Task description: The activity of brick laying involving cement mixing, lifting to platform
and install of brick
Production rate (if available) units per shift, hour or minute (circle as appropriate)
First hour
How often does an individual perform the task? (eg daily, weekly, etc) Daily
How often is the task carried out within the organisation? (eg daily, etc) Daily
Do workers rotate to other tasks?
If so, what tasks?
Score sheet
Enter the colour band and numerical score for each risk factor in the table below.
Follow the instructions on page 15 to determine the task score and exposure score.
A1 Arm movements R 6 R 6
A2 Repetition R 6 R 6
B Force G 0 G 0
C1 Head/neck posture A 1 A 1
C2 Back posture R 2 R 2
C3 Arm posture R 4 R 4
C4 Wrist posture A 1 A 1
C5 Hand/finger grip A 1 A 1
D1 Breaks G 0 G 0
D2 Work pace G 0 G 0
D3 Other factors G 0 G 0
Task score 21 21
D4 Duration multiplier X X
Exposure score 1 1
D5 Psychosocial factors