95,000.00
80,000.00
300,000.00
30,000.00
NO Urut 1
TOTAL HARGA
NO URAIAN PEKERJAAN HARGA SATUAN Sat Vol Vol
(Rp) Rutilahu Swadaya RUTILAHU
I PEKERJAAN PERSIAPAN
Bongkar Rumah Lama Ls
II PEKERJAAN ATAP
Kuda-kuda dan Rangka Atap (Kayu) - - -
II Kayu Balok Lokal (10cmx10cmx3m) 75,000.00 Btg 19.00 - 1,425,000.00
Kayu Gordeng Lokal (5cmx10cmx3m) 38,000.00 Btg 20.00 - 760,000.00
II Bata Merah 5 x 11 22 cm 750.00 Btg 83.00 - 62,250.00
Paku Campur 16,000.00 Kg - 6.00 -
II Bata Ringan (Hebel) uk. 10x20x60
Reng Baja Ringan - Btg - - -
II Sekrup Baja Ringan - Bh - - -
Besi Beton Φ 8 mm 50,000.00 Bh - - -
II Besi beton Φ 10 mm
Bubung Genteng Metalroof - M' - - -
II Paku Campur 16,000.00 Kg - - -
PEKERJAAN PLAFOND
II Kayu Kaso Lokal (5cmx5cmx3m) 17,500.00 Btg 32.00 - 560,000.00
GRC ( 1,20 x 2,40 ), 4 mm - Lbr 10.00 - -
II Pasang Pondasi Batu Kali
Batu Belah Pondasi - M3 - - -
II Besi Φ 10 mm - Btg - - -
Besi Φ 6 mm - Btg - - -
II Semen @ 40 kg 49,000.00 Sak - - -
Kolom (10 cm x 15 cm x 300 cm) Beton
II Besi Φ 10 mm - Btg 6.00 - -
Besi Φ 8 mm - Btg 5.00 - -
II Besi Φ 10 mm - Btg 8.00 - -
Besi Φ 8 mm - Btg 6.00 - -
II Besi Φ 6 mm - Btg - - -
Pasir Beton 250,000.00 M3 0.20 - 50,000.00
II Batu pecah 2/3 265,000.00 M3 0.30 - 79,500.00
Papan Lokal (1,5cmx20cmx3m) - Lbr - 15.00 -
Kawat Beton 25,000.00 Kg - 1.00 -
5 Perbaikan Dinding dan Ampig
Batu Bata 750.00 Bh - - -
Batako 1,000.00 Bh 380.00 - 380,000.00
Hebel - M3 - - -
Pasir Pasang 200,000.00 M3 - -
Semen @ 40 kg 49,000.00 Sak 1.00 - 49,000.00
Kalsit 15,000.00 Sak 6.00 - 90,000.00
Mortar (Perekat Bata Ringan) 105,000.00 Sak - - -
6 Pekerjaan Dinding Bilik /Papan
Kayu Balok Lokal (10cmx10cmx3m) 75,000.00 Btg - - -
Kayu Gordeng Lokal (5cmx10cmx3m) 38,000.00 Btg - - -
Papan Lokal (2cmx20cmx3m) - Lbr - - -
Bilik - M2 - - -
Paku Campur 16,000.00 Kg - - -
7 Pekerjaan Kusen pintu dan Jendela
1 Kusen Pintu dan Jendela
Kusen Pintu 240,000.00 Bh 2.00 1.00 480,000.00
Kusen Jendela 1 240,000.00 Bh 4.00 1.00 960,000.00
Kusen Jendela 2 ( Gendong ) - Bh - - -
Glass block - Bh
Beton Rooster uk. 20x20 15,000.00 Bh 19.00 - 285,000.00
Bouvenlight 180,000.00 Bh - - -
2 Daun Pintu dan Jendela
Daun Pintu Panel Kayu 580,000.00 Bh 2.00 1.00 1,160,000.00
Daun Jendela 1+Kaca 5mm 275,000.00 Bh 4.00 1.00 1,100,000.00
Kaca polos 5 mm 170,000.00 M2 - - -
3 Engsel Pintu Biasa Seis Besar - Set - 6.00 -
4 Engsel Jendela Kuningan - Set - 10.00 -
5 Kunci Pintu Seis type Kecil - Bh - 3.00 -
6 Kunci Slot Jendela - Bh - 10.00 -
8 Pekerjaan Plesteran
Pasir Pasang 200,000.00 M3 1.00 1.00 200,000.00
Semen @ 40 kg 49,000.00 Sak 10.00 2.00 490,000.00
9 Pekerjaan Acian
Semen @ 40 kg 49,000.00 Sak 4.00 - 196,000.00
10 Pekerjaan Pengecatan
Cat Tembok setara romatex @ 5kg - Gln - 6.00 -
Cat Kayu - Kg - 2.00 -
V PEKERJAAN LANTAI
1 Lantai rabat t= 5 cm
Semen @ 40 kg 49,000.00 Sak 5.00 - 245,000.00
Pasir Pasang 200,000.00 M3 1.00 - 200,000.00
Keramik Polos 40X40 57,500.00 M2 27.00 7.00 1,552,500.00
2 Pekerjaan Lantai Papan
Kayu Balok Lokal (10cmx10cmx3m) 75,000.00 Btg - - -
Kayu Gordeng Lokal (5cmx10cmx3m) 38,000.00 Btg - - -
Papan Lokal (3cmx20cmx3m) - Lbr - - -
Paku Campur 16,000.00 Kg - - -
VI MCK dan lain-lain
Pintu PVC 270,000.00 Bh 1.00 - 270,000.00
Closet Jongkok 170,000.00 Bh 1.00 - 170,000.00
Pipa paralon PVC ( D ) Dia. 3'' 95,000.00 Btg 1.00 - 95,000.00
Pipa paralon PVC Dia. 1/2'' - Btg - 1.00 -
#NAME? - Bh - 1.00 -
VII Upah Kerja
Tukang 95,000.00 Oh 4.00 14.00 380,000.00
Pekerja 80,000.00 Oh 4.00 14.00 320,000.00
Konsumsi 30,000.00 Ls - - -
VIII Admnistrasi
Administrasi 300,000.00 Ls 1.00 - 300,000.00
Jumlah : 11,859,250.00
TOTAL HARGA
SWADAYA
Gotong Royong
-
-
-
-
96,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
25,000.00
-
-
-
-
-
-
-
-
-
-
-
-
240,000.00
240,000.00
-
-
-
580,000.00
275,000.00
-
-
-
-
-
200,000.00
98,000.00
-
-
-
-
-
-
-
402,500.00
-
-
-
-
-
-
-
-
-
1,330,000.00
1,120,000.00
-
-
4,606,500.00
FORMULIR
RENCANA ANGGARAN BIAYA (RAB) RUTILAHU
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME (Rp) TOTAL HARGA (Rp)
I PEKERJAAN PERSIAPAN
Bongkar Rumah Lama Ls
II PEKERJAAN ATAP
1 Kuda-kuda dan Rangka Atap (Kayu) Err:509 - Err:509
Kayu Balok Lokal (10cmx10cmx3m) Err:509 Btg 75,000.00 Err:509
Kayu Gordeng Lokal (5cmx10cmx3m) Err:509 Btg 38,000.00 Err:509
Kayu Kaso Lokal (5cmx5cmx3m) Err:509 Btg 17,500.00 Err:509
Kayu Reng Lokal (2cmx3cmx3m) Err:509 Btg 4,500.00 Err:509
Paku Campur Err:509 Kg 16,000.00 Err:509
2 Kuda-kuda dan Rangka Atap (Baja Ringan) Err:509 - Err:509
Baja Ringan Canal C Err:509 Btg - Err:509
Reng Baja Ringan Err:509 Btg - Err:509
Sekrup Baja Ringan Err:509 Bh - Err:509
Sekrup Reng Err:509 Bh - Err:509
Baud Dinabold Err:509 Bh - Err:509
3 Penutup Atap Err:509 - Err:509
Genteng palentong Err:509 Bh 1,700.00 Err:509
Bubung Genteng Palentong Err:509 Bh 2,500.00 Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
Pasir Pasang Err:509 M3 200,000.00 Err:509
Papan Lokal (2cmx20cmx3m) Err:509 Lbr - Err:509
Paku Campur Err:509 Kg 16,000.00 Err:509
4 Penutup Atap (Metal Roof) Err:509 - Err:509
Genteng Metalroof Err:509 Lbr - Err:509
Bubung Genteng Metalroof Err:509 M' - Err:509
Scrup Genteng Err:509 Bh - Err:509
5 Pekerjaan Lisplank Err:509 - Err:509
Papan Lokal (3cmx20cmx3m) Err:509 Lbr - Err:509
Paku Campur Err:509 Kg 16,000.00 Err:509
III PEKERJAAN PLAFOND Err:509 - Err:509
Kayu Kaso Lokal (5cmx5cmx3m) Err:509 Btg 17,500.00 Err:509
GRC ( 1,20 x 2,40 ), 4 mm Err:509 Lbr - Err:509
List profil 1 x 5 cm Err:509 Btg - Err:509
Paku GRC Err:509 Dus - Err:509
IV PEKERJAAN DINDING Err:509 - Err:509
1 Pasang Pondasi Batu Kali Err:509 - Err:509
Pasir Pasang Err:509 M3 200,000.00 Err:509
Batu Belah Pondasi Err:509 M3 - Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
2 Sloof (15 cm x 20 cm) di atas Batu Tapak Err:509 - Err:509
Besi Φ 10 mm Err:509 Btg - Err:509
Besi Φ 8 mm Err:509 Btg - Err:509
Besi Φ 6 mm Err:509 Btg - Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
Pasir Beton Err:509 M3 250,000.00 Err:509
Batu pecah 2/3 Err:509 M3 265,000.00 Err:509
3 Kolom (10 cm x 15 cm x 300 cm) Beton Err:509 - Err:509
Besi Φ 10 mm Err:509 Btg - Err:509
Besi Φ 8 mm Err:509 Btg - Err:509
Besi Φ 6 mm Err:509 Btg - Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
Pasir Beton Err:509 M3 250,000.00 Err:509
Batu pecah 2/3 Err:509 M3 265,000.00 Err:509
4 Ring Balok (15 cm x 15 cm) Beton Err:509 - Err:509
Besi Φ 10 mm Err:509 Btg - Err:509
Besi Φ 8 mm Err:509 Btg - Err:509
Besi Φ 6 mm Err:509 Btg - Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
Pasir Beton Err:509 M3 250,000.00 Err:509
Batu pecah 2/3 Err:509 M3 265,000.00 Err:509
Papan Lokal (1,5cmx20cmx3m) Err:509 Lbr - Err:509
Kawat Beton Err:509 Kg 25,000.00 Err:509
5 Perbaikan Dinding dan Ampig Err:509 - Err:509
Batu Bata Err:509 Bh - Err:509
Batako Err:509 Bh 1,000.00 Err:509
Hebel Err:509 M3 - Err:509
Pasir Pasang Err:509 M3 200,000.00 Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
Kalsit Err:509 Sak 15,000.00 Err:509
Mortar (Perekat Bata Ringan) Err:509 Sak 105,000.00 Err:509
6 Pekerjaan Dinding Bilik /Papan Err:509 - Err:509
Kayu Balok Lokal (10cmx10cmx3m) Err:509 Btg 75,000.00 Err:509
Kayu Gordeng Lokal (5cmx10cmx3m) Err:509 Btg 38,000.00 Err:509
Papan Lokal (2cmx20cmx3m) Err:509 Lbr - Err:509
Bilik Err:509 M2 - Err:509
Paku Campur Err:509 Kg 16,000.00 Err:509
7 Pekerjaan Kusen pintu dan Jendela Err:509 - Err:509
1 Kusen Pintu dan Jendela Err:509 - Err:509
Kusen Pintu Err:509 Bh 240,000.00 Err:509
Kusen Jendela 1 Err:509 Bh 240,000.00 Err:509
Kusen Jendela 2 ( Gendong ) Err:509 Bh - Err:509
Glass block Err:509 Bh - Err:509
Beton Rooster uk. 20x20 Err:509 Bh 15,000.00 Err:509
Bouvenlight Err:509 Bh 180,000.00 Err:509
2 Daun Pintu dan Jendela Err:509 - Err:509
Daun Pintu Panel Kayu Err:509 Bh 580,000.00 Err:509
Daun Jendela 1+Kaca 5mm Err:509 Bh 275,000.00 Err:509
Kaca polos 5 mm Err:509 M2 170,000.00 Err:509
3 Engsel Pintu Biasa Seis Besar Err:509 Set - Err:509
4 Engsel Jendela Kuningan Err:509 Set - Err:509
5 Kunci Pintu Seis type Kecil Err:509 Bh - Err:509
6 Kunci Slot Jendela Err:509 Bh - Err:509
8 Pekerjaan Plesteran Err:509 - Err:509
Pasir Pasang Err:509 M3 200,000.00 Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
9 Pekerjaan Acian Err:509 - Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
10 Pekerjaan Pengecatan Err:509 - Err:509
Cat Tembok setara romatex @ 5kg Err:509 Gln - Err:509
Cat Kayu Err:509 Kg - Err:509
V PEKERJAAN LANTAI Err:509 - Err:509
1 Lantai rabat t= 5 cm Err:509 - Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
Pasir Pasang Err:509 M3 200,000.00 Err:509
Keramik Polos 40X40 Err:509 M2 57,500.00 Err:509
2 Pekerjaan Lantai Papan Err:509 - Err:509
Kayu Balok Lokal (10cmx10cmx3m) Err:509 Btg 75,000.00 Err:509
Kayu Gordeng Lokal (5cmx10cmx3m) Err:509 Btg 38,000.00 Err:509
Papan Lokal (3cmx20cmx3m) Err:509 Lbr - Err:509
Paku Campur Err:509 Kg 16,000.00 Err:509
VI MCK dan lain-lain Err:509 - Err:509
Pintu PVC Err:509 Bh - Err:509
Closet Jongkok Err:509 Bh 170,000.00 Err:509
Pipa paralon PVC ( D ) Dia. 3'' Err:509 Btg 95,000.00 Err:509
Pipa paralon PVC Dia. 1/2'' Err:509 Btg - Err:509
Kran dia 1/2 Err:509 Bh - Err:509
VII Upah Kerja Err:509 - Err:509
Tukang Err:509 Oh 95,000.00 Err:509
Pekerja Err:509 Oh 80,000.00 Err:509
Konsumsi Err:509 Ls 30,000.00 Err:509
VIII Admnistrasi Err:509 - Err:509
Administrasi Err:509 Ls 300,000.00 Err:509
Jumlah : Err:509
Diverifikasi oleh,
Fasilitator
( ………………………... )
Diketahui Oleh,
Tim Teknis Kab.Purwakarta
TOTAL HARGA
RUTILAHU SWADAYA
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Purwakarta, 2019
Ketua LPM Desa ………….
( ………………….. )
Disahkan :
Koordinator Fasilitator
HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN (Rp) TOTAL HARGA (Rp)
I PEKERJAAN PERSIAPAN
Bongkar Rumah Lama Ls
II PEKERJAAN ATAP
1 Kuda-kuda dan Rangka Atap (Kayu) Err:509 - Err:509
Kayu Balok Lokal (10cmx10cmx3m) Err:509 Btg 75,000.00 Err:509
Kayu Gordeng Lokal (5cmx10cmx3m) Err:509 Btg 38,000.00 Err:509
Kayu Kaso Lokal (5cmx5cmx3m) Err:509 Btg 17,500.00 Err:509
Kayu Reng Lokal (2cmx3cmx3m) Err:509 Btg 4,500.00 Err:509
Paku Campur Err:509 Kg 16,000.00 Err:509
2 Kuda-kuda dan Rangka Atap (Baja Ringan) Err:509 - Err:509
Baja Ringan Canal C Err:509 Btg - Err:509
Reng Baja Ringan Err:509 Btg - Err:509
Sekrup Baja Ringan Err:509 Bh - Err:509
Sekrup Reng Err:509 Bh - Err:509
Baud Dinabold Err:509 Bh - Err:509
3 Penutup Atap Err:509 - Err:509
Genteng palentong Err:509 Bh 1,700.00 Err:509
Bubung Genteng Palentong Err:509 Bh 2,500.00 Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
Pasir Pasang Err:509 M3 200,000.00 Err:509
Papan Lokal (2cmx20cmx3m) Err:509 Lbr - Err:509
Paku Campur Err:509 Kg 16,000.00 Err:509
4 Penutup Atap (Metal Roof) Err:509 - Err:509
Genteng Metalroof Err:509 Lbr - Err:509
Bubung Genteng Metalroof Err:509 M' - Err:509
Scrup Genteng Err:509 Bh - Err:509
5 Pekerjaan Lisplank Err:509 - Err:509
Papan Lokal (3cmx20cmx3m) Err:509 Lbr - Err:509
Paku Campur Err:509 Kg 16,000.00 Err:509
III PEKERJAAN PLAFOND Err:509 - Err:509
Kayu Kaso Lokal (5cmx5cmx3m) Err:509 Btg 17,500.00 Err:509
GRC ( 1,20 x 2,40 ), 4 mm Err:509 Lbr - Err:509
List profil 1 x 5 cm Err:509 Btg - Err:509
Paku GRC Err:509 Dus - Err:509
IV PEKERJAAN DINDING Err:509 - Err:509
1 Pasang Pondasi Batu Kali Err:509 - Err:509
Pasir Pasang Err:509 M3 200,000.00 Err:509
Batu Belah Pondasi Err:509 M3 - Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
2 Sloof (15 cm x 20 cm) di atas Batu Tapak Err:509 - Err:509
Besi Φ 10 mm Err:509 Btg - Err:509
Besi Φ 8 mm Err:509 Btg - Err:509
Besi Φ 6 mm Err:509 Btg - Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
Pasir Beton Err:509 M3 250,000.00 Err:509
Batu pecah 2/3 Err:509 M3 265,000.00 Err:509
3 Kolom (10 cm x 15 cm x 300 cm) Beton Err:509 - Err:509
Besi Φ 10 mm Err:509 Btg - Err:509
Besi Φ 8 mm Err:509 Btg - Err:509
Besi Φ 6 mm Err:509 Btg - Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
Pasir Beton Err:509 M3 250,000.00 Err:509
Batu pecah 2/3 Err:509 M3 265,000.00 Err:509
4 Ring Balok (15 cm x 15 cm) Beton Err:509 - Err:509
Besi Φ 10 mm Err:509 Btg - Err:509
Besi Φ 8 mm Err:509 Btg - Err:509
Besi Φ 6 mm Err:509 Btg - Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
Pasir Beton Err:509 M3 250,000.00 Err:509
Batu pecah 2/3 Err:509 M3 265,000.00 Err:509
Papan Lokal (1,5cmx20cmx3m) Err:509 Lbr - Err:509
Kawat Beton Err:509 Kg 25,000.00 Err:509
5 Perbaikan Dinding dan Ampig Err:509 - Err:509
Batu Bata Err:509 Bh - Err:509
Batako Err:509 Bh 1,000.00 Err:509
Hebel Err:509 M3 - Err:509
Pasir Pasang Err:509 M3 200,000.00 Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
Kalsit Err:509 Sak 15,000.00 Err:509
Mortar (Perekat Bata Ringan) Err:509 Sak 105,000.00 Err:509
6 Pekerjaan Dinding Bilik /Papan Err:509 - Err:509
Kayu Balok Lokal (10cmx10cmx3m) Err:509 Btg 75,000.00 Err:509
Kayu Gordeng Lokal (5cmx10cmx3m) Err:509 Btg 38,000.00 Err:509
Papan Lokal (2cmx20cmx3m) Err:509 Lbr - Err:509
Bilik Err:509 M2 - Err:509
Paku Campur Err:509 Kg 16,000.00 Err:509
7 Pekerjaan Kusen pintu dan Jendela Err:509 - Err:509
1 Kusen Pintu dan Jendela Err:509 - Err:509
Kusen Pintu Err:509 Bh 240,000.00 Err:509
Kusen Jendela 1 Err:509 Bh 240,000.00 Err:509
Kusen Jendela 2 ( Gendong ) Err:509 Bh - Err:509
Glass block Err:509 Bh - Err:509
Beton Rooster uk. 20x20 Err:509 Bh 15,000.00 Err:509
Bouvenlight Err:509 Bh 180,000.00 Err:509
2 Daun Pintu dan Jendela Err:509 - Err:509
Daun Pintu Panel Kayu Err:509 Bh 580,000.00 Err:509
Daun Jendela 1+Kaca 5mm Err:509 Bh 275,000.00 Err:509
Kaca polos 5 mm Err:509 M2 170,000.00 Err:509
3 Engsel Pintu Biasa Seis Besar Err:509 Set - Err:509
4 Engsel Jendela Kuningan Err:509 Set - Err:509
5 Kunci Pintu Seis type Kecil Err:509 Bh - Err:509
6 Kunci Slot Jendela Err:509 Bh - Err:509
8 Pekerjaan Plesteran Err:509 - Err:509
Pasir Pasang Err:509 M3 200,000.00 Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
9 Pekerjaan Acian Err:509 - Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
10 Pekerjaan Pengecatan Err:509 - Err:509
Cat Tembok setara romatex @ 5kg Err:509 Gln - Err:509
Cat Kayu Err:509 Kg - Err:509
V PEKERJAAN LANTAI Err:509 - Err:509
1 Lantai rabat t= 5 cm Err:509 - Err:509
Semen @ 40 kg Err:509 Sak 49,000.00 Err:509
Pasir Pasang Err:509 M3 200,000.00 Err:509
Keramik Polos 40X40 Err:509 M2 57,500.00 Err:509
2 Pekerjaan Lantai Papan Err:509 - Err:509
Kayu Balok Lokal (10cmx10cmx3m) Err:509 Btg 75,000.00 Err:509
Kayu Gordeng Lokal (5cmx10cmx3m) Err:509 Btg 38,000.00 Err:509
Papan Lokal (3cmx20cmx3m) Err:509 Lbr - Err:509
Paku Campur Err:509 Kg 16,000.00 Err:509
VI MCK dan lain-lain Err:509 - Err:509
Pintu PVC Err:509 Bh - Err:509
Closet Jongkok Err:509 Bh 170,000.00 Err:509
Pipa paralon PVC ( D ) Dia. 3'' Err:509 Btg 95,000.00 Err:509
Pipa paralon PVC Dia. 1/2'' Err:509 Btg - Err:509
#NAME? Err:509 Bh - Err:509
VII Upah Kerja Err:509 - Err:509
Tukang Err:509 Oh 95,000.00 Err:509
Pekerja Err:509 Oh 80,000.00 Err:509
Konsumsi Err:509 Ls 30,000.00 Err:509
VIII Admnistrasi Err:509 - Err:509
Administrasi Err:509 Ls 300,000.00 Err:509
Jumlah : Err:509
Diverifikasi oleh,
Fasilitator Penerima Manfaat
( ………………………... ) (…………………………….)
Diketahui Oleh,
Tim Teknis Kab.Purwakarta
TOTAL HARGA
RUTILAHU SWADAYA
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Purwakarta, 2019
Ketua LPM Desa ………….
( ………………….. )
Disahkan :
Koordinator Fasilitator
HARGA SATUAN
NO URAIAN PEKERJAAN Sat
(Rp)
HARGA SATUAN
NO URAIAN PEKERJAAN Sat
(Rp)