Professional Documents
Culture Documents
Ilovepdf Merged
Ilovepdf Merged
300
LOAD (LBS)
(Inch) mm (Inch)
0.000 0.000 0.0000 0 0.00 200
0.2500 0.3180 0.0125 8 89.12 200
0.5000 0.6350 0.0250 12 133.68
1.0000 1.2700 0.0500 24 267.36
1.5000 1.9050 0.0750 29 323.06
2.0000 2.5400 0.1000 34 378.76 100
100
3.0000 3.8100 0.1500 42 467.88
4.0000 5.0800 0.2000 48 534.72
6.0000 7.6200 0.3000
8.0000 10.1600 0.4000
0
10.0000 12.7000 0.500 0.00 1.00 2.00 3.00 4.00 5.00
PENETRATION (INCH)
CBR Value
0,1 " 0.2"
12.63 11.88
Subang,19 Augustus 2020
Juangan lupa angka kalibrasi Proving Ring
Kalibrasi 11.14
Untuk yg 10000 lbs Kalibrasinya: 49.45
Untuk yg 2000 lbs Kalibrasinya: 11.14
Project TAIFA INDUSTRIAL PARK ,SUBANG
Date : 29 Juli 2020
Location : SUB GRADE JALAN Done by :-
Koordinat X= 809567 M Remarks : NO.02
Y= 9278948 M
300
LOAD (LBS)
(Inch) mm (Inch)
0.000 0.000 0.0000 0 0.00 200
0.2500 0.3180 0.0125 9.0000 100.29 200
0.5000 0.6350 0.0250 12.0000 133.72
1.0000 1.2700 0.0500 21.0000 234.01
1.5000 1.9050 0.0750 29.0000 323.15
2.0000 2.5400 0.1000 35.0000 390.01 100
100
3.0000 3.8100 0.1500 43.0000 479.16
4.0000 5.0800 0.2000 48.0000 534.87
6.0000 7.6200 0.3000
8.0000 10.1600 0.4000
0
10.0000 12.7000 0.500 0.00 2.00 4.00
PENETRATION (INCH)
CBR Value
0,1 " 0.2"
13.00 11.89
Subang,19 Augustus 2020
Juangan lupa angka kalibrasi Proving Ring
Kalibrasi 11.14
Untuk yg 10000 lbs Kalibrasinya:49.45
Untuk yg 2000 lbs Kalibrasinya:11.14
Project TAIFA INDUSTRIAL PARK ,SUBANG
Date : 29 Juli 2020
Location : SUB GRADE JALAN Done by :-
Koordinat X= 809689 M Remarks : NO.03
Y= 9278909 M
300
LOAD (LBS)
(Inch) mm (Inch)
0.000 0.000 0.0000 0 0.00 200
0.2500 0.3180 0.0125 11.00 122.54 200
0.5000 0.6350 0.0250 17.00 189.38
1.0000 1.2700 0.0500 27.00 300.78
1.5000 1.9050 0.0750 32.00 356.48
2.0000 2.5400 0.1000 36.00 401.04 100
100
3.0000 3.8100 0.1500 45.00 501.30
4.0000 5.0800 0.2000 52.00 579.28
6.0000 7.6200 0.3000
8.0000 10.1600 0.4000
0
10.0000 12.7000 0.500 0.00 1.00 2.00 3.00 4.00 5.00
PENETRATION (INCH)
CBR Value
0,1 " 0.2"
13.37 12.87
Subang,19 Augustus 2020
Juangan lupa angka kalibrasi Proving Ring
Kalibrasi 11.14
Untuk yg 10000 lbs Kalibrasinya: 49.45
Untuk yg 2000 lbs Kalibrasinya: 11.14
Project TAIFA INDUSTRIAL PARK ,SUBANG
Date : 29 Juli 2020
Location : SUB BASE JALAN Done by :-
Koordinat X= 809689 M Remarks : NO.04
Y= 9278909 M
1400
Penetration Dial Reading Load 1300
LOAD
Volume of Sample
Water Content
Dry Density
LOAD (LBS)
300
Penetration Dial Reading Load
(Inch) mm (Inch)
0.000 0.000 0.000 0 0.00
0.2500 0.3180 0.0125 5 55.72
200
0.5000 0.6350 0.025 11 122.58
1.0000 1.2700 0.050 20 222.86
1.5000 1.9050 0.075 26 289.72
2.0000 2.5400 0.100 29 323.15
100
3.0000 3.8100 0.150 32 356.58
4.0000 5.0800 0.200 37 412.30
6.0000 7.6200 0.300
8.0000 10.1600 0.400
10.0000 12.7000 0.500 0
0.00 1.00 2.00 3.00 4.00 5.00
PENETRATION (INCH)
CBR Value
0,1 " 0.2"
10.77 9.16
Subang,19 Augustus 2020
300
CBR Value
0,1 " 0.2"
15.23 11.64
Subang,19 Augustus 2020