Pipe Bridge
 Client required a 472m² access
platform to provide two levels to
the pipebridge on the North
Everest for steelwork repairs.
 The V-Net™ provided full side
containment resulting in no
safety boat cover requirement.
 If they had scaffolded the
pipebridge, they would only have
been able to scaffold 20% of the
structure at any one time. They
could have installed V-Deck™ on
the entire pipebridge.

472m² of
“ V-Deck™ Scaffold Saving
1kN/m² UDL
Brilliant
Shifts 4 installers 5 installers
Install & Dismantle 16 Shifts 34 Shifts
62%
“ Platform
Weight (t)
10.8t 70t 85%