
longitud P 0.35
1 A= 0.39 0.39 Cp 0.2
n 0.2
e 0.075
0.4
Hipotenusa 0.40
JUSTIFICACION
Long. Ancho Altura Parcial TOTAL UNID.
m m m
largo n 0.2
1.00 0.20 1.2 1.7 m2 Cp 0.2
altura ultima 0.2
bs 1
A= 0.24 0.47 m2
PLANILLA DE METRADOS
PROYECTO: DISEÑO DE ESTRUCTURAS HIDRÁULICAS
ENTIDAD: PRORRIDRE ELABORADO:
UBICACION: PUNO-AZANGARO-MUÑANI
CANAL: CP FECHA: 10/19/2019
PROG. : 5098
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO
Zapata 0 0.0
Cuerpo 0 0.0
Apoyos 0 0.0
ACERO
ENROCADO DE PROTECCIÓN
BARANDAS