You are on page 1of 1

V-Deck™

Maersk Interceptor
 Access was required for changing out
the break resistor cables on a drilling
module.

V-Deck™ Solution
“  The design of the V-Deck™ meant
that it moved with the drilling module
when it needed to be moved. This
Reduced downtime meant that the drilling module
remained operational for the duration
significantly of the works.

“  If scaffolding had been used there


would have been extensive
operational downtime for the drilling

Velo Tech Systems Limited info@vtsltd.uk


SC513084

You might also like