INSTRUCTIONS

INTEGRATION COST TIME SCOPE

4.1 Develop Project Charter 7.1 Plan Cost Management 6.1 Plan Schedule 5.5 Validate Scope 1. Print this sheet in the same
Management paper size of your printed
“canvas” file.
INTEGRATION COST TIME SCOPE
For instance, if you print the
4.2 Develop Project 7.2 Estimate Costs 6.2 Define Activities 5.6 Control Scope “canvas” file using the A3 format,
Management Plan print this file also in A3, otherwise
you will get different sizes and
INTEGRATION COST TIME PROCUREMENT these processes will not fit on the
canvas, they will be either smaller
4.3 Direct and Manage 7.3 Determine Budget 6.3 Sequence Activities 12.1 Plan Procurement or bigger.
Project Work Management
2. Cut the processes using the
INTEGRATION COST TIME PROCUREMENT dashed lines as guidance.

4.4 Monitor and Control 7.4 Control Costs 6.4 Estimate Activity 12.2 Conduct Procurements
Project Work Resources 3. Use, if you can, a double-sided
tape to fix the processes on the
canvas.
INTEGRATION QUALITY TIME PROCUREMENT

4.5 Perform Integrated 8.1 Plan Quality Management 6.5 Estimate Activity 12.3 Control Procurements
Based on the PMBOK® Guide 5th Edition
Change Control Durations (English Version)
Copyright: Project Management Institute,
A Guide to the Project Management Body
of Knowledge - Fifth Edition (PMBOK®
INTEGRATION QUALITY TIME PROCUREMENT Guide), Project Management Institute, Inc.,
(2013). Copyright and all rights reserved.
4.6 Close Project or Phase 8.2 Perform Quality Assurance 6.6 Develop Schedule 12.4 Close Procurements The material from this publication has been
reproduced with the permission of PMI.
Adaptation: Ricardo Viana Vargas, MSc,
CSM, PRINCE2® Practitioner, PMI-RMP, PMI-SP,
STAKEHOLDER QUALITY TIME
PMP
Review: Wagner Maxsen, Kaplan-Norton
13.1 Identify Stakeholders 8.3 Control Quality 6.7 Control Schedule BSC Certified Graduate, PMP, PRINCE2
Practitioner, PMI-RMP
Graphic Design: Sérgio Jardim, PMP
STAKEHOLDER RISK COMMUNICATIONS

13.2 Plan Stakeholder 11.1 Plan Risk Management 10.1 Plan Communications
Management Management

STAKEHOLDER RISK COMMUNICATIONS

13.3 Manage Stakeholder 11.2 Identify Risks 10.2 Manage Communications


Engagement

STAKEHOLDER RISK COMMUNICATIONS

13.4 Control Stakeholder 11.3 Perform Qualitative 10.3 Control Communications


Engagement Risk Analysis

HUMAN RESOURCE RISK SCOPE

9.1 Plan Human Resource 11.4 Perform Quantitative 5.1 Plan Scope Management
Management Risk Analysis

HUMAN RESOURCE RISK SCOPE

9.2 Acquire Project Team 11.5 Plan Risk Responses 5.2 Collect Requirements

HUMAN RESOURCE RISK SCOPE

9.3 Develop Project Team 11.6 Control Risks 5.3 Define Scope

HUMAN RESOURCE SCOPE

9.4 Manage Project Team 5.4 Create WBS