Professional Documents
Culture Documents
Quah, L.K. (1988), “An evaluation of the risks in estimating and tendering for refurbishment
work”, PhD thesis, Herriot Watt University, Edinburgh.Rahmat, I., Torrance, V.B. and
Ezanee, A.H. (2003), Refurbishment cycles and the management of refurbishment
projects, UiTM Research Centre, Shah Alam, Selangor, Malaysia.
Aikivuori, A., (1996) Periods and demand for private sector housing refurbishment, Journal of
Construction Management andEconomics14, 3-12
Rahmat, I., Torrance, V.B. and Ezanee, A.H. (2003), Refurbishment cycles and the management of
refurbishment projects, UiTM Research Centre, Shah Alam, Selangor, Malaysia.
McKim Robert, Tarek Hegazy and Mohamed Attalla, (2000), Project Performance Control In
Reconstruction Project, Journal of Construction Engineering and Management Vol. 126,
No. 2, 137-141
Egbu, C.O. (1994), “Management education and training for refurbishment work within the construction
industry”, PhD thesis, Department of Civil Engineering, University of Salford, Salford.
https://www.greenmatch.co.uk/blog/2014/08/5-advantages-and-5-disadvantages-of-solar-energy
Douglas, J. (2006). Building adaptation: Routledge.
https://nexus-net.info/a-few-tips-in-fiber-optic-maintenance/
https://www.hubinternational.com/-/media/HUB-International/Industries/Real-Estate-
Insurance/Building-Envelope-Inspection-Checklist.pdf
https://electricenergyonline.com/energy/magazine/1165/article/The-Importance-of-5G-for-Utilities.htm