You are on page 1of 2
(eo [rsiraca Erne Agip Gas BV Libyan Branch WL GP - WAFA PLANTS GENERAL COM. JOB No. | COMPANY DOC. No. [REV. A10/WAIO2| _J-51-S-Z-5002-00 AL CON. JOB No. | CONTRACTOR DOC No | REV. 3114) 3414-L-Z-RT-002 | AI JDATE_18 Dec, 2003, SHEET__1_oF_2 PREPD Le Fore Project Specification CHRD ‘APPD Fert Fert ‘COMPANY APPD LUBRICANT SUMMARY REPORT (FOR WAFA COASTAL PLANT) en ; DATE _|_ PAGE DESCRIPTION PREPD CHKD | _APPD 1611272003 Isued for design aS Agip Gas BV Libyan Branch ‘COM, JOB No, A10/WAIO2 ‘COMPANY DOC. Ne. J-51-S-Z-5002-00. TREY. LAL Project Specification 1. SCOPE based on the vendor recommendation. Definitions: COMPANY CONTRACTOR VENDOR PROJECT PLANT 2. Contents 2.4, Grand Summary for procurement. 2.2. Lubricant List. CON. JOB No. [CONTRACTOR 00. Trev WL GP - WAFA PLANTS 3111 3114-L-Z-RT-002_ AT GENERAL SHEET 2 OF __21 This document covers the requirement for the issue of the Lubricant Summary Report as per TECHNIP Specification T-50-P-L-0001-00, rev. A1 for WAFA Coastal Plant, The application procedure, replacement procedure and other instruction are detailed in vendor Lubricant List and vendor Installation and Operating Manual. AGIP GAS BV - LIBYAN BRANCH JGC-TOM-SZ JV Supplier of required services and/or goods Wester Libya Gas Project WAFA Desert and Coastal 3 UGC CORPORATION litt Bremer

You might also like