Accomplishment Report

DATE TASKS
December 11, 2020 8:00 – 8:30 Checked pump at 7-2
8:30 – 3:00 Repaired aircon at inn 1
Repaired intercom at F.O., rm. 208, 207 & 112
December 12, 2020 8:00 – 8:30 Checked pump at 7-2
8:30 – 3:00 Replaced intercom at Stockroom
Repaired intercom at staff house, HR, CCTV room
December 13, 2020 8:00 – 8:30 Checked pump at 7-2
8:30 – 2:00 repaired perimeter light at 7-6
Repaired aircon at rm. 305
Assisted Bureau of Fire inspection
December 14, 2020 8:00 – 8:30 Checked pump at 7-2
8:30 – 12:00 Replaced door knob in the office of engineer
Assisted plumber in repairing leak at La Marea and
Kitchen

Prepared by:

JONATHAN ALBARDA