Select 03-SD-1V on ‘Manual’. Close TP-301B ETV and decrease speed to zero, do not operate governor as it is adjusted for TP- 301B full load speed. Isolate TP-301B from HS/LS sides and open drains to depressurize 03-SD-1V circuit (ensure no passing in I/V) After isolation/depressurization, handover 03-SD-1V for valve removal and installation of spool in its place. After installation of spool, carryout TP-301B heating from LS and HS sides u/s of ETV and remove any condensate, Gradually full open HS steam inlet block valve (u/s of 03-SD-1V), keep ETV in closed condition. Crack open ETV to put TP-301B on rolling and adjust speed ~1500rpm. In case of I-10A or any emergency requirement of TP-301B operation, immediately open ETV to achieve full load speed (~6000 rpm). Dedicated area operator to remain stationed at TP-301B till availability of 03-SD-1V.