You are on page 1of 2

Estates Operations

Imperial College London


South Kensington Campus
London, SW7 2AZ
Minor Works’ Projects Summary of Installation

Job Title:

Project Number:
Location of Works:
Requirement:

Purpose:

Date of Installation:
Supplier and quote #:
Manufacturer:
Name and contact details
Installer:
Name and contact details
H&S information:
Significant hazards,
maintenance strategy,
asbestos report, fire
strategy etc.
Materials Used:  
Include paint & product
codes where applicable.
Continue on next page if
necessary
Description of work:

Recommended
Inspection regime:
Recommended
maintenance regime:
Predicted useful  
lifespan:
As-built Drawings:
where applicable
Certificates:
where applicable
Warranty details:
where applicable

Reference:
RM.12 Minor Works’ Summary of Installation Revision Date: 03/12/2018
Estates Operations
Imperial College London
South Kensington Campus
London, SW7 2AZ

Additional Contractor’s or Manufacturer’s literature

Reference:
RM.12 Minor Works’ Summary of Installation Revision Date: 03/12/2018

You might also like