SUBCONTRACTOR:
Checked
ITEM POINTS TO BE CHECKED by REMARKS
1 PHYSICAL CHECKS
The cable installation has to checked for:
a. Proper laying and dressing.
b. Cable tying.
c. Cable tray supports.
d. Cable identification and labelling.
e. Termination.
f. Damage.
2 INSULATION RESISTANCE TEST
a. Measure insulation resistance between cores of
all cable with 500V meggar and tabulate readings
b. Measure insulation resistance between cores and
ECC and earth terminal with a 500V meggar and
tabulate readings