8 Critical Electrical Rules - SPEED TIP

Electricity Kills - Think Before You Act


Subcontractor Management Portable Electrical Tools and Cords Electrical Protective Device
Ensure that electrical tools and equipment used by subcontractors are Always inspect power tools and cords before each use All permanent and temporary electrical equipment shall be
in safe working order (i.e tools are inspected, tagged, color coded) Portable electrical tools should be inspected daily, visually and protected; We shall not rely on the main contractor/client protective
Assess subcontractor’s employees knowledge on electricity, train regularly by PAT/Testing Device. Apply tagging and color coding devices, but we shall use our own electrical protective devices
them on general hazards, risks and needed controls. accordingly. Devices: commonly known as residual current devices (RCDs) or
Employees assigned for mechanical installation shall not do electrical work. Report any faults on tools and take out of use immediately & label the sensitive current operated earth leakage circuit breakers (ELCBs).
defective tools with a ‘Do Not Operate/Use’ tag. Mechanism: current-operated and interrupt the supply in the event of a
Always disconnect tools when not in use, or when servicing & never small leak of current to earth, by means of automatic circuit breakers.
carry a tool by the cord or hose & keep cord away from heat, oil, and The type of RCD usually used on part of a distribution system will
sharp edges. function on an earth leakage current of 30 milliamps (mA) and trip the
circuit in not more than 30 milliseconds (ms).

Energy Control Program Double Insulation Training and Qualifications


Live working is not allowed Always ensure that tools and cords are double insulated All employees shall be trained on general electrical hazards/risks and
If equipment has a metal enclosure, precautions must be taken to controls
Apply LOTO procedure on each dangerous task/equipment identified.
prevent the metalwork from becoming live. All electrical works must be done only by trained and competent
Provide employees and subcontractors with LOTO equipment and train
This can be achieved by double insulation in which the live parts of technicians (i.e technician with electrical experience/knowledge/
them to use correctly & verify energy state to be zero prior to work.
the equipment are covered by two layers of insulating material. qualification) and be under appropriate supervision.
• Ensure that LOTO is personnel tool
Each layer is capable of adequately insulating the live parts alone, The inspection and maintenance of electrical appliances and do not
• Train the team where to apply and how to use multimeter break word should be carried out only by a competent person.
but together they ensure that the occurrence of insulation failure and
• Remove conductive accessories before work its associated danger is extremely improbable.

Inspection of electrical safety devices Personal Protective Equipment


If electrical protective device was assembled locally, it must be
tested by competent person before initial use
Always wear the personnel protective equipment
Provide employees and subcontractor’s employees with suitable PPE
“No job is so important or urgent
Every RCD/ELCB/GFCI shall have a test button, which should be
regularly checked to ensure correct operation.
and train them to use as and when required (e.g.: insulated gloves,
helmets and goggles, insulated screens, mats, etc) that it cannot be done in a safe way”
It is important to note that ELCBs only operate when a fault to earth
occurs and they do not provide overload protection.
It shall be regularly checked and the same has to be recorded. Remember! The first wrong touch could be the last!