You are on page 1of 1

System

 '  qs,k
Soil Designation
[kN/m³] [kN/m³] [°] [MN/m²]
20.0 10.0 27.0 0.115 A2b

Basis for calculation Pull-out radius limited to: 2.60 m


Bored pile as Tension pile  (P) = 1.40
Pile shaft diameter = 0.30 m  (G) = 1.35
GW = 0.00 0.00
Pile toe diameter = 0.30 m  (Q) = 1.50
0.5 Groundwater = 0.00 m Variable load component = 50.0 %
1.5
Anpassungsfaktor  = 0.80 Allow. V
 (Aufbruchkegel) = 0.90 Heave
2.5 Pile resistance R k [MN]
3.5
0.0 0.2 0.4 0.6 0.8 1.0 1.2
4.5 0.49
L = 5.00 m 0.0 0.0 0.9 0.9
5.5
L = 6.00 m
6.5
L = 7.00 m 0.2 0.2
7.5
L = 8.00 m
8.5 0.8 0.8
L = 9.00 m 0.4 0.4
9.5
L = 10.00 m
10.5
L = 11.00 m 0.6 0.6
11.5 0.64
12.5 0.7 0.7
0.8 0.8
13.5

14.5
1.0 1.0
15.5
0.6 0.6
16.5
1.2 1.2

1.4 1.4
Pile heave s [cm]

0.5 0.5

Allow. V [MN]
D(shaft) D(toe) Length G R 1k R 2k Allow. V Heave
[m] [m] [m] [MN] [MN] [MN] [MN] [cm]
1.6 1.6

0.30 0.30 5.00 0.286 0.542 0.272 0.272 0.50 0.6 cm


1.8 1.8
0.4 0.4

0.30 0.30 6.00 0.434 0.650 0.326 0.326 0.54 2.0 2.0

2.2 2.2
0.30 0.30 7.00 0.583 0.759 0.380 0.380 0.57 0.3 0.3

2.4 2.4
0.30 0.30 8.00 0.733 0.867 0.435 0.435 0.61
0.4 cm
2.6 2.6 0.2 0.2

0.30 0.30 9.00 0.883 0.975 0.489 0.489 0.64


2.8 2.8

0.2 cm
0.30 0.30 10.00 1.034 1.084 0.543 0.543 0.68 3.0 3.0 0.1 0.1

3.2 3.2
0.30 0.30 11.00 1.185 1.192 0.598 0.598 0.71 Rk

3.4 3.4 0.0 0.0


Allow. V = R1k / ( P * (G,Q)) = R 1k / (1.40 * 1.43) = R 1k / 1.99 3.9 4.9 5.9 6.9 7.9 8.9 9.9 10.9 11.9
Ratio of variable(Q)/total loads(G+Q) [-] = 0.50 Resistance-heave line
Pile length [m]
For pile length = 9.00 m