Standard Operating Procedures
‘AMember of
Integrated E1 =p DT
Waste Management Services Saad! (Cop URW SA,
Eco-System
Doc No: 200-CV-S113M/00
‘Subject: Engineering Design
Page: 1 of 6
Authorization
Name Title Date
Koji Kurokl President Director September 16, 2013
Syarif Hidayat | SHEQMR & Operation Director | September 16,2013"
2 4
WS
Kentaro Tomida | Engineering Department. Septegiber 46, 2013
& j
oy
Change Control
Description of Change Initial | Effective Date
00 vA
Revision ChafgGiDate [
Wl
New Procedure
KT | September 16, 2013
&
&
&
Prepared by: Kentaro Tomida
‘Approved by: Koj Kuroki
Effective date: Sep 16,2013 | Rev. No: 00Integrated Environmental
Waste Management Services
‘AMember of
Yow ra
Eco-System
Standard Operating Procedures
Doc No: 200-CV-$113M/00
‘Subject: Engineering Design Page: 2 of 6
4.0 Purpose 4.0 Tujuan
Defining design work requirement,
responsibilities and process.
2.0 Scope
This procedure shall be applied for all design
work by Engineering department includes bill
of quantity calculation, technical calculation,
drafting, and supporting design document,
3.0 User (Departments)
3.1 Management
32 Engineering Team
3.3 Operation Team
4.0 Responsibilities
41 Management is responsible to supervs
and to check design work of Engineering
Department.
42. Engineering Team is responsible ta énaire
that the design workflow is ee ing this
procedure.
43, Bporeton Team is resale Yo ftew
this procedure in giving wworkiorder and is
responsible to give > eyense to design
workresut, & =
5.0 Associated Reems
8.1 Work
a Engineering
eeArF¥Ent Coding System
faiderProsedur Operation Project
onstruction of Engineering Department
tion number 200-CV-S-W0014
Department
&
Menjabarkan atau mendefinisikan kebutuhan
pekerjaan desain, tanggung jawab dan proses:
&
2.0 Cakupan
Prosedur inl sebaiknya dlterapkan dalam semua
Pekerjaan desain oleh Depeftemen Engineering
mencekup perntunganc bil of quantiy,
Pehitungan — teknis,« cc Pehagembarsn, dan
pembuatan colar injang desain.
3.0 Pengguna (Dépardinent)
4 to-Tangaung Jawab
Oy
G24 Manajemen bertanggung jaweb untuk
mengawasi dan memeriksa pekerjaan
desain Departemen Engineering.
Tim Engineering bertanggung jawab untuk
‘memastikan alur pekerjaan desain sesuai
dengan prosedur ini
Tim’ Operation bertanggung jawab untuk
memberikan permintaan pekerjaan yang
sesual dengan standar prosedur ini dan
memberikan tanggapan terhadap has
Pekerjaan,
5.0 Dokumen Terkait
42
43
5.1 Instruksi Kerja nomor 200-CV-S-woo1d
tentang sistem pengkodean dokumen
Departemen Engineering
52 Standar Prosedur Operation Project
Construction of Engineering Department
Prepared by: Kentaro Tomida
‘Approved by: Koji Kuroki
Eocve dae: Sep 16,2073 | Rev. Nor 00_]