You are on page 1of 1

JURUSAN TEKNIK SIPIL

FAKULTAS TEKNIK
UNIVERSITAS 17 AGUSTUS 1945 SEMARANG

JUDUL TUGAS AKHIR

DETAIL P PERENCANAAN
SKALA 1 : 10 HOTEL DI JALAN PENGAPON KELURAHAN REJOMULYO
KECAMATAN SEMARANG TIMUR

Nok Beton
DOSEN PEMBIMBING I
Genteng Beton Genteng Beton

Gording C 150.75.20.4,5 Gording C 150.75.20.4,5

2,0 2,0 2,0 2,0 2,0 2,0 2,0 2,0 Treck Stang Treck Stang

DENAH KUDA-KUDA (KT / Kuda-kuda Penuh) DETAIL M Baut


1
2" 1
Baut 2"
SKALA 1 : 10

Genteng Beton

.75
.10 Plat 8 mm Ir. ARIS KRISDIYANTO, MT.
75 Pro
fil fil
Pro Profil 75.75.8 Profil 75.75.10

Treck Stang
75
.75
.10 DOSEN PEMBIMBING II
Profil 120.120.15

Gording C 150.75.20.4,5

Profil 75.75.10
1
Baut 2"

Profil 120.120.15

DETAIL L 40
40
40

Plat 8 mm
SKALA 1 : 10 40

20
20
20

40
40
40
40
40

Genteng Beton .10


.75
75
fil
Pro

Profil 75.75.10
Ir. KEMMALA DEWI, MT.
Treck Stang

Profil 120.120.15
Profil 75.75.10 Profil 75.75.10 DI GAMBAR OLEH
Gording C 150.75.20.4,5

1
Baut 2" Profil 75.75.10
Profil 75.75.10

Profil 120.120.15
Plat 8 mm

Profil 75.75.10 Profil 75.75.10 Profil 120.120.15

.10 Profil 120.120.15 Profil 75.75.10


.75
75
Genteng Beton fil
Pro

Profil 120.120.15

Profil 120.120.15 Profil 75.75.10


YUSRIL HARDIAN
Treck Stang
161003222010418
Profil 75.75.10 Baut 0,6"

1
Profil 75.75.10 Profil 120.120.15
Baut 0,6" Baut
1
2" Baut 0,6"
Baut
1
2"
JUDUL GAMBAR
Baut 2"

Profil
180.180.20 Plat 8 mm
Plat 8 mm Plat 8 mm Profil 180.180.20 Plat 8 mm Profil 180.180.20 Profil 180.180.20

Gording C 150.75.20.4,5

Baut 1" Profil 180.180.20 Baut 1"


Profil 180.180.20
40

Baut
40

1" Profil 180.180.20 Baut 1" Profil 180.180.20


Kuda - Kuda
DETAIL A DETAIL C DETAIL D DETAIL G
SKALA 1 : 10 SKALA 1 : 10 SKALA 1 : 10 SKALA 1 : 10

CATATAN

DETAIL KUDA-KUDA (K / Kuda-kuda Penuh)

SKALA

Skala
1:10

You might also like