SUBCONTRACTOR AGREEMENT
Paul. White Tile Co,, Inc, and Interstate Floors Conhachy @SGbcontractor’) agree as follows:
1. Engagement of Subcontractor and Duties: Paul G. White Tile Co., Inc. engages
Subcontractor to provide floor prep, flooring installation and related services (the "Services") to Paul G.
White Tile Co., Inc., for various jobs going forward. Subcontractor is a non-exclusive, independent
subcontractor and is not an employee or agent of Paul G. White Tile Co., Inc. This agreement shall
govern all jobs.
2. Warranty: Subcontractor shall perform Services in a workmanlike manner consistent with
industry standards and job specifications. Subcontractor warrants all work to be free from any defects.
Subcontractor agrees to correct any defects or warranty items immediately upon request from Paul G
White Tile Co., Inc.
3. Professionalism, Clean-Up, and Safety: Subcontractor shall conduct themselves at all
imes in a professional manner. Subcontractor agrees to leave each job site in a clean and orderly
condition at the end of each workday, and to conduct a thorough cleaning at the conclusion of each job.
Subcontractor shall observe all federal, state and local safety requirements. Subcontractor agrees to
immediately leave any worksite upon request by Paul G. White Tile Co., Inc., an owner, or a general
contractor.
4, Compensation: Paul G. White Tile Co., Inc. will pay all Subcontractor invoices in a timely
manner.
INVOICES MUST BI
Legible (Subcontractor Name, Address, Phone number, Detail, and Date)
Invoice number
Job Number and Job Name
Billing to be invoiced in units (not hours unless directed otherwise)
Description of work, broken down by day
Separate bill for every job worked on
Extra slips should be accompanied by photos when submitted for payment
Payments will be by direct deposit to Subcontractor’s bank account, Paul G. White Tile Co., Inc. will
supply flooring materials needed for each job, and shall reimburse Subcontractor at cost for any
additional materials purchased provided receipt(s) are submitted with billing (prior approval is required
for any purchase). Paul G. White Tile Co., Inc. reserves the right to withhold retainage from any
payment, and to adjust payment for any invoice as needed to correct errors. Payment for a job
does not denote acceptance of the work. Subcontractor is responsible for any taxes or other
withholdings, although Paul G. White Tile Co., Inc. will withhold funds to the extent directed by a court
order, IRS directive, or other legally binding directive. Subcontractor waives any and all right to a
mechanic's lien upon payment for a job and agrees to provide Paul G. White Tile Co., Inc. with a lien
waiver upon request.
PGW Subcontractor Agreement R 08/04/2020 Printed at 3/10/2021 9:18 AM Page | of‘444 Riverside Industrial Pry 1 Forbes Re 50 Allen Ave
Potiand, Maine 04103 Newmarket, NH 09857 Portiand, ME 04103,
Eu (207) 787-7948 (603) 773-8630, (207-797-7949
it ‘COMMERCIAL, ‘COMMERCIAL, RETAIL,
WHITE
5. Back Charges: Paul G. White Tile Co., Inc. reserves the right to back charge Subcontractor for
any and all charges or expenses arising from Subcontractor’s work, lack of work, or other actions or
inaction. Back charges may include, but are not limited to, warranty expenses, demolition and
installation expenses, material costs, clean-up costs, and any charges assessed to Paul G. White Tile
Co., Inc. by owners or other contractors. Paul G. White may deduct back charges directly from any
payment to Subcontractor, including charges relating to prior jobs for which Subcontractor was already
paid.
6. _ Insurance Certificate, Worker’s Comp., and Department of Labor: Subcontractor shall
provide Paul G. White Tile Co., Inc. with proof of insurance each year and upon request. Subcontractor
shall at all mes maintain liability insurance acceptable to Paul G. White Tile Co., Inc. with limits of
liability not less than
Commercial General Liability:
* $1,000,000 per occurrence
$2,000,000 per project aggregate
$2,000,000 products-completed operations aggregate
Commercial A\ ile Liability:
* $1,000,000 combined single limit
Workers Cot ion
* Subcontractor shall maintain appropriate worker's compensation coverage and shall provide Paul G.
White Tile Co., Inc. with a current certificate or proof that Subcontractor is exempt Additional Insured
status shall be afforded on a primary and non-contributory basis.
1 Automobile /Umbr Wor
“Paul G. White Tile Co., Inc.” shall be listed as “Additional Insured” by way of scheduled endorsement
‘or CG 20 38 04 13 (or equivalent) on all Subcontractor's Commercial General Liability, Auto, and
Umbrella policies (excluding Workers Compensation)
* A Waiver of Subrogation in favor of Paul G. White Tile Co., Inc. is required on all Subcontractor’s
Workers Compensation, General Liability, Auto, and Umbrella policies.
* A minimum of 30-day notice of cancellation, non-renewal or material change to Subcontractor's
insurance is required by contract.
Description of Operations / Locations/ Vehicles
* Paul G. White Tile Company, Inc., General Contractor, project owner and all other parties required by
written contract are an additional insured with respect to General Liability, Auto and Umbrella policies on
primary and non-contributory basis for both ongoing and completed operations. Waivers of subrogation in
favor of Paul G. White Tile Company, Inc. and other parties as required by written contract are in effect for
all poli
‘Subcontractor's insurance carrier must have an AM Best rating of A- or better. Subcontractor’s
insurance carrier must be admitted and licensed in the subject jurisdiction. Subcontractor shall obtain
a predetermination of independent contractor status from the Maine Department of Labor and
provide proof to Paul G. White Tile Co., Inc. Subcontractor shall renew such predetermination
upon expiration.
PGW Subcontractor Agreement R 08/04/2020 Printed at 3/10/2021 9:18 AM Page 2 of 4‘COMMERCIAL ‘COMMERCIAL, RETAIL
444 Riverside Industrial Pray 1 Forbes Ra 50 Allen Ave
Portiand, Maine 04103 Newmarket, NH 03857 Portland, ME 04103,
(207) 787-7948 (603) 773-9630 (207-797-7949
7. Subcontractor Warranties and Indemnification: Subcontractor warrants that itis in
compliance (and shall stay in compliance at all times) with all federal, state and local laws and
regulations. Subcontractor is responsible for ensuring that all of its workers are in full compliance with all
applicable federal, state, and local laws and regulations. Subcontractor shall indemnify Paul G. White
Tile Co., Inc. and hold Paul G. White Tile Co., Inc. harmless against any and all charges, expenses, or
damages (including reasonable attorney's fees) arising from Subcontractor’s work or any default under
this agreement, including but not limited to: back charges assessed to Paul G. White Tile Co., Inc., fines
for safety or other violations, mechanic's liens placed by Subcontractor or persons working for or with
Subcontractor, warranty issues and legal proceedings
8. Agreement Not to Solicit on Jobs: Subcontractor agrees not to solicit on any job that Paul
G. White Tile Co., Inc. is affiliated with or working on in any way. Subcontractor agrees not to discuss
estimates, costs, billing or pricing of work while on a job for Paul G White Tile Co., Inc.
9. No Health Insurance or Benefits: Paul G. White Tile Co., Inc. will not supply health
insurance or any benefits of any kind to Subcontractor.
10. _ Subcontractor’s Responsibilities: Subcontractor is responsible for having appropriate tools,
and transportation as needed to complete each job. Subcontractor is responsible for setting its own work
‘schedule and for completing each job in accordance with the job's specifications, including time
requirements or other job-site requirements imposed by the owner, the general contractor, and/or Paul
G. White Tile Co., Inc.
44. Contract Term: The term of this contract shall be one year from the date of execution.
Absent further agreement by the parties, this agreement shall automatical for
subsequent one-year term(s) upon the anniversary of execution. Paul G. White Tile Co., Inc.
reserves the right to terminate this contract at any time with or without notice to Subcontractor.
Subcontractor may terminate this contract upon 30 days written notice to Paul G. White Tile Co., Inc.
12, Miscellaneous: This agreement contains the entire agreement between the parties. The
parties agree that they may establish individual job pricing and specifications orally, but all other terms in
this agreement shall remain binding and unaltered unless specifically agreed in a writing signed by both
parties. Failure of Paul G. White Tile Co., Inc. to enforce a right under this agreement shall not be
deemed a waiver of the right. This agreement shall be construed under Maine law without regard to
choice of laws, and exclusive venue for any dispute between the parties shall be in Portland, Maine.
Any provision found to be unenforceable shall be severed and all other provisions shall remain in effect.
PGW Subcontractor Agreement R 08/04/2020 Printed at 3/10/2021 9:18 AM Page 3 of 4444 Riverside Industrial Phvy 1 Forbes Ra 50 Allen Ave
Potiand, Maine 04103 Newmarket, NH 03857 Portiand, ME 04103
Pate (207) 797-7948 (603) 773-9630 (207-797-7949
i] ‘COMMERCIAL COMMERCIAL RETAIL
ah
13. _ Equal Opportunity: We are an equal opportunity employer. All subcontractors will be
considered for employment without attention to race, color, religion, sex, sexual orientation, gender
identity, national origin, and veteran or disability status.
“PAYMENT WILL BE HELD UNTIL ALL CONTRACT OBILGATIONS ARE MET“***
Signature Required:
PAUL G. WHITE TILE CO., INC REPRESENTATIVE.
Signature: Date
o 2 |
Date
Hichosl San cher 02/5/2024
SUBCONTRACTOR
Signature: Date
Print name: Date
PERSONAL GUARANTY—Must be signed if Subcontractor is a Corporation or LLC.
The undersigned hereby personally guarantees the obligations of Subcontractor to Paul G. White Tile