The proposed model can be broken down in the following manner:

Independent Variables: Contractual Adaptation and Contractual Coordination

Dependent Variable: Project Success

Mediator: Project Control

Moderator: Contractual Coordination and Managerial Support

Hypothesis

H1: Contractual Coordination is positively related to project success. 

H2: Contractual Coordination is positively related to project control.


H3: project control is positively related to project success.
H4: project control mediates the relationship between Contractual Coordination and project success.

H5: Managerial Support moderates the association between Contractual Coordination and project
control such that if Managerial support is high then the relationship between Contractual Coordination
and project control would be strengthened.

H1: Contractual Adaptation is positively related to project success. 

H2: Contractual Adaptation is positively related to project control.


H3: project control is positively related to project success.
H4: project control mediates the relationship between Contractual Adaptation and project success.

H5: Contractual Coordination moderates the association between Contractual Adaptation and project
control such that if Contractual Coordination is high then the relationship between Contractual
Adaptation and project control would be strengthened.