Grupo) AV EXAMEN FINAL DE CURSO - COSTOS Y PRESUPUESTOS - 2020 !
FECHA: 31.08 2020/ HORA: 11:45 AM- 19:15PM
PREGUNTA 01: SE TIENE LA SIGUIENTE RELACION DE INSUMOS DE UN PROYECTO DE SISTEMA DE AGUA
POTABLE, PARA LAS LOCALIDADES DE TANTACOTO Y PATAY RONDOS, EN EL DISTRITO DE MARIAS, PROVINCIA
DE DOS DE MAYO, DEPARTAMENTO DE HUANUCO. SIENDO EL. COSTO DE TRANSPORTE DEL CEMENTO DESDE
LAGIUDAD DE HUANUCO A LA LOCALIDAD DE TANTACOTO s!. 6.00 (97 km) Y DE HUANUCO A PATAY RONDOS
£8.00 (120 km). SIENDO NUESTRO CAMION DE CARGA DE 10 TN (750x2.60%3.50), CALCULAR EL FLETE TERRESTRE
EN NUMERO DE VIAJES. PARA PATAY RONDOS ES TODA EL INSUMO DE TUBERIA
Cantidad | Peso Uni. |” PesoParcial |
“499000| 4250 |
- 100 |
260 —_|
1500
_ _ 40.00 |
4000 |
- ia) |e
7000 |
21500 |
100 |
a) |
: 5.00 | |
900/60
9 7290000 1.00 |
eas Uned [Contd | Varun | verPeril |
_Mbo PVC ua reson GR C16 1960n und | _230400/ 00025] |
TWoPVC AguaPreson CRCL-0de15%50n | _und_| 289000) 00057 |
| Tube PVC Aaua Preson CR CL-10.de 25 Om “wed [ seera0 | oor] |
| Tuto PVC Desague Lana de 30m und 3120
Tuto PVG Aeantaila SN 2 ($25) de 1600-66 0m 176500
~Tubo PVC Aantal SN2($:25) do 200mm 860m 167300) 016}
PVC Alcantarilla SN 2 (S-25) de 250mm - 10°x6.0m_ und 260.00 0.3040 }
PREGUNTA# 02: SEGUN LOS APORTES UNITARIOS DE INSUMOS ADJUNTO, CALOULAR EL.COSTO DEL
ENTREGABLE (SI. ML)
Az 080m,
pi Fes.
RELUENO
a.
7
wis “(e100 m
Tureniq Puc 2
j—cacia ve APOYO E=0.10m,
OS
Bo”(04, TRAZO, REPLANTEO Y NVELACION EN REDES DE ALCANTARSLLADO, CANALES Y VIAS 03 VECES:
oe
03
04
08
INCIAL, DURANTE LA OBRA Y FINAL)
Rendiienlo 35000 mitla Cost untridet por:
DescrpcionRecurso Unidad Cuadita Cando
Mano de Obra
ToROGRAFO Cy oo onzza
PARTIOPANTE tm 30000 0.867
otros
ACERO CORRUGAZO VARILLADE 3° oon
CEMENTO PORTLAND TPO 1 (2546) Bo, ms
‘YES0 EN BOLSAS DE 256 Bo. 0500
Herramientas y Eaupoe
HERRAMIENTAS MANUNLES ato ‘3000
RAS Y JNLONES bm too azz
TeODOUTO be o7mo pier
NvEL TopocRAFICO be orm onieT
Precio
18.00
500
180000
75000
4.0000
20000
100000
‘son00
FEXCAVACION DE ZANA PARA TUGERIAS APROM0.90 HMA = OOM EN TERRENO NORMAL (UANUAL)
Renaimirto 200 midia (Cot untae por:
Descipcion Recurso sides cudita Canad Preco
anode Obra
OPERARIO » 02000 ao 150000
PARTICPANTE be tooo ono 5.00
eramienasy Equpos
ERRAMIENTAS MANUNLES sao 00
RELLENO CON MATERIAL PROPIO COMPACTACION CON EQUIPO LIVANO
Renmicto 500 maa (ost unitate por:m
DescipionRecurso sides Cudita—Canldad—— Prec
anode Obra
PARTICPANTE 2000 zoo 5.00
Herramientas y Equpos
HERRAMIENTAS MANUALES sau soe
PLANGHA COMPACTADORA to ose oammo 18.0000
Mateos
AUR 3 tooo 20000
‘CAMA DE APOYO EN FONDO DE TUBERIA EO Cl.
Poniminto 800 mia (Cost untari deect perm
DescrgeionRecurso Unidad Cundrila Caridad Precio
Mano de bra
OPERARIO m om = om 150000
PARTICPANTE m 2000 oss 0000,
errant y Equipos
ERRAUIENTAS UANUALES 0 50000
ACARREO'Y ACOPIO MANUAL DE MATERIAL EXEDENTE O>1000
Rendimiento ‘00 maa (Cost untae perm
Deseipion Reeurso Unides ——Cudila Cantidad Praco
Mano de Obra
PPARTICIPANTE cy tooo ooo ——S.000
Herramientas y Equipo
HERRAMIENTAS MANUBLES uo ‘0000
SSUMINISTRO E INSTALACION DE TUBERIA DE PVC DN 63 MM (7) C40
Rendimionlo —zan00—_mida (ost unitari ract parm
Descripion Recureo sides cuadita Cantidad Precio
ano de bea
OPERARIO too goxsa 150000
PARTICIPANTE soo aon S00
Herramientas y Equpos
HERRAMIENTAS MANUNLES wo ‘0000(SOLUCIONARIO:A)
+O:
Insumo Cantidad | Peso Unit. | Peso Parcial |
~_Cemento 4,999.00 42.50 57.50.
24,558.00/ 1.00 558.00 |
15,054.06 2.60) 39,140.57 |
Pintura y simiares
Lactilo
COSTO TOTAL (CONI.G.V)
a DE CARGA (KG)
tuberia a
Tubo PVC Agua Presion
CIR CL-10 de 1°x5.0m
TTuibo PVC Agua Presion
CIR CL-10 de 1.5%x5.0m
Tubo PVC Agua Presion
CIR CL-10 de 2°x5.0m
und 2,530.00 | oawsr 14.42
und 0 | 3,897.00 |
VOLUMEN TOTAL (M3)
0.0101 39.49
COSTO POR VE (SN
|_COSTO TOTAL (SIN
|G. (18.00%)
| COSTO TOTAL (CON |tuberia | Unidad | Cantidad | VolUnit. | Vol Parcial
Tubo PVC Desague Liviano
de ax3.0m und | 312.00 0.0243, 759
Tubo PVC Alcantarila SN 2
(6-25) de 160mm - 6%6.0m und 1,766.00 0.1094 193.28
OO VOLUMENTOTAL (M3) 20087
VOL. DE CAMION (7 .50x2.60x3.50) a 54.60
NUMERO DE VIAJES 4.00
CAMION DE CARGA (KG) 40,000.00
COSTO POR KG. (SIN
Unidad | Cantidad | VolUnit. | _VolParcial
und, 1,873.00 0.1946 364.43
(S-25) de 200mm - 8°x6.0m
‘VOLUMEN TOTAL (M3) : 364.43
VOL. DE CAMION : (7.50x2.60x3.50) 51.00
| NUMERO DE VIAJES (10TN) ant
CAMION DE CARGA (KG) 410,000.00
COSTOPORKG.(SINIGY) 019
COSTO POR VIAJE (SIN L.G.V.)
| COSTO TOTAL (SIN L.G.V)
= 271059
| COSTO TOTAL (CON 17,769.44
_—__tuberia | Unidad | Cantidad | VolUnit. | Vol Parcial
Tuto PVC Alcantara SN 2
(S-25) de 250mm - 0.3040 79.04
10°x6.0m
2.00
40,000.00
__ 19]
1,882.35,
376471
677.65
4442.35
| COSTO TOTAL (CON.
COSTO TOTAL DEL FLETE TERRESTRE 90,512.94‘0 TRAZO, REPLANTEO Y NVELAGION EN REDES DE ALCANTARILLADO, CANALES Y VAS 03
\VECES:INCIAL, DURANTE LA OBRA Y FINAL)
Rendimiento 36000 mis Cost untaridrectopur:m 1.80
Deseripcin Recrso Unidad Cundrila Cantidad Precio Parca
anode bea
ToPOGRAFO th 10000 onaze 180000 03800
PARTIOPANTE te 3000000887 50000 03805
terials
CERO CORRUGADO VARADES6* vr 0033 180000 o0ses
CCEMENTO PORTLAND TIPO (425KG) BOL ons 735000 0058s
YESO EN BOLSAS OE 25K. Bo. ‘00500 140000 07000
Herramientas y Equipo
ERRAMIENTAS MANUALES. ao 300 08665 0.020
RAS Y JALONES hm 10000 azz 20000 nun
TEODOLTO hm 07500 a0167 10000 03670,
NEL ToPOGRAFICO hm 07500 00167 5000 nas
(09. EXCAVAGION DE ZANUAPARA TUBERIASAPROM=80 Ao OM EN TERRENO NORMAL,
wana)
Rendimiento 200 iia Coda unaredrecoper:m 33.60
DescripionReeuro Unidad Cuadrila Cantidad Precio Pacial
Mane de bra
OPERARIO te 07000 o8mm0 150000 20000
PARTICPANTE tm» 40000 40000 s0000 20,0000
Herramientas y quips
HERRAMIENTAS MANUALES ao ‘Sooo 20000 1.6000
(03. RELLENO CON MATERIAL PROPIO COMPACTACION CON EQUIPO LVIANO
Rendimiento 00 mata Coston rect per:m3 28.00
Description Recurso Unidos Cundrila Caridad Precio Pacial
Maro de 0a
PARTICIPANTE mm zoo 32000 0000 16.0000
Herramientas y Esuipos
HERRAMIENTAS MANUALES 810 ‘Soca 150000 0.800
PLANCHACOMPACTADORA tm 05000 08000 150000 120000
Matersee
‘AGUA ma 1000 20000 02000
(04 CAWADE APOYO EN FONDO DE TUBERIAE=10 CH.
Renaininto a0 mda Coxtountriodeecopar:m = 2.27
Descipcion Recureo Unidos Cundila Cantidad Precio Parcal,
Mano de Oa
OPERARIO tm 02000-0088 150000005
PARTIOPANTE tm 20000038 $0000 16685
Horamientasy Equpos
HERRAMIENTAS MANLALES uo 0000 21650 7088
(OS, ACARREO Y ACOPIO MANUAL DE MATERIAL EXEDENTE D>100M
Rendimiento 100 mila Costountario draco par:ma 42.00
Descipcion Recurso Unidad Cundila Canad Precio Parcel
anode obra
PARTIOPANTE tm 1.9000 agnt0 50000 400000
Herramientas yEaupos
HERRAMENTAS MANUALES suo 0000 400000 20000
(fo SIMIMSTROE INSTALACION DE TUBERIADE PVC ON 83 MM (C10
Rendineno 22000 mia Coro utara cect porim 1.15
Deseripcion Recrso Unided cusela cartidad Precio Parca
Mara de bra
(OPERARIO mm soto oasee 1500005480
PARTIOPANTE mm 30000061 $0000 0585
Herramientas y quips
HERRAMIENTAS MANUALES a 50000 1.0015 00585,DESCRPCION
WETRADO_| _UNTARIO | C.PAROAL
‘TRAZO, REPLANTEO Y NIVELAGION EN REDES DE ALCANTARILLADO,
T
720.00 190) 129567
_CANALES Y VIAS (03 VECES: INICIAL, DURANTE LA OBRA Y FINAL) ~ |
EXCAVAGION DE ZANJA PARA TUBERIAS APROM=0.0 HMAX=1 006
EN TERRENO NORMAL ANA) | mmo] 00) zac
| RELLEVOCONMATERALPROPOCOMPACTAGONCONEQUPO yy an pare
a :
CCAMA DE APOYO EN FONDO DE TUBERIA E10. CM. me 72000 2a) 4sa780
/ACARREO Y ACOPIO MANUAL DE MATERIAL EXEDENTE >100M we 5906 200) 248049,
‘SUMINISTRO E INSTALACION DE TUBERIA DE PVC ONG3MM(Z}C-10 | ML | 72000 1415 825.17
“ ee
costox7om | —A5A22.41 |