MATERIAL COST ESTIMATES

ITEM UNIT
NO. ITEM DESCRIPTION UNIT QUANTITY COST AMOUNT

1.0 SITEWORKS
1.1 LAYOUTING AND STAKING PCS 372.00 340.00 126,480
1.2 GRAVEL BEDDING BAGS 169.00 1,800.00 304,200.00
Sub-Total 1.1 430,680.00
2.0 CONCRETING WORKS
2.1 FORMWORKS
Footing 37,000.00
Column 575,640.00
Beams 904,620.00
Walls 1,014,280.00
2.2 REBARS WORKS

Column 998,260.00
Beams 1,166,765.00
Roof 1,000,000.00
2.3 CAST-IN-PLACE CONCRETE
Foundation 10,066,665.00
Wall Footing 2,854,325.00
Column 1,577,940.00
Beams 2,820,725.00
Slabs 10,066,665.00
Sub-Total 2.0 33,082,885.00
3.0 MASONRY WORKS
3.1
3.2 1" PLASTERING 301,130.00
SUBTOTAL 3.0 301,130.00

GRAND TOTAL P 33,814,695.00

PREPARED BY: BALVERDE, DIZON, LERMA, PARZUELO, PIGIAMAN.NOTED BY :