1 Zero stability Verification 2 Visual Inspection for Erosion/Damage 3 Excessive Vibrations during operation 4 Verification of Product Quantity wrt Prover +/- 0.1% 5 Verification of MFM Density with the Physical Density +/- 1kg/m3
6 Verification of MFM transmitter data with control room data
7 Verification of W&M seal of the transmitter 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Remarks Corrective Action taken Sr. No. Valve Position Field validation 1 Normal close Condition 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Field validation Sr. No. Parameter 1 Verification of Radar Product level with Manual Product Level
2 Difference between Primary and secondary Radar level
3 Verification of Product Level in TSI with SCADA 4 Gland 5 Earthing 6 Physical Damage 7 h, hh level configuration for radar 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Permissible Tolerance Remarks Corrective Action Taken +/- 3 mm