You are on page 1of 2
at eres wath PT REKAYASA INDUSTRI and RAFAKO SA ee Date: September 16”, 2020 No. : LPP-L-CI/PL-682 To. PT. PLN (Persero) (“Owner”) Unit Pelaksana Proyek Pembangkit dan Jaringan Lombok JI. Yos Sudarso No. 2A, Mataram, 83114, Nusa Tenggara Barat - Indonesia Project + EPC Contract for Lombok CFSPP FTP 2 (2x50 MW) {"Project” (No.0742,P)/DAN.02.01/DIR/2017 dated December 28”, 2017) Attention Mr. Leonard SM Simatupang. Manager UPP KITRING Lombok Subject 1 Statement Letter for 150 kV Underground Cable Shipment 8 REK MRR No. LPP-00-EO-MRR-23-R Dear Sir, Referring to Shipment 8 REK of 150 kV Underground Cable, BL No. AFWO177414 dated February 11, 2020, we ‘would like to inform the Owner that the material already arrived at site and has completed the clearance process on June 02, 2020. In order to get a Receiving Report issued by the Owner's Site Manager as stipulated on Sub-Clause 3.2.3.1.3 part 3 Special Conditions of Contract regarding Payment upon Delivery at Site, we, Consortium of PT. Rekayasa Industri and RAFAKO S.A, hereby state that shall be responsible to provide Manufacturing Data Report ("MOR") related to the 150 kV Underground Cable in accordance with Handover Document Procedure No.LPP-00-G5-PE-101-C Rev.1 and Turn Over Package Procedure No.LPP-00-Q3-PP-SO1-R Rev.2. Please be informed that the MDR is still being prepared by Vendor (SUMMARY MDR VENDOR LOMBOK CFSPP FTP-2 (2x50MW) as attached) Thank you for your kind understanding and good cooperation. Sincerely yours, On behalf of tug Consortium of PT REKAYASA INDUSTRI and RAFAKD S.A (“Contractor”) \ tsnanto Kari" Project Manager CC: = General Manager of PT PLN (Persero) UIP Lombok “Me Ahmad Salim (Project Direcor of Rekind) File 1|Page

You might also like