/
? AmmoniaKnowHow.com is, FERTILIZER
INDUSTRIAL
NH3 HNOs CH30H NPK [NHa)(NO3) SERVICES
Operational Excellence
in Fertilizer Industry
- Maintenance strategies and capabilities -Fertilizer Industry Needs
iM The right maintenance strategy deployed at the right time with the right resources and
industry knowhow is key to meeting performance objectives.
HM Gain the ability to adjust and update for varying operating and environmental contexts
is a high advantage capability in the current market.
fl Always try to achieve the maximum performance from your assets.
—fT Nowadays trend is adopting a culture of “Reliability over Repair" through Asset
Performance Management (APM).Our ne
Stage 1. Audit of the existing System as in pl
cee AMET MTree ecstatic}
- Organization Chart (Maintenance Dept. only)
- Understanding the personne! allocation to identify areas of improvement we
Tea)
- Level of skills, assessments, training and certifications (provided by us as part
of the package)
- Consistent approach: assessments of modifications recently implemented or
in course of implementation
—f Maintenance Historical Data Availability
Sam lT 9
- Consistency and data reliability
- Field & database collection
SMAI) met olA
ae UES
mee MUNRO Rs Le Rec) tect)
- Further feedback and collaboration from Client is essential during this stage
cee MU aE UML ag Sy
ae
Stage 2: Preliminary discussions with erent
Management for Maintenance
new structure implementation
— lf FIS is presenting an overall, high level plan of Maintenance Implementation
se MER CLS
Sa
- Exchange of emails
Seen)
- Budget allocated for implementation
cee APO eu RU CUE UR ema OU}
— Meeting to discuss the proposed modificationsStage 3: Maintenance implementation plan presented.
Approval by Client |
—EEIFIS is presenting a detailed plan of Maintenance Implementation
- Maintenance Department Structure
- CMMS
- Detailed equipment review
- New technologies or upgrades
- Implementation schedule
— Client final review and comments.
—HIFIS is producing the final version of the Maintenance Implementation Plan (MIP)
— fl Meetings to discuss the site implementation, allocated personnel, schedules and
planning for next stage
ae ] a d
Stage 4: Onsite Maintenance Implementation
eee Mule as (rca)
fl Continuous feedback from Fertial during this stage
— 4 Modifications of the approved strategy carried out on-the-fly
——m Periodic meetings
1 tJ
=e
Stage 5: Acceptance Testing Audit
— lf Carried out post implementation and after the system is up and running
——fl Client feedback
- Management
SMTi are 8 -)e-UUT AL
- Recommendations and ImprovementsWe focus on a
—— We need to know what assets we have;
——-l Geta clear view on their performance against target;
——ll \dentify “bad actors” based on your ammonia and urea license type and previous
collected data
—-@ Establish equipment criticality using our fertilizer technology expertise and
feet em iitkel* aM 84 lena (el° Vat e ee
—ll Asset condition need to be visible - focus of life plan development on predictive
maintenance;
—™ Standardise maintenance strategy across same items within the business;
cee MOCO ae eae UL MU MoO VISE CMs MOL a cell (ela
eee Me Uae hed Walae ia Soar ts (Ue RSC ale Rell] aoe
see YN 7-10) oT tii-ie NO) ate oe
——fll Ensure effective reporting on equipment and management systems performance.
j g¢ ee
Where to start?
Any fertilizer company looking for a partner to work with in helping to drive process
safety performance needs to have absolute trust and confidence in that partner.
The ideal partner needs to:
Know the client technology,
eS Te Coie ROM NCU USA
Semi CN on 8-Cete 8-1
Understand the process and PSM systems,
In general, our first engagement with a new customer can come about in many ways.
and typically involves the delivery of one or more of our services from around the safety
lifecycle:
a risk assessment for a new project,
———4§J support in investigating a specific issue or incident,
———flJ a training course,
EVI uM Ur-Te |The =r Leo
Once we get started we will be there to support the full beneficial implementation of a
solution. Once a good relationship is developed we can look to build a broader
partnership and would typically start with an overall assessment of PSM [ol eyolte)
prioritized and risk based improvement plan, built around site risks, capabilities etc.Our Fertilizer Technology Know How
CU Cle Za [ol Ae Me MLL aol dao) Ae Core
Industrial Services specialists build the first Global Risk Register specialised in
Ammonia and Urea technologies. Currently hosting over 500 incidents and case
studies from the fertilizer industry our database grows every day.
Pee EU MoO Ul Loco MLM ae ao) oN Re eRe Mero)
measures are recommended for each individual case.
For 2018, we estimate over 1000 incidents and near misses will be recorded in our
Global Risk Register database covering all project phases from Design to
Commissioning and Operation.
Other services include:
— ill Greenfield and Revamp engineering support for Nitrogen Fertilizer technologies,
—ll Commissioning, Start-up and Operation support for Nitrogen Fertilizer technologies,
—ll Process Safety Management and risk identification for Ammonia and Urea plants.Thyssenkrupp
Unde
Haldor Topsoe
ThyssenKrupp
Unde
Thyssenkrupp
Unde
ThyssenKrupp
Unde
KBR / Casale
KBR
Key projects
Abu Qir
PVFCCo
EAgrium
Maaden | & II
Maaden | & Il
Amonil SA
Mary Project
SORFERT
Fertilizer
ENPC
(Egyptian
Agrium
Nitrogen
Products
Company)
SAFCO IV
Amonil SA
FERTIL,
PVFCCo
Azomures SA
Duslo Sala
Amurco S.R.L.
Azomures SA
Egypt
Vietnam
Egypt
Saudi Arabia
Saudi Arabia
Romania
Turkmenistan
Algeria
Egypt
Saudi Arabia
Romania
UAE
Vietnam
Romania
Slovak
Republic
Romania
Revamp case study and energy
efficiency program for Ammonia
plant
Training, operation and production
optimization for Ammonia, Urea and
Utilities
Process engineering and design
services for ammonia plant |
Process engineering and design
services for Ammonia plant
Commissioning support for world
largest Ammonia plant
Operation support and production
optimization for Ammonia plant
Precomm/Commissioning /Start-up
Field Advisor in Ammonia Plant,
1200 MTPD, license g
PrecommiComm. Start-up Process
Supervisory / Advisor in Ammonia
Plant Uhde 2,200 MTD license
(Trains 1 & 2)
Commissioning Supervision for 2
trains Ammonia Plants Uhde
license, 1,200 MTPD
Operation and production
optimization for world largest
Ammonia plant;
Revamp, start-up, daily operation
support for Ammonia plant.
Preparing process documentation
for Ammonia plant for formal
proposal and bidding process;
Preparing process documentation
for Ammonia plant for formal
proposal and bidding process;
Ongoing operation support for
Ammonia plant
Plant inspection and assessment
for dual pressure synthesis
Ammonia plant technology prior
commissioning.
Development of methodology of
work, work instructions, operating
procedures, special system of {
production rules and regulations for
ammonia production
Development of risk register and
ALARP Demonstration
methodologyAf “a
- —
-
PV tot aT)
UreaKnowHow.com (UKH) and AmmoniaKnowHow.com (AKH) provide
Engineering support and Operational and Maintenance expertise specifically
to operators in the Nitrogen Fertiliser Industry.
a UKH and AKH comprise a team of independent Ammonia and Urea specialists
with experience in operation, project development, revamp solutions and
mechanical completion of Jarge scale fertilizer projects worldwide.
Consultancy
—
Commissioning [eae
i—> ‘Start-up
Operation
__ Reliability
Implementation
PET Mrmr rer
eet ek Ace
Email: dan.cojocaru@ammoniaknowhow.com Email: dan.cojocaru@fertilizer.services
ET CONTAIN Neda Oe Web site: www.fertilizer.services