You are on page 1of 1

College level Skill competition - Database Administration - 2012 E.

non consumable materials to be used for projects per candidate

No. Item description Quantity Unit Specification Material cost

Project 1 Unit price Total cost

1 computer 1:1 PCs - Dell optiplex 755 or above 20,000 20,000


- RAM: 2Gb or above
- Processor: 3.00GHZ or above
- Hard Disk: 80GB or above
2 preinstalled SQL Server 1:1 SQL Server 2005 or lates version 300 300

3 Preinstalled UML TOOLS 1:1 - Microsoft Visio 2007 or above 100 100
- EdrawSoftEdraw Max v7 or above

3 Preinstalled Microsoft office Microsoft office 2007 or above 100 100

Total material cost 20,500

Prepared by Cooperation with Federal TVET Agency and Institute Page 1

You might also like