Inspection & Testing Plan for 11 KV Switchgear

Ref.AP-ITP-E019 Rev. (0) Form Issue Date:

Client : Ellington Properties LLC Prepared By : AW


Main Contractor : Al Ashram Contracting LLC Project : Proposed Sandstone B+G+4 Residential Approved By : AW
Engineer : Al Wasl Al Jadeed Consultants Building

MEP Contractor : Eurasia Electromechanical Works LLC Page : 1 of 1


Responsibility
Item No.

Frequency of Applicable
Acceptance Control Data / Inspection
Inspection / Test to be carried out Test / Specification /
Criteria Forms Method
Inspection Standard TECH ENG CONSULTANT Third Party

As and when Technical Technical Design drawings


1 Approval of Shop drawings. Review P R NA
approved specification specification approval

Inspection of as per approved 11 KV As and when Technical Technical Material Visual/Material


2 H S, VI NA
Switchgear material submittal. delivered specifiction specification Inspection Form Submittal

Installation as per
Inspection of Installation of 11 KV Once for each Technical Approved Shop
3 approved Shop RFIA H S, VI NA
Switchgear Villa specification Drawing
Drawings

Installation as per
Technical Approved Shop
4 Testing and Commissioning Once approved Shop RFIA/Test Form H H H
specification Drawing
Drawings

W = Witness S= Surveillance V I = Visual Inspection R= Document Review RFIA= Request for Inspection and Approval H= Hold Point NA = Not Applicable P= Preparation