Professional Documents
Culture Documents
Concession Request For GVC 40A3
Concession Request For GVC 40A3
☐ Concession (CON)
☐ Deviation Permit (DP)
CON/DP/PIR Coordinator: Vendor Code or Plant Code / Dept: Related notification №’s.
Sandip Thakare 700000456
Tel:
+91 8454940312 Vendor or Plant / Dept name: PTC Industries Ltd Reference №
Fax:
Contact name:Shubham Verma Date CON/DP issued:
E-mail: 23.02.2021
sandip.thakare@km.kongsber Tel: +91 9076600635
g.com Order №
Fax: KO0136298/ DT 06.03.2020
E-mail: shubham@ptcil.com
Part № RRM900000073 Vendor Part No. Serial / Batch No. Quantity
20BRV-1 01 No
Process № Description: Site specific reference:
GVC 40A3
☐ Concession (CON)
☐ Deviation Permit (DP)
CON/DP/PIR Coordinator: Vendor Code or Plant Code / Dept: Related notification №’s.
Sandip Thakare 700000456
Tel:
+91 8454940312 Vendor or Plant / Dept name: PTC Industries Ltd Reference №
Fax:
Contact name:Shubham Verma Date CON/DP issued:
E-mail: 23.02.2021
sandip.thakare@km.kongsber Tel: +91 9076600635
g.com
Fax:
E-mail: shubham@ptcil.com
Accepted
Estimated cost of repair:
To be repaired by customer
Comment:
Date: Signature:
Design Non-Conformance Authority
acceptance
Supplier is also requested to answer the Problem Improvement Request in order to describe the measures taken in order to
eliminate the cause for this non-conformity. The non-conformity will not be closed until both documents have been received.
If 48 hrs Containment Check Sheet has been issued this needs to be prioritized.