While the pros of heuristic method include less computational effort and obtain good
solutions
And its cons are the solutions are not always optimal and they lack flexibility to experiment.
MATHEMATICAL METHOD
They say "Mathematics is the art of giving the same name to different things."
HEURISTIC METHOD
Sa HEURISTIC METHOD naman or heuristic technique, often called simply a heuristic, is any
approach to problem solving, learning, or discovery that employs a practical method, not
guaranteed to be optimal, perfect, logical, or rational, but instead sufficient for reaching an
immediate goal.
Halimbawa sa journalism, yung malimit gamitin na heuristic method nila is by asking Who?
What? When? Where? Why? Kapag nakuha at natanong na nila yung basic points na
kailangan nila, sila na yung bahala magcompose at maginvestigate para makapagproduce
na sila ng kanilang balita o storya. Ganon din sa construction, hindi naman sya uneducated
guess o tancha lang kasi kailangan padin tingnan yung mga posibleng mangyari at mga
basehan bago magdesisyon at iexecute ang plano. Kalimitan to magamit sa malalaking
kompanya kasi may experience na at mas mabilis dahil may mga data na sila kung gaano katagal
gawin halimbawa ang flooring per sqm at kung magkano ang estimation na tatamaan.
12th slide
pag cheaper ng resources pag tagal maaccomplish ang isang project. Halimbawa ay kulang
sa machinery at equipment pagpalagay na kulang ng mixer. Kung imamano mano pa ang
paghahalo ng semento matatagalan talaga ang duration.
Pagdating naman sa materyales, kapag naman mura yung nabili o substandard, mas prone
yun sa error at maaring magcause ng abala.
THUS
Pag taas naman ng cost dapat mas mababantayan ang construction dahil pagdami ng
tauhan sa project eh mas marami possible na tumambay lang o magpatama ng oras. Kapag
di nabantayan nang maayos bumababa naman yung productivity rate ng project.
17th slide
yung choice A pinaka mataas ang cost at pinaka maikli ang duration. Mapapabilis yung
pagtapos nung project while yung choice D mababa yung cost pero mahaba naman ang
duration o mapapatagal yung project.
Yung B at C nmn Advisable kasi Napababa din yung duration pero tumaas din cost di lang
kasing mahal at kasing bilis ng crash cost.
Sa huli Dipende na sa construction manager kung anong swak sa budget ang oras nila.