You are on page 1of 7

Project TAIFA INDUSTRIAL PARK ,SUBANG

Date : 29 Juli 2020


Location : SUB GRADE JALAN Done by :-
Koordinat X= 809567 M Remarks : NO.01
Y= 9278948 M

Maximum Dry Density 500


95 % MDD
Optimum Moisture Content 500

No. Of Blows / Layer


400
Wt.Mould + Sample
Wt.Mould 400
Wt Sample
Volume of Sample
Water Content
300
Dry Density
(LBS)

300
LOAD (LBS)

Penetration Dial Reading Load


LOAD

(Inch) mm (Inch)
0.000 0.000 0.0000 0 0.00 200
0.2500 0.3180 0.0125 8 89.12 200
0.5000 0.6350 0.0250 12 133.68
1.0000 1.2700 0.0500 24 267.36
1.5000 1.9050 0.0750 29 323.06
2.0000 2.5400 0.1000 34 378.76 100
100
3.0000 3.8100 0.1500 42 467.88
4.0000 5.0800 0.2000 48 534.72
6.0000 7.6200 0.3000
8.0000 10.1600 0.4000
0
10.0000 12.7000 0.500 0.00 1.00 2.00 3.00 4.00 5.00
PENETRATION (INCH)
CBR Value
0,1 " 0.2"
12.63 11.88
Subang,19 Augustus 2020
Juangan lupa angka kalibrasi Proving Ring
Kalibrasi 11.14
Untuk yg 10000 lbs Kalibrasinya: 49.45
Untuk yg 2000 lbs Kalibrasinya: 11.14
Project TAIFA INDUSTRIAL PARK ,SUBANG
Date : 29 Juli 2020
Location : SUB GRADE JALAN Done by :-
Koordinat X= 809567 M Remarks : NO.02
Y= 9278948 M

Maximum Dry Density 500


95 % MDD
Optimum Moisture Content 500

No. Of Blows / Layer


400
Wt.Mould + Sample
Wt.Mould 400
Wt Sample
Volume of Sample
Water Content
300
Dry Density
(LBS)

300
LOAD (LBS)

Penetration Dial Reading Load


LOAD

(Inch) mm (Inch)
0.000 0.000 0.0000 0 0.00 200
0.2500 0.3180 0.0125 9.0000 100.29 200
0.5000 0.6350 0.0250 12.0000 133.72
1.0000 1.2700 0.0500 21.0000 234.01
1.5000 1.9050 0.0750 29.0000 323.15
2.0000 2.5400 0.1000 35.0000 390.01 100
100
3.0000 3.8100 0.1500 43.0000 479.16
4.0000 5.0800 0.2000 48.0000 534.87
6.0000 7.6200 0.3000
8.0000 10.1600 0.4000
0
10.0000 12.7000 0.500 0.00 2.00 4.00
PENETRATION (INCH)
CBR Value
0,1 " 0.2"
13.00 11.89
Subang,19 Augustus 2020
Juangan lupa angka kalibrasi Proving Ring
Kalibrasi 11.14
Untuk yg 10000 lbs Kalibrasinya:49.45
Untuk yg 2000 lbs Kalibrasinya:11.14
Project TAIFA INDUSTRIAL PARK ,SUBANG
Date : 29 Juli 2020
Location : SUB GRADE JALAN Done by :-
Koordinat X= 809689 M Remarks : NO.03
Y= 9278909 M

Maximum Dry Density 500


95 % MDD
Optimum Moisture Content 500

No. Of Blows / Layer


400
Wt.Mould + Sample
Wt.Mould 400
Wt Sample
Volume of Sample
Water Content
300
Dry Density
(LBS)

300
LOAD (LBS)

Penetration Dial Reading Load


LOAD

(Inch) mm (Inch)
0.000 0.000 0.0000 0 0.00 200
0.2500 0.3180 0.0125 11.00 122.54 200
0.5000 0.6350 0.0250 17.00 189.38
1.0000 1.2700 0.0500 27.00 300.78
1.5000 1.9050 0.0750 32.00 356.48
2.0000 2.5400 0.1000 36.00 401.04 100
100
3.0000 3.8100 0.1500 45.00 501.30
4.0000 5.0800 0.2000 52.00 579.28
6.0000 7.6200 0.3000
8.0000 10.1600 0.4000
0
10.0000 12.7000 0.500 0.00 1.00 2.00 3.00 4.00 5.00
PENETRATION (INCH)
CBR Value
0,1 " 0.2"
13.37 12.87
Subang,19 Augustus 2020
Juangan lupa angka kalibrasi Proving Ring
Kalibrasi 11.14
Untuk yg 10000 lbs Kalibrasinya: 49.45
Untuk yg 2000 lbs Kalibrasinya: 11.14
Project TAIFA INDUSTRIAL PARK ,SUBANG
Date : 29 Juli 2020
Location : SUB BASE JALAN Done by :-
Koordinat X= 809689 M Remarks : NO.04
Y= 9278909 M

Maximum Dry Density 2700


500
95 % MDD 2600
2500
Optimum Moisture Content
2400
2300
No. Of Blows / Layer 2200
400
Wt.Mould + Sample 2100
Wt.Mould 2000
Wt Sample 1900
Volume of Sample
1800
1700
Water Content
300
1600
Dry Density
1500
(LBS)
LOAD (LBS)

1400
Penetration Dial Reading Load 1300
LOAD

(Inch) mm (Inch) 1200


0.000 0.000 0.0000 0 0.00 1100
200
1000
0.2500 0.3180 0.0125 5.00 247.25
900
0.5000 0.6350 0.0250 12.00 593.40
800
1.0000 1.2700 0.0500 24.00 1186.80
700
1.5000 1.9050 0.0750 30.00 1483.50 600
2.0000 2.5400 0.1000 33.00 1631.85 100
500
3.0000 3.8100 0.1500 43.00 2126.35 400
4.0000 5.0800 0.2000 53.00 2620.85 300
200
6.0000 7.6200 0.3000
100
8.0000 10.1600 0.4000
0
10.0000 12.7000 0.500 0.00 1.00 2.00 3.00 4.00 5.00
PENETRATION (INCH)
CBR Value
0,1 " 0.2"
54.40 58.24
Subang,19 Augustus 2020
Juangan lupa angka kalibrasi Proving Ring
Kalibrasi 49.45
Untuk yg 10000 lbs Kalibrasinya: 49.45
Untuk yg 2000 lbs Kalibrasinya: 11.14
Project TAIFA INDUSTRIAL PARK ,SUBANG Date : 29 Juli 2020
Location : SUB GRADE JALAN Done by :-
Koordinat X= 809799.4 M Remarks : NO.05
Y= 9278873 M

Maximum Dry Density


95 % MDD
Optimum Moisture Content
500

No. Of Blows / Layer


Wt.Mould + Sample
Wt.Mould
Wt Sample 400

Volume of Sample
Water Content
Dry Density
LOAD (LBS)

300
Penetration Dial Reading Load
(Inch) mm (Inch)
0.000 0.000 0.000 0 0.00
0.2500 0.3180 0.0125 5 55.72
200
0.5000 0.6350 0.025 11 122.58
1.0000 1.2700 0.050 20 222.86
1.5000 1.9050 0.075 26 289.72
2.0000 2.5400 0.100 29 323.15
100
3.0000 3.8100 0.150 32 356.58
4.0000 5.0800 0.200 37 412.30
6.0000 7.6200 0.300
8.0000 10.1600 0.400
10.0000 12.7000 0.500 0
0.00 1.00 2.00 3.00 4.00 5.00
PENETRATION (INCH)
CBR Value
0,1 " 0.2"
10.77 9.16
Subang,19 Augustus 2020

Juangan lupa angka kalibrasi Proving Ring


Kalibrasi 11.14
Untuk yg 10000 lbsKalibrasinya: 49.45
Untuk yg 2000 lbsKalibrasinya: 11.14
Project TAIFA INDUSTRIAL PARK ,SUBANG Date : 29 Juli 2020
Location : SUB GRADE JALAN Done by :-
Koordinat X= 809808.6 M Remarks : NO.06
Y= 9278870 M

Maximum Dry Density


95 % MDD
500
Optimum Moisture Content

No. Of Blows / Layer


Wt.Mould + Sample
Wt.Mould 400
Wt Sample
Volume of Sample
Water Content
Dry Density
LOAD (LBS)

300

Penetration Dial Reading Load


(Inch) mm (Inch)
0.000 0.000 0.000 0 0.00
200
0.2500 0.3180 0.0125 11 122.58
0.5000 0.6350 0.025 16 178.29
1.0000 1.2700 0.050 30 334.30
1.5000 1.9050 0.075 37 412.30
2.0000 2.5400 0.100 41 456.87 100

3.0000 3.8100 0.150 44 490.30


4.0000 5.0800 0.200 47 523.73
6.0000 7.6200 0.300
8.0000 10.1600 0.400 0
10.0000 12.7000 0.500 0.00 1.00 2.00 3.00 4.00 5.00
PENETRATION (INCH)

CBR Value
0,1 " 0.2"
15.23 11.64
Subang,19 Augustus 2020

Juangan lupa angka kalibrasi Proving Ring


Kalibrasi 11.14
Untuk yg 10000 lbsKalibrasinya: 49.45
Untuk yg 2000 lbsKalibrasinya: 11.14

You might also like