You are on page 1of 16
SIRCLASS INSPECTION eee 4 3S ¥F Stage Canopy (Promoted inion Reger Sper! REPORT 10.03.2021 aay Report No: 'aUR/21/ABK/057_[ File No & ISN No IRCLASS Client M/s Innovative Engineering. Inspection Location: Gamangatti , Hubli. End User/Project: M/s Nayara Energy Ltd / M/s Raghvendra Filling Station Yemignoor, Kurnool Andhra Pradesh. Vendor: M/s innovative Engineering. Sub Vendor: Nil Vendor PO No & Date: | As per Mail Sub Order PO No & Date: | Nil ‘Mode of inspection Request (Verbal / Email / Fax): _| Email dated:09.03.2021 = Previous visit report Ref. No. & Date: Nil a Pending observations in previous report (if any __ Report No. Date Closure date Reference Standards: As per Checklist / Drawing/Tender Copy uate | Reference Documents: (Add rows for more documents Datasheet, NDT. Pressure, Performance Test Pracedut, ete) Doc. Name Doe. Number ‘Approved | Rev Document By No ‘Supplied by Tech. Spec.No. : : ts [aes E ‘QAP Ref No/Rev No ‘As per Checklist / Drawings / Tender Copy = = E Drawing Ref No/Rev No | General Assembly Standard Prefab Canopy - | 03.02.20 NEL: 10<16m-Yemignoor— 001. | ‘Drawing Ref No/Rev No _| Details of Colurns:10x16m-Yemignoor-002 =| 03.02.20 | Innovative Drawing Ref No/Rev No _ | Details of Rafters: 10;46m-Yemignoor-003 | NEL(Trough | - | 02.02.20 | Engineering Drawing Ref No/Rev No | Details oF 2 purlin & Sag rods:10x16m email) [~~ | 03.02.20 Yernignoor-004 Drawing Ref No/RevNo | Details of Fascia Frame & Fascia rafter - | 02.02.20 Frame.: 10xl6m-Yemignoor-005 | Inspection Details & Supporting Report's attachment Reference. | tote: Sampte selected rom ot shouldbe inctuded in report with entiation by hest no em. n/t Details of items offered for inspection: 1st Stage inspection Of Pre - Faby Canopy Structure at Vendors Factory. CANOPY SIZE: 10 X 16 MTRS- ie SITE LOCATIONS: Raghvencira Filing Station Yemignoor, Kurnool, Andhra Pradesh. temberc | Offered & inspected Qty (No's) Column | 2503x250x6-£300mm = 04 nos oi pa Rafters | RFI-1001300025x4-3285 mmDanos /RF2-100x300%05x0-4365 mm=O4 nos Purlins G1 Z-65x250x2.6 ~ 4915 mm =8 nos / GI 2-65x200x2.0- 4915mm=20 nos / MS L-75x100x2.6-4900mm_ 04 nos/ S61 1244 aia=5Sn05/ BRIKBR2-SENOS /Gutter Support= 28 No's. BI Fascia Frame FR1+FF1 (RHS 80x40x2mm): 444 Nos Each/ 52 Running meters Dummy Fascia | 1200X2500X Imm= 21 nos Name & Sign of Surveyor (s) Asif B oie Dass ‘Surveyor to IRCLASS _\ Name & Sign of Veni or Ren. Effecive Date: 26.02.2021 ‘Sheet 1 of 4 < INSPECTION ‘Survey Station: | Bangalore ee eee Date: 10.03.2021 Report No: [ BLR/21/ABK/057_ FileNo & ISN No Inspection Details: Following Inspection is Carried out as per drawing / Tender Copy / Checklist for 1st Stage Canopy as Sr Backup Document hg | Activities Performed Details of observations pao i ‘LVisual inspection is Carried out for overall WorkmanShip for material, 4. | Visual inspection ‘welding and Painting ~found Satisfactory. : 2. Checked Electrode make grade and found Mangalam . |LHole size and Dimensions are checked randomly @s per Drawing Found 2. | Dimensions satisfactory. A spestion, ‘2.Checked Overall Dimension randomly of Rafter, Column, Base Plate, Main Beam and Colurmns as per Standard Drawing Found Stisfcty. 3, | Material and Make | Material Used for Column, Rafer, Fasia Frames ec founda pr Specified zZ "| Identification and Approved make. ag ate Filed Checklist and Ofer st Are attached with inspection Report and ‘Observations are Mentioned. —_ 1.8 mt ee oe ive | Base plate Size Columns Rafter Overall length ‘Name & Sign of Surveyor (s} < Name & Sign of Vendor Rep. peroneal AZ Mr. Kustal / 88800 Surveyor to RCLASS Da i iii High Effective Date: 26.02.2021 Form NON s IRCL. ASS INSPECTION Survey Station: | Bangalore Stage / Final: | 1° Stage Canopy ee REPORT Boa eee Report Noz BLR/21/ABK/O57 File No & ISN No Al Gutter Sheet Make-ISW_ ‘Dummy Fascla Make-TATA 0.5mm Thk Polycab Cable Sagrods Angle Support. Purtins make ‘Attachements: 1. Checklist for Inspection of Fabricated Material at Vendor Factory. 2. Offersheet or BOM g Remarks / Deviation (if any): Roofing material & Accessories, False Celing, LED are delivered to Site. (These Hardware Items not offered for Inspection), Please Refer Checklist for observations. ‘Surveyor's Identification mark (Hard stamp/Hologram/Sticker) & its location on inspected ite Calibration Status of instruments used: (auach Reports or Reference as Applicable) Accaptabe radenes of traceability fo national ad international andar of measirement of tho calrationsperfrmed by "atonal Metrology lstitutes such 3s NPLinda or other CIPM intereatonal commie for weights 2nd measures) MRA signatories; Cotton aberstorio eerodited by NBL India, an LAC snd ADLAC MAA sgratry, or thse demonstrating cmplaneat ISO/IEC 17025; {alioration Laboratories areredted by other LAC MRA ignatoric. Measuring equipment Calibration validity Calibration Ref. | National/ international traceability Name & $F. No (Lab Cort. no) \Vernier Caliper 0-300mm ‘oajo4/2022 (04578200, P/09/190007 For MTC/Lab Reports/Type Test certificate review, please note below: ‘The content of the Certificates / Reports reviewed for correctness with respect to respective standards /requirements and the report Is from NABL accredited / Non-accredited Lab / Any other report (Kindly strike off the non-relevant option) Disclaimer: ISSPL will not be responsible for test results from any Non-accredited Labs. Conclusion (Accepted / Not Accepted / Hold): Accepted (Acceptance Subjected to remarks Point.) Remarks (if Not Accepted / Hold/ others): Refer Remarks. Name & Sign of Surveyor (3) Name & Sign of Vendor Rep. servers ie Surveyor to IRCLASS Effective Date: 26.02.2021 Form RaS/F/iB, E001 Rev. 05, SIRCLASS INSPECTION eee = - . 1° Stage Canopy Cronyn tne REPORT Sana | Report No: BLR/21/ABK/057 | File No &ISNNo ae — End of Report- "Note: This inepection report for tho inepection activity oferod fr inspection and NOT INSPECTION RELEASE NOTE fer dispatch. ‘This inspection Repor (I) Inspection Release Note(/RNY/Certcat Is issued upon the fotowing terms and conions ‘The scope of inspection covered in this reporvcetificae is ited to the Scope of Work agreed in the contract between ISSPL and Its Customer, And also fmited to aciual work completed and the applicable reference documents submited to ISSPL. by the Customer of (Customers authorized personnel atthe me of Inspection Whit IRCiass Systems & Solutions Private Limited (heteinafer referred fo as ISSPL) and ks Commitces use their best endeavors to ensure that {he functions of ISSPL are propery caried out, in providing services, information or advice neither ISSPL nor any of is servants oF agents warrants the accuracy of any information or advice supplied. Except as set out herein neither ISSPL nor any offs servants or agents (on behill ‘of each of whom ISSPL has agreed this clause) shall be liable for any loss damage or expense whatever sustained by any person due lo any act ‘or omission or errer of whatscovor nature and however caused of ISSPL ifs servanis of agents oF due to any nacouracy of whatsoever nature ‘and howsoever caused in any information or advice given ia any way whatsoever by or on behalf of ISSPL, even ifheldto amount toa breach of warranty. Nevertheless, f any person usos corvicas of ISSPL, oF roles on any infomation or advice given by or on behalf of ISSPL and sutfor: Tose damage or oxponses thoroby which is proved to have bac duo fo any negigent act emission or oor of ISSPL it sarvans or agenis or any negiget inaccuracy in information or advice given by or on behalf of ISSPL then ISSPL wil pay compensation to such porson for his proved loss up to but not exceeding the amount of the fee charged by ISSPL for that particular service, information or advice. ‘Any natce of claim for loss, damage or expense as referred to above shall be made in writing to ISSPL Head Office within six monthe ofthe date \whan the service information or advice was fist provided, falling which all the rights to aay such claim ehall be forfeited and ISSPL hall be Tolloved and discharged from all abit. Manufacturer / Suppl does not got relieve trom the guarantee and ebligaons sat orth into purchase order and other contractual cocuments. Name & Sign of Surveyor (5). Name & Sign of Vendor Rep. narolhere ‘Surveyor to IRCLASS OY Sheet 4 of 4 FS FE /iRJ001 Rev. OS Effective Date: 26.02.2021 NAYARA ENERGY LIMITED Location: Raghvendra Filling Station, Yemnignoor, Kurnool, Andhra Pradesh [cenopy Ste: 10xX16M Contractor: M/s. innovative Engineering ‘WIDTHIN [UNTWEIGHT IN] SNO DESCRIPTION SECTION IN MMA LENGTHLINmm | Mant Kes. ary _|_Tore.wereer Columns i Description ‘Measurement as per drawing jeasurement BASE PLATE 2 600 600 707 a 282.60 ‘cOuUMS ‘SHS 2503250K6NIN 6306. o 2535 4 1134.00, Gusset Plate 0mm 600 250 118 3s 94.20 Gusset Pate 0mm 360 250 31 i 50.24 Rafter plate 10MM 340 420 2 a 39.68 Cover Plate ‘10MM 25 235 26 4 70.40 Internal plate un 238 738 27, a 1067 Ribs 10MM 75 B ry 2 143 Section Tel0oKioox60aN The 250 28 16 446 Splice plate 10MM. 250 0 10 3 785 Rafer 2 RFI: a Nos: (Overall length 3285 Press Csection (Ce100x300%25% aN 3280 300 Eg z a6 Rafter plate 10MM 340 220 2 4 44.50 Batten Plate em ‘380 300 | 18 36 6443 Batten Plate eum 25 225 or 16 1178 Fall Stifiner eMM. 288 88. 12. 24 2865 Rib Suffiner ‘MM 38 88 0a 32 1.67 ‘Angle Support 100x100 6mm 600 53 3 42.40 ‘angle support ‘100x100x6MiME 200 18 8 3400 Purim cleat (GMM 245475 500 75 FT ‘9036 ibs MM 5. 235 03 24 22.58, ‘angle support oox00x¢mm 200 13 2 15.60) Abs eM 100 288 1a 3 1085, [RF2:4 Nos: ‘Overall length a365mm Press section “Fram C:100X300x25KAMML 257 300 752 3 0136 Rafter plate 10MM 340 20 a2 a 4884 Batten Plate eMM 380 300 18 20 71.59 Batten Plate MM 280 {100 23 8 20.55 FullStffner ‘em 258 38 az 24 28.65 Rib Suffer ‘6MN 38 38, 08, Ey 1752 ‘Angle Support 100X100 Gr 600. 33 3 42.40 ‘angle support {1OOXI00X6MIM 200- 18 3s 20.00) ib Plate ‘eMM Ds ro O7, 16 178 Purlin deat EMM 245375 500 75 36 220.48 Ribs eMM 65 25 ‘08 32 30.11 ‘Angle Suppor ooxiooxemm 200 FE} 36 20.80) Purine PRL ZEOSONE.SK 5 ai a Tea PROC "Z-65X250X2 6thk 4915 a a 168.49 3 PR -65K200%2 Thi 4915 288 30 228.60 PRO Z.65X200%2 The 4915. 283 30 288.60 PRS 1-75X10082.6 ThE "4900 200) Z 20.00 PRIX E-TSKL00@.6 Thi 4900 200 Z "40.00 SGI mm 12 20 23.60 NAYARA ENERGY LIMITED Location: Raghvendra Filling Station, Yemignoor, Kurnool, Andhra Pradesh ing [conopy Sze: 10x36 m1 Contractor: M/s. Innovative Engineering WIDTH IN [UNTWEIGHT IN] SNO. DESCRIPTION SECTION IN aM LENGTHINmm| MM Ks. av _| Tore.wegur S62, 22mm. 1380 12 30 36.60, 563. 2mm 720 06 5 320 BRI Laoxaoxomm 750 42. 28 3332 BRE L50xS0x3mm 2300 Si 28 252 Guiter Support ‘MM 350 a 34 28 93.96 ‘Aluminium suppor amnm 760 20 10 28 2673 Frases Fria Nos Overall fength 4820 RAS @OxAOXORM 14 io 3 See a RNS BoxAOZ 720 25 2 60.48 Rafter Joint pate fauna 720 00 34 3 2720 Rafter Joint plate fexina ra 200 100 10 3 7.60 FEF Joint plate [ext 750 150 57 a 22.80) Diagonal angle lana 1250 28 2 33.2 diagonal Angle Janna 1410 34 4 32.40 ibs uM 06, 24 1464 Frir4tos ‘Overall length 8000 RIS BOAOeRA 714 2s z 21392 RNS 8oxA0x2mm 720 25 35 90.72 FePurin Joint lexis 250 380 2 20 42.40 FEPurin Joint jeune 230 250 27 3 21.60 Diagonal angie leu 750 350 57, 4 22.80) Diagonal angle [anna 110 3a 3 24.80 Diagonal angle lane 1450 32 2 38.40) Diagonal angle lame 35 5a 4 21.60) Ribs. MM 300 300 06 32 19.52 Gamer ange 7SKTSKS ‘300 Saal 4 2176 3 ‘Dummy Fascia j2200x2500xiram 2500 Fz) zi] 483.00 [Total Weight ofstructure 623743 [otal area of Structure 360 [Weight Per Sq Meter 38.98 (Phase 2 Choshe Tornepastion of fabionted matoval at vendors felony TPIA SEOpe sumer No.- Nayara Energy-€ngg-Canopy001_ RO [Sta Name &eseton [Stee Raghserdia Fling Siaton, Venignoor, Andi Paden ot Divaional Figinear——[y monanbab fiyeaarRO-cobo foot 0. is Dat 10-08-2027 os este (Samana arco] Vendor Nata PONG &[nmovals ETGREST [Swetural Design Coneutant [rh fa [cura corn & ‘see ealng mere ces. gue lrauing Pt encose the pavamaters given by Wind Speed: S8mnisec, Seismic Lond - Zone-H or higher efter as per sie location 2s per IS 1889, ja peg a ell standards approved dg? [Pesan Parameters [TC=7evqISe DL Ga Wet purn +15 ig md, Sastoal Fi oad = 20 QTR fare approves & signed Sacra Crauingsavatabe at ste? Pease enon tha Grng Now @ Us SRR Ws OT appVOVeT lana [Ate doings raising wih approved Drerings? [ete zs layout snow nthe cavinge sper Wis cpproved ae Iyeul San [diperslne [helghW approved oan? TORTIE PAY wae Siete star catagory Sr or igh celato of Svucura mambots oper EON, oat esa Irina 32 kal er xls ang 36 fam or un [Wesrtetcenory Hie tacaas maght ers nth bas le, iasee ase fo a oh a acs Ps bal crate —] BRB keg) mo “tb [Srutie Warkmanchie na Vaal Chea for amoot Remogorians wold re Tem ae eats, |woiang iecwose fotoce of E8018 or required Grade tebe used. forweldng ake ot clocvedes Weed eT weldng al be ESM | ADOR DAH ISECHRON/ Dal MALAM IMETALLOGEN LPI ertan make of ecrose. MarvfactiressCartoia Found Fak Zavtos sain Goal [Queratauoity of abicaion apa be osieecon and aosopae cnfoning is wanda Enaiieang Pasion — [Hoes or tiasjeints ole forthe bated ints made by dling on. BOKHa Size ae cored oe per Grewnga No hoes by gas CURT TESS aT ileot . 7 [earn Sata 2.3 [basic Detaie Flapsciy Loni aX cant AL) [Check for Clot Hah tom FOL. $m fr NIGH BO or CRRA. (Male of Stucual telusea? Si mares? 1OXTE X OO mss | 2 Jooumn nan fhe Golam Secional Sze & measure WibtTaaS z His hs 2s pet proved draws? rary Heed Gnauliedand ‘Column -heaht-2s es esprved Taina [Menton ths colunn Peaht ncucing Base paleo conn SS 6300 mr Base plat aze Legh vm), [bth os per approved orn 28X60 KONO [aso rst bracing (Ub plats) sx 2d cevan we AROSE ana? [she ATanpement of butdajon tot hoes as pe apotoued creving? value fam po cf saraao matelze Miskqr2) PVC, Nake SupranaPrnes Ree e eS Bebe BRIS Hil yf} ran ae open ace 3 opering of cute of ran water pve as 00mm above base pale BEIT Os| “9-<> myn abhor [ncauran ang provain of lng of ereadrs dos aiaea dono The centre ins fx Spread ring shal b 76m ftom DU ished peuestallsnd Hea OK Chuked vi - o [Phase 2 ChecRTaT Tor (Gooument No Najera Ener [Stenewe-s Locator [nate o Dvisonal Ergres Ista ick eco eridor NST tal Design Corea vain Beam 29, [Fatse coting 3 [Dimension cracks ino acaed malaraT awa -Ganopy1R-001 [stee Renhvendra Fling Sk WVmehanbas [D000 10-08-2027 Innovate Ena ROLES (Measure and Wenter r Inthe secon a8 pe approved anna? (Male ond specfeatora as pe Novara Energy Handa rani ste ang etrengement a pr Nayar Energy sandra Aperoved caning wit Sadar Sas plas ws dS Te Pun zeae [sth putin of Geto! yon, enter Ha ing eens pote? aa Sie and shape of he saclons of Fares fama: jerton a restore of mater Fasc ceign and fang ara rane z othe roging wth slanderdprotie Reotrg Sront- Garo Galvlume Siel choc, Tasiok Kipeonprtiedvheaia, Atm Gover wih, Wine Nests HAUT lnm Contes & 2 y -lnbarch,Ntasior ins. KanatshPesaay oc clnr approved fm Navara a [Roofing sheets shal be (bed crins/ a a fea [sto roving mater wh standard tnatress7Check the heknoss TCT 2 ocafons par sheet enemy and WeTOTS Ic requroa quanily for rating aosacnooa Ihe Rldge ap, side Taching, Gable tm Flashing, seen end washer, Spe vacate? Yrs the recng accensiias Ia Pipe ip, si Wai, Gabo Wis Peshing,crewa and washer, cpa for opened Isto cling wih aro gpacTeaton pote a HOMER) 7 F(Pr-panted). 1mm 7m 0 Som hice ne-coate- isto Fats culing matonal wan slandard bickress heck tho heknoss TCT at losatona por BihTaRIOTV aT menton the. i rad OUST ana SSOERONST fae ne eusporaer of stanaardthokroas and Glodburenated? Min thickness Otma 8 a8 25mm 25 riers soaead not mre ha eon ee [ve suspensor bold te pulng win two bole and unmers vib one? lve sussenson arangorent ecixa ype? isthe oving Neteral beeen angles ard susperders Gove 6s pa apraved GaumgamanaaT IBotna win rf ls toring Meter btven pun ana suspanders done ws por approved asingsandarasT ‘Gina bole ofan de, lata neotncknsee of ne Henge? iste mata fa Tasting as or Nayara Enegy Sareea? (Samo ag Fass cnlng rat [se requrod iy of Fate aig acsesoT en aTREO7 n angles Runner, Gi Pana (Smension ches feral Couns A arsine check fora ahr: Al ss ge larger (Phase 7: Checks Yor nopeaton of abioted alos a vendors Rey -TPIA SE [Document Wo.- Nayara Ener anopyiR-00" RE. iis Name & salon ee Raghiends Fling Sion Verianao, Anais Psaoah Tame. Owscnal ngnaar —~v monerabu [Tyger - Cov0 TPCoDOT — [Dabo sat learns ft Tae POSE ovate [Swusual_Oegn Colin (Thi Party nepecon vendor — IR be ‘otal Base Pal -Alas ug aoproved anna? annecing Hats for Pray Fiaming-Colsmna | Ratars = Als pr Sendatd cng approved dana? r aming Al oher erate. Al a pr Stanearé Og a G i for Sure na Gaal (6 ty Sacks ofeach cost wll ba 26 me [structore ri pankin Two Coals-Tigh gloss pheoicrodfea alya based sythets enamel wnt pars confomag "2002 (OFT of each oat wil be 20 meron [columnatsase Plate Zine based pony prin wo Coat (yf thishness ofeach coat wil be 30 mirons) |Column & Base Plat Gorn suracashalloe snoolerod by sppiyna 118mm Pak dice ear pay to roo leerigouging mil marks ater et coat of epoxy primar olewed by. eaconl coat of epoxy primer Two cleo Frich epoxy paint ech of 80 micron - wits colour (Put wean on sain poroved Moke List (sf te Sia soos SI osoning make fer Jenna mark the make fespectve materia! [Rooting & False Coling-Inerarch, Melel or Ines, Kariaksh,Paseey, Sonex or ier approved fom Nayara eer laced? Menton fo rahe] Cort" # Fete Calin Itrech,Matoel ciel, Karu Pesey, Sonex oro om Nayara energy Ld patty 7 ina ERE Pains Neri lanat [Down ieke- SuprenePnes acing Bots fPrimay Framing: Columa | Rafos GRW/TVSUUNEREARO Grade BOTOS [Sane 2 sr 59x Core er soured cabs (Shusural Foundation design caledalons & Oraning, aly vesied om leensed aval ex] eaineer IResroved draws for Canopy structure, Rooting sytem, Sope arwaver anage syste -Cuer Sd GSW Tl [Manviaclurrs est carfcates fr strudurl sos. roolig ard oalina Ta IMT for Gl Sheet Tor Cabos (PRLS PUC anata’ ar eb LED TSS lor ce Documents po E i al q i i basbesse: ERREERY; HE 1B i i & [ROOF SLOPE = "1:20 (win) | UTTER SLOPE 1:100 (wi) eae meres = (cue ay Era inte ‘Sree Raghvendea Filing. Staton, Yonignoon, ocation moos Arch Prades aa Te co Skuclaral GA OF Canopy FUND 250%280-8.5m HT) ‘poueie COLun—caNGY NG ‘STANDARD COLUM {area 6S000VERALL {lettes iia pad eae BASE PLATE {see.2-2) com ry got [mo] —escern 7 eee es ‘SFUCE PLATE 24 = aoe are " a a aera \ oo ame our THROVATIVE ENGIN ERING fn on es ape ea = 82 urea cust seyrs Era Uta Low toxte swe ower Tocation | $r20 Raghvendra Filing Slation, Yaronoor | ion | Kornootanghra Pradesh | ta co TE sign oF com sae | ee CENTRAL RAFTER (4.5m) [ BILL OF WATERAL fi 7] erocerm] | [emser— men OE MF ner oe peer alps a tira : dea eh opus i | TTY Fone —| p= ona t | ae = | 5 Re suroer Hecate | SR ee a | PATRAS eee |RSS Eh uta Cu tae ae ee eae Sag reat ieee tee Fewer | |B = ‘ “ewan THROVATE ENEREERG cuENT Nayora Energy Limited Rofter Design 108 toxt6 —staNOARD canary oii a ai z E eh eel see! c sours TLecation | Sr62 Raghvendra Filling Station, Yemignoor ea Se Kirnoch Andhra. Pradesh Eg = 3 EDGE PURLIN BEEP a mae 3900 ANGLE FURL @ EDGE i '5x100x2.6—-ANGLE EDGE PURLIN PR3@3) 1 mo, Set (AS SHOWN PR3, OPP. HAND PR3X) '5x250x2.6-PURLIN a (BELOW GUTTER) PR1 @ 1 no. Set (AS SHOWN PRI, OPP. HAND PRIX) ese eee a coe i CLT = aI zits + [@ Rae || (SESS “Te i en vsion gue, _275x200x2-PURLN PR CB 8) & PORN a ets RO 1 no, Sot (AS Sow PR2, OPP, HAND PR2X) a 5 sy | ———§ ie et ae aura cima Adana Ek | i 3 a aa ss saraarasg || 1tie ROOF PURLIN memes ae @ | | Bas ee fer orale t THONG iat a || Ge te | tT + il i tk ts 5 | a : = oe | BILL_OF MATERIAL-PURLIN WO [SRN] On [SHE [ary] Wrke)| RENRKS PRi[ /1_[ PRESS Z-SECTION | 26mm-Z:6S¥Z80—0915 | 4 | 168.5 | Der. 420 [Par PRESS Z-SECTION | 2.6mm-i:68x250~1915 [4 | 1665 | Dev. 420, | [re | 72 [Pness z-stcTIOn | 2.0mm=zesxz00=4915 [10 | 286.6 | Dev. 374 [Pe PRESS 2=SECTION | 2.mm2:68¥200-4915 [10 | 288.6 | Dev. 374 | [pes | 75 press section [240.0 tex. 200 PRS PRESS L-SECTION 2] 40.01 Dew. 200 ‘soi [74 | SAG ROD (P:1280)| #12mm-1330L9 [20 | 23.6 _IThrd. both end aa ROTATE EREERRS |[S62 [75 _| Sk6 ROD” (1300) #12mm=1 38019 30 [ 38.6 ive. both ends eine —| [303 | 6 [Steno (660) |" s12mm=73019 3 [32 ‘Thee othr ene cunsr evar Eery Uno | [PLL /7_[ SPuCE Z=SECTION 2.6mm=2:65:250-300 [12 | 27.2 | Dv. 370 SG ama an WT cae sP2| 7a | SPuicE Z-secrion| %.0mm=2:65x200~800_ [50 | 485 Dav. 322 -——t ieee eee sP3 | /a | SPLICE L-sEctiON ao] 37 | Dw. 150 tecaon | Se, pvheena® ake, Sen, Yervarcar || Rt | /10-| PRESS L-SEcTION 28 | 33.4 [Bev. 76 [aA ane ot punta Saal | RZ /11_[ PRESS L-SECTION | 3.Omm=L:50%50-2300 | 26 [142.6 Der, 04 vara | TOTAL FURL WT_PER CANOPY (TOmerém)_|-1 [15102 1 2 ee FACIA-RAFTER FRAME FR=1- (AS SHO AGACRAFTER FONE FR-1X (OPP AGH FRAME FAI" AS SHOWN FAC FRAME FFCIX'(OPP, WAND) Qy—2 Nos each a Lee DeTALL=¢ FUR ONT PLATE GUTTER SUPPORT curiee stout “poor ame ‘oe rupe RAFTER/COLUMN JOINT ‘Swe euare - cect | $a RSS Fig Son wT | [fF meson eae) i Gmail Rohan Kalal M/s Sree Raghvendra Filling Station, Yemignoor Canopy Drawings 1 message Rohan Fri, Oct 9, 2020 at 3:33 PM To: "Babu, Mohan - EOL -Hyderabad” Ce: "Ramasamy, Gurusamy - Nayara Energy” Dear sir, Please find enclosed canopy drawings of M/s Sree Raghvendra Filling Station, Gudikal Road, Yemignoor, Herein submitted for your kind approval please. Drawings are inline with standard canopy drawings Regards Vinay @) Stee Raghvedra FS DWG.zip 1685K

You might also like