1) Why earthing mat is given in a switchyard?

a) to increase the ground potential


b) to reduce the grounding resistance
c) for increasing the resistance of the ground
d) to introduce some potential of ground

ANSWER: b

2) For purging of boiler what should be the windbox DP?


a) Greater than 50 mm wc
b) Greater than 80 mm wc
c) Less than 40 mm wc
d) Less than 120 mmwc

ANSWER: c