ITP E019 Installation of 11KV Switchgear
ITP E019 Installation of 11KV Switchgear
Frequency of Applicable
Acceptance Control Data / Inspection
Inspection / Test to be carried out Test / Specification /
Criteria Forms Method
Inspection Standard TECH ENG CONSULTANT Third Party
Installation as per
Inspection of Installation of 11 KV Once for each Technical Approved Shop
3 approved Shop RFIA H S, VI NA
Switchgear Villa specification Drawing
Drawings
Installation as per
Technical Approved Shop
4 Testing and Commissioning Once approved Shop RFIA/Test Form H H H
specification Drawing
Drawings
W = Witness S= Surveillance V I = Visual Inspection R= Document Review RFIA= Request for Inspection and Approval H= Hold Point NA = Not Applicable P= Preparation
Inspection & Testing Plan (ITP)