REV REVISION NOTE DATE ISSUED

FOR DETAILED PENETRATION ADN PIPE


INSTALLATION, REFER TO DWG. MM-30-50018.
SAFE AREA
HAZARDOUS AREA
BOTTOM VIEW
SERVICE ACCESS: ~250 MM EACH SIDE
A: SAMPLE WATER IN BSP 3/8"
B: SAMPLE WATER OUT BSP 3/8"
C: FRESH WATER IN BSP 3/8"
D: VENT AIR IN BSP 1 1/2"
E: VENT AIR OUT DN50 PN6
1: CABINET
2: CABINET DOOR
3: EMULSIFIER W. MOTOR AND GEARBOX
4: GEARPUMP UNIT W. MOTOR
5: VENT. FAN W. MOTOR
6: DOOR SWITCH
7: ELECTRICAL CABINET
8: SOLENOID VALVE
9: BRACKET (SEE DRW. MM-30-10087)
INDICATION LAMPS
10: PENETRATION STAINLESS STEEL (INCL. IN DELIVERY)
11: BALL VALVE (INCL. IN DELIVERY)
12: PIPE Ø12 STAINLESS STEEL (2X1 M)
13: PIPE Ø8 STAINLESS STEEL (2X1 M)
14: LUBRICATION CONTAINER
FEMALE THREAD
BSP 1 1/2"
FRONT VIEW SIDE VIEW
CUSTOMER
REF DWG NO
CAD FILE
VIKING ENGINEERING PTE LTD ISO 9001 2000 REGISTERED
184 PANDAN LOOP, SINGAPORE 128374 MGMT. SYS.
RvA C 0 2 4
DRAWN Tel: +65 6777 5055 Fax: +65 6779 2176 Mail: info@viking.sg Web: www.viking.sg
DNV Certification B.V., The Nethelands
APPROVED PROJECT
1ST ANGLE PROJECTION
DWG TITLE
THE INFORMATION CONTAINED
HEREIN IS THE EXCLUSIVE PROPERTY
DWG NO REV
OF VIKING ENGINEERING PTE LTD.
THEY MUST NOT BE USED OR
REPRODUCED IN WHOLE OR IN PART
DATE SCALE PAGE SIZE
WITHOUT PERMISSION IN WRITING. A3
REV REVISION NOTE DATE ISSUED
MARPOIL
VIKING ENGINEERING www.viking.sg
4.5MM(4X) HOLES
FOR MOUNTING
BOTTOM
A A
TOP VIEW SOCKET OUTLET
JUNCTION BOX FOR SIGNAL CABLE FOR POWER SUPPLY
weight 470g weight70g
A-A
CUSTOMER
REF DWG NO
CAD FILE
VIKING ENGINEERING PTE LTD ISO 9001 2000 REGISTERED
184 PANDAN LOOP, SINGAPORE 128374 MGMT. SYS.
RvA C 0 2 4
DRAWN Tel: +65 6777 5055 Fax: +65 6779 2176 Mail: info@viking.sg Web: www.viking.sg
DNV Certification B.V., The Nethelands
APPROVED PROJECT
1ST ANGLE PROJECTION
DWG TITLE
THE INFORMATION CONTAINED
HEREIN IS THE EXCLUSIVE PROPERTY
DWG NO REV
OF VIKING ENGINEERING PTE LTD.
THEY MUST NOT BE USED OR
REPRODUCED IN WHOLE OR IN PART
DATE SCALE PAGE SIZE
WITHOUT PERMISSION IN WRITING. A3
REV REVISION NOTE DATE ISSUED
Console Cut-out
CUSTOMER
REF DWG NO
CAD FILE
VIKING ENGINEERING PTE LTD ISO 9001 2000 REGISTERED
184 PANDAN LOOP, SINGAPORE 128374 MGMT. SYS.
RvA C 0 2 4
DRAWN Tel: +65 6777 5055 Fax: +65 6779 2176 Mail: info@viking.sg Web: www.viking.sg
DNV Certification B.V., The Nethelands
APPROVED PROJECT
1ST ANGLE PROJECTION
DWG TITLE
THE INFORMATION CONTAINED
HEREIN IS THE EXCLUSIVE PROPERTY
DWG NO REV
OF VIKING ENGINEERING PTE LTD.
THEY MUST NOT BE USED OR
REPRODUCED IN WHOLE OR IN PART
DATE SCALE PAGE SIZE
WITHOUT PERMISSION IN WRITING. A3
REV REVISION NOTE DATE ISSUED
2
SAMPLE / CALIBRATION WATER
FROM MEASURING UNIT
PIPE OD 12 MM
SHOWN TURNED 90°
FROM TRUE POSITION
14 13
15
8
7 5 9 12 4
11
TO OVERBOARD-PIPE
SAMPLE WATER TO
MEASURING UNIT
10
PIPE OD 8 MM 6
1
3
FROM SAMPLE PUMP
3/4" BSP FEMALE EQUAL TEE
1/4" BSP FEMALE EQUAL TEE
25MMx1" BSP MALE STUD COUPLING
20MMx3/4" BSP MALE STUD COUPLING
PRESSURE GAUGE 0-10 KG/CM2
EJECTOR 3KG
CUSTOMER
VIKING ENGINEERING PTE LTD
1/4" BSP MALE STUD ELBOW
REF DWG NO ISO 9001 2000 REGISTERED
1/4" BSP DOUBLE FEMALE BALL VALVE
CAD FILE
184 PANDAN LOOP, SINGAPORE 128374 MGMT. SYS.
RvA C 0 2 4
Ø12 MM x 1/2" BSP MALE STUD COUPLING DRAWN Tel: +65 6777 5055 Fax: +65 6779 2176 Mail: info@viking.sg Web: www.viking.sg
DNV Certification B.V., The Nethelands
1" BSP DOUBLE FEMALE SLEEVE APPROVED PROJECT
1/4" BSP STRAIGHT MALE ADAPTOR
1ST ANGLE PROJECTION
DWG TITLE
3/4" x 1/4" BSP REDUCER
THE INFORMATION CONTAINED
3/4" BSP STRAIGHT MALE ADAPTOR HEREIN IS THE EXCLUSIVE PROPERTY
DWG NO REV
OF VIKING ENGINEERING PTE LTD.
3/4" x 1/2" BSP REDUCER THEY MUST NOT BE USED OR
REPRODUCED IN WHOLE OR IN PART
DATE SCALE PAGE SIZE
Ø8 MM x 1/4" BSP MALE STUD COUPLING WITHOUT PERMISSION IN WRITING. A3
REV REVISION NOTE DATE ISSUED
NOTE!
MEASURING UNIT THE MEASURING UNIT
SHOULD BE MOUNTED ON
(REAR VIEW) BRACKETS NOT INCLUDED BSP 3/8" STAINLESS STEEL
SEE DRW. NO: MMII-30-50024 IN THE DELIVERY, OR BY
SIMILAR METHOD, AT A
NOTE!
DISTANCE OF 150MM FROM SAMPLE TRANSFER PIPING TO BE OF
THE BULKHEAD. A MATERIAL RESISTANT TO FIRE,
CORROSION AND OIL. THE DISTANCE
EJECTOR UNIT-BULKHEAD-MEASURING
UNIT MUST BE KEPT TO A MINIMUM.
BULKHEAD
BULKHEAD PENETRATION
A. COMPRESSION COUPLING BSP 3/8"-12MM
B. COMPRESSION COUPLING BSP 3/8"-8MM
C. SHUT OFF BALLVALVE BSP 3/8"
D. NIPPLE BSP 3/8"
E. ELBOW COUPLING BSP 3/8"-8MM
CONTINUOUS WELD
ON BOTH HOLES F. ELBOW COUPLING BSP 3/8"-12MM
MANUAL SAMPLING G. COMPRESSION COUPLING BSP 3/4"-20MM
H. COMPRESSION COUPLING BSP 1"-25MM
BULKHEAD
PENETRATION
NOTE! EJECTOR UNIT SEE
DRW.NO: MM-30-50003
DRILL 2 HOLES Ø=26MM, PREFERRABLY
SITUATED HORIZONTALLY AND 80 MM SAFE AREA HAZARDOUS AREA
APART IN LINE WITH INLET/OUTLET
CONNECTIONS ON MEASURING UNIT.
CUSTOMER
REF DWG NO
CAD FILE
VIKING ENGINEERING PTE LTD ISO 9001 2000 REGISTERED
184 PANDAN LOOP, SINGAPORE 128374 MGMT. SYS.
RvA C 0 2 4
DRAWN Tel: +65 6777 5055 Fax: +65 6779 2176 Mail: info@viking.sg Web: www.viking.sg
DNV Certification B.V., The Nethelands
APPROVED PROJECT
1ST ANGLE PROJECTION
DWG TITLE
THE INFORMATION CONTAINED
HEREIN IS THE EXCLUSIVE PROPERTY
DWG NO REV
OF VIKING ENGINEERING PTE LTD.
THEY MUST NOT BE USED OR
REPRODUCED IN WHOLE OR IN PART
DATE SCALE PAGE SIZE
WITHOUT PERMISSION IN WRITING. A3
REV REVISION NOTE DATE ISSUED
T = 12
DN 32 (R 1 1/4" )
Incl. in delivery
GAS-SAFE SPACE GAS-DANGEROUS SPACE
counter flange
DISCHARGE
BULKHEAD
CUT-OUT SUCTION
OIL CUP
8 CONTINIOUS WELD
DOUBLING PLATE Ø = 400, T = 30
CUSTOMER
REF DWG NO
CAD FILE
VIKING ENGINEERING PTE LTD ISO 9001 2000 REGISTERED
184 PANDAN LOOP, SINGAPORE 128374 MGMT. SYS.
RvA C 0 2 4
DRAWN Tel: +65 6777 5055 Fax: +65 6779 2176 Mail: info@viking.sg Web: www.viking.sg
DNV Certification B.V., The Nethelands
APPROVED PROJECT
1ST ANGLE PROJECTION
DWG TITLE
THE INFORMATION CONTAINED
SAMPLE FEED PUMP ARRANGEMENT
HEREIN IS THE EXCLUSIVE PROPERTY
DWG NO REV
OF VIKING ENGINEERING PTE LTD.
THEY MUST NOT BE USED OR
REPRODUCED IN WHOLE OR IN PART
DATE SCALE PAGE SIZE
WITHOUT PERMISSION IN WRITING. A3
REV REVISION NOTE DATE ISSUED
connecting tubing
from flow sensor
HI OF TRANSMITTER TO BE CONNECTED TO HI SIDE OF FLOW SENSOR
LO OF TRANSMITTER TO BE CONNECTED TO LO SIDE OF FLOW SENSOR
flush water flush water
connection connection
wiring connections
minimum 20mm
clearance for
cover removal

signal
test

+
both sides
transmitter terminal
circuitry connections
this side this side

-
mounting braket,
U-bolt, nuts and vent valves cable to enter
washers are inclued through lower shield to be
in delivery. conduit connected at
this end only.
to measuring unit
electrical cabinet
ALTERNATIVE
MOUNTING
dn50 or nps 2" (od=60-62mm)pipe
rigidly mounted/weled to
adjacent bulkhead or suitable
mounting surface.
ALTERNATIVE
MOUNTING
CUSTOMER
REF DWG NO
CAD FILE
VIKING ENGINEERING PTE LTD ISO 9001 2000 REGISTERED
184 PANDAN LOOP, SINGAPORE 128374 MGMT. SYS.
RvA C 0 2 4
DRAWN Tel: +65 6777 5055 Fax: +65 6779 2176 Mail: info@viking.sg Web: www.viking.sg
DNV Certification B.V., The Nethelands
APPROVED PROJECT
1ST ANGLE PROJECTION
DWG TITLE
installation of dp/i-transmitter with 5-way valve block
THE INFORMATION CONTAINED
HEREIN IS THE EXCLUSIVE PROPERTY
DWG NO REV
OF VIKING ENGINEERING PTE LTD.
THEY MUST NOT BE USED OR
REPRODUCED IN WHOLE OR IN PART
DATE SCALE PAGE SIZE
WITHOUT PERMISSION IN WRITING. A3
REV REVISION NOTE DATE ISSUED
CUSTOMER
REF DWG NO
CAD FILE
VIKING ENGINEERING PTE LTD ISO 9001 2000 REGISTERED
184 PANDAN LOOP, SINGAPORE 128374 MGMT. SYS.
RvA C 0 2 4
DRAWN Tel: +65 6777 5055 Fax: +65 6779 2176 Mail: info@viking.sg Web: www.viking.sg
DNV Certification B.V., The Nethelands
APPROVED PROJECT
1ST ANGLE PROJECTION
DWG TITLE
GENERAL ARRANGEMENT OF FLOW SENSOR AND DP/I TRANSMITTER
THE INFORMATION CONTAINED
HEREIN IS THE EXCLUSIVE PROPERTY
DWG NO REV
OF VIKING ENGINEERING PTE LTD.
THEY MUST NOT BE USED OR
REPRODUCED IN WHOLE OR IN PART
DATE SCALE PAGE SIZE
WITHOUT PERMISSION IN WRITING. A3
REV REVISION NOTE DATE ISSUED
PROCEDURE FOR INSTALLATION OF SAMPLING PROBE
1. Determine location of sampling point. The sampling point should
normally be located in a vertical section of the discharge line. If
mounted in a horizontal section the probe should penetrate from the
lower part of the pipe.
2. On sampling point site arrange a Ø = 42-44 mm hole which will
provide enough weld bead.
FLOW 3. Determine mounting stub height "H" acc. to table.
4. Cut and shape item ‚ to comply with determined "H" and
discharge pipe periphery.
5. Align item ‚ concentrically over the hole and weld it to the pipe.
6. Install flange gasket † , and slide sampling probe •, into the
TO SAMPLE stub so that the arrow is pointing in the flow direction.
DN20(3/4")PN16 FEED PUMP 7. Complete installation by bolting probe flange to mating stub
DIN2576 flange.
8. Cut / drill a Ø = 34-35 mm hole in the discharge line at a
distance minimum 150 mm downstream of the sample probe and fit the
sample return stub by continuos weld.
DN50(2")PN16 - Alternative installation method may be used provided requirements
DIN2527/B for "H" as for classification are considered.
FROM EJECTOR
DN25(1")PN16 - For dimensions not contained in the table, use the formula.
DN50(2")PN16 DIN2576
DIN2576
TABLE FOR DETERMINEING "H"
Dia. Nom. OD H for t = H
(Nom. pipe MM 4.5-12.7 mm for odd pipe sizes
size) ( IN. ) ( 0.175-0.5 in.) use below formula
DN 50 60
116
(NPS 2) ( 2.38 )
DN 65 73
114
(NPS 2 1/2) ( 2.88 )
DN 80 89
110
(NPS 3) ( 3.5 )
DN50 T=6.3 DN25 T=4.0
OD=60.3 OD=33.7 DN 90 102
106
(NPS 3 1/2) (4)
H = 135 - OD/4 - T/2
FULL PENETRATION DN 100 114
103
WELD! TRIM EDGE (NPS 4) ( 4.5 )
TO FIT PIPE!
DN 125 141
96
(NPS 5) ( 5.56 )
DN 150 168
90
(NPS 6) ( 6.62 )
DN 200 219
76
(NPS 8) ( 8.62 )
SAMPLE INCLUDED IN DELIVERY FROM VIKING
OUT 1. Sampling probe, DN50 - DN200, L = 135
2. Mounting stub, H = 150 at delivery, to be adjusted at installation.
SAMPLE IN 3. NUT, M16 16
4. Washer, brb 17X30
5. Bolt, M6s 16X60
6. Gasket
DISCHARGE WATER 7. Sample return stub, L = 100
FLOW DIRECTION STUB MATERIAL: DIN ST35.8/1
SIS 1330-05
CUSTOMER
REF DWG NO
CAD FILE
VIKING ENGINEERING PTE LTD ISO 9001 2000 REGISTERED
184 PANDAN LOOP, SINGAPORE 128374 MGMT. SYS.
RvA C 0 2 4
DRAWN Tel: +65 6777 5055 Fax: +65 6779 2176 Mail: info@viking.sg Web: www.viking.sg
DNV Certification B.V., The Nethelands
APPROVED PROJECT
DWG TITLE
1ST ANGLE PROJECTION SAMPLING PROB AND RETURN STUB FOR DISCHARGE PIPES
THE INFORMATION CONTAINED DN50-DN200 (NPS2-NPS8) ASSEMBLY AND MOUNTING
HEREIN IS THE EXCLUSIVE PROPERTY
DWG NO REV
OF VIKING ENGINEERING PTE LTD.
THEY MUST NOT BE USED OR
REPRODUCED IN WHOLE OR IN PART
DATE SCALE PAGE SIZE
WITHOUT PERMISSION IN WRITING. A3
ó ͱ´·¼ ¿²¼ ½±³°¿½¬ ¼»-·¹²

ó Þ±´¬- ±² ª·-«¿´ °±-·¬·±² ·²¼·½¿¬±®


ó Ï«·½µó-»¬Œ ½¿³

ó Ü«¿´ ½¿¾´» »²¬®·»-

ó Ý¿°¬·ª» ½±ª»® ¾±´¬-


ͬ¿²¼¿®¼ -©·¬½¸ æ ÍÍëÙÔøѳ®±²÷
ͬ¿²¼¿®¼ -»²-±® æ ÒÖîóÊíóÒ øÐúÚ÷
ó Û¿-§ ³±«²¬·²¹ ¾®¿½µ»¬

Ñ°¬·±²¿´ -©·¬½¸ æ ÍÍïðÙÔøѳ®±²÷


Ñ°¬·±²¿´ -»²-±®

б-·¬·±² ·²¼·½¿¬±®

ݱ²¼«·¬ »²¬®·»-

ÒßÓËÎ ÍÌßÒÜßÎÜ

Ý¿°¬·ª» ½±ª»® ¾±´¬-


REV REVISION NOTE DATE ISSUED
CUSTOMER
REF DWG NO
CAD FILE
VIKING ENGINEERING PTE LTD ISO 9001 2000 REGISTERED
184 PANDAN LOOP, SINGAPORE 128374 MGMT. SYS.
RvA C 0 2 4
DRAWN Tel: +65 6777 5055 Fax: +65 6779 2176 Mail: info@viking.sg Web: www.viking.sg
DNV Certification B.V., The Nethelands
APPROVED PROJECT
1ST ANGLE PROJECTION
DWG TITLE
THE INFORMATION CONTAINED
HEREIN IS THE EXCLUSIVE PROPERTY
DWG NO REV
OF VIKING ENGINEERING PTE LTD.
THEY MUST NOT BE USED OR
REPRODUCED IN WHOLE OR IN PART
DATE SCALE PAGE SIZE
WITHOUT PERMISSION IN WRITING. A3
REV REVISION NOTE DATE ISSUED
CUSTOMER
REF DWG NO
CAD FILE
VIKING ENGINEERING PTE LTD ISO 9001 2000 REGISTERED
184 PANDAN LOOP, SINGAPORE 128374 MGMT. SYS.
RvA C 0 2 4
DRAWN Tel: +65 6777 5055 Fax: +65 6779 2176 Mail: info@viking.sg Web: www.viking.sg
DNV Certification B.V., The Nethelands
APPROVED PROJECT
1ST ANGLE PROJECTION
DWG TITLE
THE INFORMATION CONTAINED
HEREIN IS THE EXCLUSIVE PROPERTY
DWG NO REV
OF VIKING ENGINEERING PTE LTD.
THEY MUST NOT BE USED OR
REPRODUCED IN WHOLE OR IN PART
DATE SCALE PAGE SIZE
WITHOUT PERMISSION IN WRITING. A3
REV REVISION NOTE DATE ISSUED
2 5/2 way Solenoid valve 100210 Luozhong
CUSTOMER
REF DWG NO
CAD FILE
VIKING ENGINEERING PTE LTD ISO 9001 2000 REGISTERED
184 PANDAN LOOP, SINGAPORE 128374 MGMT. SYS.
RvA C 0 2 4
DRAWN Tel: +65 6777 5055 Fax: +65 6779 2176 Mail: info@viking.sg Web: www.viking.sg
DNV Certification B.V., The Nethelands
APPROVED PROJECT
1ST ANGLE PROJECTION
DWG TITLE
THE INFORMATION CONTAINED
OVERBOARD AND RECIRCULATION CONTROL SYSTEM
HEREIN IS THE EXCLUSIVE PROPERTY
DWG NO REV
OF VIKING ENGINEERING PTE LTD.
THEY MUST NOT BE USED OR
REPRODUCED IN WHOLE OR IN PART
DATE SCALE PAGE SIZE
WITHOUT PERMISSION IN WRITING. A3