OSP SCOPE OF WORK.

(Inside Boundary Wall) (TENTATIVE QUANTITIES)

S/No Description of work Qty U-Rate U-Price Amount 6 Sites Remarks


Trenching 20*60cm with 1x50mm without Sub duct
and 1x50mm with 2 subduct including excavation of
1 trenches, Sand Bedding- Covering 25cm, Concrete 1500 LM 40 60,000.00 360,000.00 Pipes, Warning Tape will
encasement 25cm and Asphalt 10cm for Excavated be provided by Client.
area only with warning tape.

2 Installing of Single cover H.H 11 EACH 150 1,650.00 9,900.00 HH Will be Provided by
Client.

Pole Foundation Will be


3 Installing of Pole Foundation (60x60x80cm) 11 EACH 150 1,650.00 9,900.00
Provided by Client.

Poles Will be Provided


4 Installation of Camera Poles (5 &7M high)- Optional 11 EACH 250 2,750.00 16,500.00 by Client.

66,050.00 396,300.00