You are on page 1of 4
Office of Project Director Urban Infrastructure Development Project (Unit of RUDSICO) AVS Building, Jawahar Circle, JLN Marg, Jaipur - 302017 Tel No.: 141 2721966, Fax No.: 141 2721919, email : mailruidp@gmail.com, mail.ruidp@rajasthan.gov.in web site : wwew.ruidp.rajasthan.gov.in No. F3 (201)(19}(4)/RUIODP/PMU/Ph-I1I/Pali-Generai/ 173 Date: 65.03.2021 — Site Visit Report A site visit of Pali town was conducted by Chief Engineer PMU, Jaipur along with Additional Chief Engineer & Assistant Engineer, PMU, Jaipur from dated 01.03.2021 to 02.03.2021 to review the progress under contract package RUSDP/Pali/01 & RUSDP/Pali/02 and Pali/03. Followings officials were present during the site visit: + Sh. Narendra Ajmera, Additional Chief Engineer, RUIDP, Jaipur. * Sh. Anil Vijaywargiya, Executive Engineer, RUIDP, Pali along with PIU team * Sh. Rohit Jangid, Assistant Engineer PMU RUIDP, Jaipur. * Sh. Ashok kumar Negi. Assistant Construction Manager, PMDSC, Pali along with PMDSC team. Sh. Devendra Singhal, Sr. Construction Engineer PMDSC Pali Sh. C P Rajesh, Project manager, M/s L&T Limited along with their team. Sh, Jitesh Rathi Project manager, M/s VPRPL along with their team (A) Package - Pali/01 ( M/s L & T Constructions) 1. Package Pali-01 progress is quite disappointing. The stipulated date of start of work was 02-11-2015 and stipulated date of completion of design and Build (1095 days) work was 31-10-2018 and from this date alone, quite a number of times, the extension requested by the firm M/S L&T Construction has been allowed and given. The last extension was granted by the Superintending Engineer PIU Pali wide letter No. RUIDP/PIU/Pali/2020/ 2476 dated 01-10- 2020. It is also pertinent to mention the request from the firm M/S L&T Construction vide their letter No LTCD/ISW-PALI/WET/WW/CPR/2020- 21/2676 dated 01-10-2020 in which the firm have not proposed the final date of completion which is not appropriate because it is the firm who has to inform the employer by which date they intend to complete the work. 2. In the opinion of the undersigned, the firm will not be able to complete the work by 30-04-2021 unless the firm takes effective and earnest measures to complete the work by the extended completion date i.e. 30-04-2021. 3. In whole site visit, it has been found that there is not an iota of effective and earnest effort of the firm M/S L&T Construction to complete the work in agreed extended date. It has been found that various allied works are pending due to non-availability of material viz. inspection chambers, manholes, HSC Pipes, DI pipe specials, electro-mechanical items of SPS. This shows clear negligence and laches on the part of contractor M/S L&T constructions. 4. Itis opined that if any further time extension is allowed or agreed, it must be at the mutually agreed date and this date must be fully abide by M/S L&T Construction in full letter and spirit. Pali site visit report Page 1 5. The ongoing work of SPS at Sarvodaya Nagar was visited and it has been found that the progress of the work is quite poor. RCC work was in progress. Also the boundary wall construction was in progress, wherein it has been found that the quality of construction was quite poor. Poor quality work of RR masonry was being done wherein the mortar quality was quite poor and the joints of the masonry were widely spaced and the stones were loosely placed. The directions were given to complete the work in qualitative and time bound manner and all approval and procurement of Electro-mechanical equipment’s must be ensured at the earliest. It is also pertinent to mention that the Pumping main from SPS Sarvodaya Nagar to SBI Chourarha, DI K-7 pipe 250mm dia has not been procured yet by the firm M/S L&T constructions for which displeasure was shown and it shows laches and negligence on the part of the firm. 6. The finishing work of CRMC/ CCC buildings were in progress and direction were given to complete these works at the earliest. 7. There have been major gaps, laches and negligence on the part of M/S L&T Constructions in restoring the road cuts for which there has been many news in the local newspapers and local administrations and representative has raised serious concerns as revealed in the discussions with PIU officials. 8. The ongoing road restoration works in Bapu nagar Vistar inspected and found that the work was not as per specification despite the presence of quality engineer and site engineer of M/S L&T constructions. Directions were given to correct the work as per the terms of the contract. 9. The issue of variation of inspection chambers was raised by project manager of the firm. He stressed that there would be additional requirement of 8000 more inspection chambers from the approved SIP. It was revealed during discussion that about 52000 thousand water connections are there in the town, and the same may be construed for house sewer connection. There are about 8000 house sewer connections in UIDSSMT works for which the works of HSC was entrusted to Municipal Council Pali who in turn are executing the work through M/S Tata Construction Company out of which work of 5500 connections have been completed. Therefore, there remains only 44000 connections and there are already 44691 connections in the SIP and the progress as submitted by PIU is for 42719 connections. Therefore, it is strange that the project manager is demanding variation of additional 8000 n chambers. The Employer representative, SE and EE PIU must look into this matter and ensure that the work be got completed in extended completion date i.e. 30-04-2021. If further requirement is required, the same shall be fulfilled mostly by IC of smaller size i.e. 300 mm dia and depth 450mm wherever practicable, elsewhere depth of outlet house is more, IC of Pali site visit report Page 2 size dia 450mm and depth 600 mm may be used for ensuring the timely completion. 10. It has been observed that at various locations levels of manholes/Inspection chambers are not matching with road levels causing inconvenience to public. It was, directed to Project Manager L&T to prepare complete list of manholes/Inspection chambers in excel sheet showing level w.r.to road level. Project manager assured to submit the list of 10000 manholes survey report by 08.03.2021 & balance by 12.03.2021. The rectification work shall be taken up from 05.03.2021 and shall be completed before 20.03.2021 positively. 11. It was deliberated by L&T that quantities of MS specials of 7.80 MT taken in BOQ has already been exhausted. The quantity considered in approved SIP is 21.0 MT and further to complete balance work additional 6.0 MT will be required. After detailed deliberation it was in principally agreed and directed to start the work. 12. Contractor was directed to ensure proper quality, safety norms & housekeeping during the execution of works. Any type of slackness regarding quality & safety will not be tolerated at any level. 13. It has been instructed that there will be zero tolerance against negligence of safety measures and ensure adequate barricading at all fronts. Also, directed that all PPE must be followed without fail. 14. It was also informed that the compliance of the instructions issued by Additional Project Director vide Minutes of meeting —_No. F3(201)(60)/RUIDP/PMU/Ph-III/MON/13563 dated 22-02-2021 have not been made for which displeasure was shown and instructed to submit the compliance report within 2 days. It is also pertinent to mention that the report of the DMAs are not being properly furnished. Report of only 8 DMAS have been furnished out of which 6 DMAs report is not acceptable owing to their higher NRW levels grater than 7. It was directed to ensure compliance of the guidelines issued from time to time and ensure NRW level within contractual provisions. (B) Package - Pali/02 ( M/s Vishnu Prakash R Pungalia Ltd) 1. The rehabilitation work of two OHSRS (Mandli & Batwara), could not be taken up due to structurally unsafe as reported by MNIT. The matter has already been forwarded to PMDSC for alternate arrangement in lieu of report from MNIT. ATL PMDSC was directed to look into the matter and submit the alternate proposal for the same with technical recommendation. —_—_$_[__— Pali site visit report Page 3 (C) Package 3 - Pali/03 (M/S R & B Infra Projects Pvt. Ltd.) 1. This work has been entrusted to Municipal Council Pali, and the progress of the work is quite slow for which directions were given to expedite the work ‘on war footing. It was appraised by Shri Sukh Ram Chodhary Executive Engineer Municipal Council Pali and Shri Yogesh Prajapati Junior Engineer that 3 notices have already been issued to the firm for slow progress. It was directed to read the contract provisions and initiate action if the contractor fails to expedite the work within next 7 days. The firm’s representative Mr. Nadeem Khan gave assurance to expedite the work by executing 100 house sewer connections per day within a week and afterwards increasing the pace of the work. 2. A meeting was also held with Municipal Commissioner Municipal Council Pali at Town Hall to resolve the issue of handing over the 62 KM sewer network laid under UIDSSMT package (on Risk & Cost by GCKC). The issue of blockage at some points was raised for which it was agreed that this issue will be resolved by RUIDP and then Municipal Council Pali will take over the network. The tender for O&M of is also going to be issued by Municipal Council Pali for which Executive Engineer RUIDP was instructed to provide desired technical assistance in the preparation of bid document and tendering. The Commissioner MC Pali informed that 5500 HSC have been completed by them for which UC to RUIDP has been sent. He stressed for releasing the second instalment so as to keep the pace of the work. cal Chief Engineer No-1yt4- go RUIDP, Jaipur Copy to following for information & necessary action: Dak -os|o3/s 02) 1. PS to Secretary, LSGD. 2. PA to Project Director, RUIDP, Jaipur 3. APD/FA/CE/ACE/JLR, RUIDP, Jaipur. 4. Addl. Chief Engineer-I,(City In-charge) Pali 5. Superintending Engineer, RUIDP, Pali- For ensuring the same as above. 6. ATL, PMDSC-Jaipur. 7. Employer Representative, PMDSC, Pali - For ensuring the same as above. 8. M/s L&T LTD. -For immediate action. 9. M/s VPRP Ltd- For immediate action. ee Additional Chief Engineer RUIDP, Jaipur Pali site visit report Page 4

You might also like