Nigeria 3 story structure

Installation
3 Days completion

1
Architecture Drawing

2
Structure & Floor Lay out

3
Structure Analysis

4
Day 1 Pre-Installation

5
Day 2 Hoisting

6
Day 2 Hoisting & Installation

7
Day 2 Connection Detail

8
Bolt & Nut Connection

9
Day 3 Steel stair Installation

10
Day 3 Completed Installation

11