Agip Gas BV
Libyan Branch
WL GP - WAFA PLANTS
GENERAL
COM. JOB No. | COMPANY DOC. No. [REV.
A10/WAIO2| _J-51-S-Z-5002-00 AL
CON. JOB No. | CONTRACTOR DOC No | REV.
3114) 3414-L-Z-RT-002 | AI
JDATE_18 Dec, 2003, SHEET__1_oF_2
PREPD
Le Fore
Project Specification
CHRD
‘APPD
Fert
Fert
‘COMPANY APPD
LUBRICANT SUMMARY REPORT
(FOR WAFA COASTAL PLANT)
en
;
DATE _|_ PAGE DESCRIPTION
PREPD
CHKD | _APPD
1611272003 Isued for design
aSAgip Gas BV
Libyan Branch
‘COM, JOB No,
A10/WAIO2
‘COMPANY DOC. Ne.
J-51-S-Z-5002-00.
TREY.
LAL
Project Specification
1. SCOPE
based on the vendor recommendation.
Definitions:
COMPANY
CONTRACTOR
VENDOR
PROJECT
PLANT
2. Contents
2.4, Grand Summary for procurement.
2.2. Lubricant List.
CON. JOB No. [CONTRACTOR 00. Trev
WL GP - WAFA PLANTS 3111 3114-L-Z-RT-002_ AT
GENERAL SHEET 2 OF __21
This document covers the requirement for the issue of the Lubricant Summary Report
as per TECHNIP Specification T-50-P-L-0001-00, rev. A1 for WAFA Coastal Plant,
The application procedure, replacement procedure and other instruction are detailed
in vendor Lubricant List and vendor Installation and Operating Manual.