STRUKTUR JEMBATAN
“TUGAS 2 SETELAH UTS”
Dosen Pembimbing : Jaka Propika ST. MT
Dibuat Oleh:
Fery Yudha Atmalingga (01.2017.1.05394)
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN
INSTITUT TEKNOLOGI ADHITAMA SURABAYA
2020homo Gen}, Yudlra
Nine = 0b 200 -(- 05244
Axwralgg
DRILLING LOG
Rout
Freetno. “Type Diling
Bere ote Wa Dae 25 Jun
Wate Table Daler aid
; Sua Pesan Tat
5 a
2/2 mr N-Vake
a}2]i
Elala|
a1 kl2| $
LL
-s00| 300 fe fe] saa} [ts
\44
Past Batra Py de
Betenping i
100] soo Myf elo a 2
Lanes Selena ”
| omer wee
4 Sys fala 2a
= tC rlz a4
i
ww fr] aaa
Lamping Botnse ot
SB |ol ass
a alae or
sifew |ul aie s
Byew {wl seo
-soca| 100 the y
~ ws ffern [as] 9 13 16) 29:c 160| B, | 4.00 | Mutu Beton K- 300
d 4.00 Mutu Baja Tulangan U- 39
Beban Yang Bekerja Pada Abutment
REKAPBEBANKERJA | V@ Momen
"kod z
No Aksi/Beban | 6 | P(KN) Tx ty | Mx My
(kN) (KN), (km), (kNm) -
A Aksi Tetap
Berat
1 coe ms | 13338.045 5693.41
Beb. Mati
2 Tambahan US :
3 Tekanan Tanah TA 630755.8 1430554.21
B Beban Lalusintas
4 Beban Lajur’D" | TD | 855.60 0.00
Beban
5 Pedestrian TP 201.00 0.00
6 Gaya Rem 18 250.0 4875.00
c ‘Aksi Lingkugan
7 Temperatur —T 375 153.75
Beban
8 angin EW 40.32 87.65, 0 504.55
9 Beban gempa | EQ 3039 { soso | 13683.106 | t2sea1
Tek. Tanah 5
10 Dinamis EQ -529834.9 aroma
5 Agi
Lainnya
1 Gesekan FB 1922.0 5420.16
S| 14880505ABEL ONSPT.
Kedalaman Ui) | NS?r | Nserrerkopeen’ (Cn) | seni Tanah
gan‘ fer Bea, diengah Cera
Sebi RE OH
re