You are on page 1of 1

RUMAH DUKA, LAB FORENSIK & R.

ISOLASI
No. Uraian Nominal (Rp)
A FINISHING RUMAH DUKA 8,700,000,000

Perencanaan 100,000,000
Pengawasan 100,000,000
Biaya Pengelolaan Kegiatan 65,000,000
Total A 8,965,000,000

C ALKES 1,035,000,000
1 3 unit Ventilator 525,000,000
2 3 unit High Canul Ventilator s/d. 15 lpm 405,000,000
3 Instrumen otopsi 100,000,000
4 Biaya Pengelolaan kegiatan 5,000,000
GRANDTOTAL 10,000,000,000