MV STATION
1200
A O&M BUILDING
CENTRO DE CONTROL
A
MT NUEVA: 480m
1960
PATH WIDTH 4,0m
CAMINO ANCHO 4,0 m
Camino
PERIMETER FENCE
VALLADO PERIMETRAL
GATE ACCESS
PUERTA DE ACCESO
Princip
PROPERTY BOUNDARIES
al
ANEMOMETER & NETWORK CONTROL UNIT (NCU)
AC BOX
INVERTER
INVERSOR
Canal
ARQUETA PARA SEGURIDAD 45x45x45
Canal
MASS CONCRETE FOOTING FOR SECURITY SYSTEM
WEATHER STATION
1200
TCU = TRACKER CONTROL UNIT (TCU)
1960
TEMPORARY TCU-XX-YY UNIDAD DE CONTROL DEL TRACKER (TCU)
FACILITIES XX = ACBOX TO WHICH BELONGS
LIRIOS
AC.BOX-9
YY = TCU NUMBER /
INV-9-2
INV-10-1
INV-9-1
SEC-3 XX = ACBOX TO WHICH BELONGS
PR-L5 S-XX-ZZ-TT
Acceso a Planta Solar SEC-2 ZZ = INVERTER TO WHICH BELONGS
INVERSOR AL QUE PERTENECE
SEC-1 TT = STRING NUMBER / G
Track. = TRACKER
4
INTERNAL PATH
AA = TRACKER NUMBER /
INV-6-1
AC.BOX-5
INV-5-2
INV-7-1
AC.BOX-6
D D
INV-6-2
INV-8-2
SEC-3
INV-7-2
AC.BOX-7
INV-8-1
AC.BOX-8
INV-10-2
AC.BOX-12
AC.BOX-11
INV-11-2
INV-11-1
INV-12-2
DRAWING DATA / DATOS DE PROYECTO
INV-12-1
Camino interno provisorio
INV-5-1
Short Circuit Current Isc (A) / Corriente de cortocircuito Isc (A) 9.83
Total Power : 2.990,19 kWp
Module Efficiency (%) / 19.0 Potencia total
Maximum Power Voltage Vmpp (V) / 39.7 Total Power AC : 2.700 kWac
Potenica total AC
Maximum Power Current Impp (A) / 9.33 Ratio AC/DC : 1,1074
Ratio AC/DC
Modules:
INV-4-2
AC.BOX-4
Strings:
24 strings (modules TSM-DD14A 365Wp)
INV-4-1
255 strings (modules TSM-DD14A 370Wp)
29 modules per string
EFFICIENCY / RENDIMIENTO
F Max. Efficiency / 99.0% F
no pro
MECHANICAL DATA /
Dimensions (WxHxD) / Dimensiones (A x B x H) 1075x605x310 mm 1 MV Station: 2.800 kVA
1
Weight (with mounting plate) / Peso 79 kg
AC.BOX-1
AC.BOX-2
INV-2-2 INV-2-1
Canal 1 TRANSFORMADOR
Operating Temperature Range 0,8 / 13,2 kV
10.7 Temperatura de funcionamiento 6,5 Ucc %
INV-3-2
o provisorio
Camino intern
LEGEND / LEYENDA
1
Canal
STRING CABLE PV TOPSOLAR ZZ-F / H1X2X2-K 1.8 kVdc CU 1x6 mm2
PR-L4 Cable String PV TOPSOLAR ZZ-F / H1X2X2-K1.8 kVdc Cu 1x6 mm2
NOTE: The contractor is responsible for making the necessary changes during the construction and generating the "As-Built" documentation, the preparation of the
Operation and Maintenance Manual of the plant, delivery of detailed work execution schedule and making any missing plan or documentation that is required.
Acceso a Planta Solar
Ca
na
l 10.7
Project:
LIRIO DE CAMPO SOLAR PARK 2,9902 Mwp
Subject:
H NAIAD PROJECTS H
Canal
Para ser impreso en formato A1 (840x597mm)
To be printed in A1 size (840x597mm)
Location:
Drawing:
Reference Documents / Documentos de Referencia GENERAL LAYOUT
757-PV-GEN-DRW-AMET-001
Drawn: Document Status: Scale: Sheet: Date:
757-PV-ELE-REP-AMET-007 CABLE SIZING AND ENERGY LOSSES CALCULATION LYNKA UR 1:1000 1/11 2019/12/31
757-PV-ELE-DRW-AMET-010 LV-DC_AC SLD
757-PV-ELE-DRW-AMET-011 Overall SLD (DC_LV-AC_MV_OH) Size: Rev: Phase:
757-PV-CIV-DRW-AMET-015 Layout MV & LV Trench cross sections & details 757-PV-ELE-DRW-AMET-014 A1 06 ENGINEERING FOR CONSTRUCTION
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
ZONA A
MV STATION
1200
A O&M BUILDING
CENTRO DE CONTROL
A
1960
PATH WIDTH 4,0m
CAMINO ANCHO 4,0 m
GATE ACCESS
PROPERTY BOUNDARIES
S-2
TRACKER CONTROL UNIT (TCU)
AC BOX
WEATHER STATION
1200
ESTACIONAMIENTOS TCU = TRACKER CONTROL UNIT (TCU)
1960
TCU-XX-YY UNIDAD DE CONTROL DEL TRACKER (TCU)
XX = ACBOX TO WHICH BELONGS
YY = TCU NUMBER /
AC.BOX-9
INV-9-2
INV-10-1
INV-9-1
DRAWING DATA / DATOS DE PROYECTO
SEC-3 Peak Power Watts Pmax (Wp) / 370
PR-L5 Open Circuit Voltage Voc (V) / 48.3 DRAWING DATA: LIRIO DE CAMPO
DATOS DE PROYECTO
Acceso a Planta Solar SEC-2 Short Circuit Current Isc (A) / Corriente de cortocircuito Isc (A) 9.83
Module Efficiency (%) / 19.0 Total Power : 2.990,19 kWp
Potencia total
Maximum Power Voltage Vmpp (V) / 39.7 Total Power AC : 2.700 kWac
SEC-1 Maximum Power Current Impp (A) / 9.33
Potenica total AC
Ratio AC/DC : 1,1074
Ratio AC/DC
Modules:
Strings:
4
INTERNAL PATH 24 strings (modules TSM-DD14A 365Wp)
255 strings (modules TSM-DD14A 370Wp)
29 modules per string
INV-6-1
AC.BOX-5
Estructure: SP160 NCLAVE GROUP 1500Vdc
Estructura
INV-5-2
INV-7-1
AC.BOX-6
INV-6-2
Configuration 1: 0 trackers 2Vx29
INV-8-2
SEC-3
INV-7-2
AC.BOX-7
2 strings per tracker
E 0 total strings
Configuration 2: 8 trackers 2Vx43+1
E
INV-8-1
AC.BOX-8
3 strings per tracker
INV-10-2
AC.BOX-12
AC.BOX-11
24 total strings
INV-11-2
INV-11-1
36 total strings
INVERSOR SUN2000-105KTL-H1 Configuration 2: 73 trackers 2Vx43+1
INV-12-1
INV-5-1
12 strings per inverter
Rated Output Voltage / 800 V, 3W + PE
Rated AC Grid Frequency / Frecuencia nominal 50/60 Hz 3 Inverters: Huawei SUN2000-105KTL-H1 (1500V).
11 strings per inverter
116 kW
3 Inverters: Huawei SUN2000-105KTL-H1 (1500V).
Max. Output Current / 84.6 A
10 strings per inverter
Power Factor Range / Rango de Factor de Potencia 0.8 LG...0.8 LD (AJUST.)
INV-4-2
1
Weight (with mounting plate) / Peso 79 kg
AC.BOX-4
AMBIENT CONDITIONS / CONDICIONES DE AMBIENTE 1 Transformer: 2.800 kVA
1 TRANSFORMADOR
Operating Temperature Range 0,8 / 13,2 kV
INV-4-1
Temperatura de funcionamiento 6,5 Ucc %
LEGEND / LEYENDA
STRING CABLE PV TOPSOLAR ZZ-F / H1X2X2-K 1.8 kVdc CU 1x6 mm2
Canal
NOTE: The contractor is responsible for making the necessary changes during the construction and generating the "As-Built" documentation, the preparation of the
Operation and Maintenance Manual of the plant, delivery of detailed work execution schedule and making any missing plan or documentation that is required.
Project:
LIRIO DE CAMPO SOLAR PARK 2,9902 Mwp
Subject:
H NAIAD PROJECTS H
Para ser impreso en formato A1 (840x597mm)
To be printed in A1 size (840x597mm)
Location:
Drawing:
Reference Documents / Documentos de Referencia GENERAL LAYOUT: ZONE A
757-PV-GEN-DRW-AMET-001
Drawn: Document Status: Scale: Sheet: Date:
757-PV-ELE-REP-AMET-007 CABLE SIZING AND ENERGY LOSSES CALCULATION LYNKA UR 1:500 2/11 2019/12/31
757-PV-ELE-DRW-AMET-010 LV-DC_AC SLD
757-PV-ELE-DRW-AMET-011 Overall SLD (DC_LV-AC_MV_OH) Size: Rev: Phase:
757-PV-CIV-DRW-AMET-015 Layout MV & LV Trench cross sections & details 757-PV-ELE-DRW-AMET-014 (1) A1 06 ENGINEERING FOR CONSTRUCTION
1 2 3 4 5 6 7 8 9 10 11 12
AC.BO
AC.BOX-
INV-8-1
AC.BOX-8
INV-10-2
AC.BOX-12
AC.BOX-11
INV-11-2
1 2 3 4 5 6 7 8 9 10 11 12
INV-11-1
INV-12-2
INV-12-1
PHOTOVOLTAIC MODULO TSM-DD14A 365W
LEGEND / LEYENDA
INV-5-1
TRACKER NCLAVE 365Wp 2Vx43+1 MODULES
MV STATION
1200
A O&M BUILDING
CENTRO DE CONTROL
A
1960
PATH WIDTH 4,0m
CAMINO ANCHO 4,0 m
PERIMETER FENCE
VALLADO PERIMETRAL
GATE ACCESS
PUERTA DE ACCESO
INV-4-2
AC.BOX-4
PROPERTY BOUNDARIES
INV-4-1
ANEMOMETER & NETWORK CONTROL UNIT (NCU)
AC BOX
INVERTER
INVERSOR
WEATHER STATION
1200
TCU = TRACKER CONTROL UNIT (TCU)
1960
TCU-XX-YY UNIDAD DE CONTROL DEL TRACKER (TCU)
XX = ACBOX TO WHICH BELONGS
YY = TCU NUMBER /
Track. = TRACKER
AA = TRACKER NUMBER /
Camin
D D
o inter
Open Circuit Voltage Voc (V) / 48.3 DRAWING DATA: LIRIO DE CAMPO
DATOS DE PROYECTO
Short Circuit Current Isc (A) / Corriente de cortocircuito Isc (A) 9.83
Module Efficiency (%) / 19.0 Total Power : 2.990,19 kWp
Potencia total
visorio
Maximum Power Voltage Vmpp (V) / 39.7 Total Power AC : 2.700 kWac
Potenica total AC
Maximum Power Current Impp (A) / 9.33
Ratio AC/DC : 1,1074
Ratio AC/DC
Modules:
Strings:
24 strings (modules TSM-DD14A 365Wp)
AC.BOX-1
AC.BOX-2
INV-3-1 AC.BOX-3 255 strings (modules TSM-DD14A 370Wp)
29 modules per string
INV-1-1 INV-1-2
INV-2-2 INV-2-1
Estructure: SP160 NCLAVE GROUP 1500Vdc
Estructura
Canal
MPPT Operating Voltage Range / 600... 1500 V 0,3 m (N-S)
LEGEND / LEYENDA
STRING CABLE PV TOPSOLAR ZZ-F / H1X2X2-K 1.8 kVdc CU 1x6 mm2
Cable String PV TOPSOLAR ZZ-F / H1X2X2-K1.8 kVdc Cu 1x6 mm2
Acceso a Planta Solar
ZONA B AC-LV CABLE AC BOX TO MV-STATION
AC-BT Cable AC Box a Transformador
AC-LV CABLE AC BOX TO MV-STATION
AC-BT Cable AC Box a Transformador
G G
AC-MT Cable Transformador a POI
NOTE: The contractor is responsible for making the necessary changes during the construction and generating the "As-Built" documentation, the preparation of the
Operation and Maintenance Manual of the plant, delivery of detailed work execution schedule and making any missing plan or documentation that is required.
na
l 10.7
Project:
LIRIO DE CAMPO SOLAR PARK 2,9902 Mwp
Subject:
H NAIAD PROJECTS H
Para ser impreso en formato A1 (840x597mm)
To be printed in A1 size (840x597mm)
Location:
Drawing:
Reference Documents / Documentos de Referencia GENERAL LAYOUT: ZONE B
Canal
757-PV-GEN-DRW-AMET-001
Drawn: Document Status: Scale: Sheet: Date:
757-PV-ELE-REP-AMET-007 CABLE SIZING AND ENERGY LOSSES CALCULATION LYNKA UR 1:500 3/11 2019/12/31
757-PV-ELE-DRW-AMET-010 LV-DC_AC SLD
757-PV-ELE-DRW-AMET-011 Overall SLD (DC_LV-AC_MV_OH) Size: Rev: Phase:
757-PV-CIV-DRW-AMET-015 Layout MV & LV Trench cross sections & details 757-PV-ELE-DRW-AMET-014 (2) A1 06 ENGINEERING FOR CONSTRUCTION
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8
6 cables
of 3 strings
Max. 10-15cm
A M.21 M.10 M.22 M.9 M.23 M.1 M.2 M.29 M.3 M.28 M.4 M.27 M.5 M.26 M.6 M.25 M.7 M.24 M.8 M.23 M.9 M.22 M.10 M.21 M.11 M.20 M.12 M.19 M.13 M.18 M.14 M.17 M.15 M.16 M.16 M.15 M.17 M.14 M.18 M.13 M.19 M.12 M.20 M.11 M.21 M.10 M.22 M.9
M.23
A
M.25 M.7 M.24 M.8 M.1 M.2 M.29 M.3 M.28 M.4 M.27 M.5 M.26 M.6 M.25 M.7 M.24 M.8 M.23 M.9 M.22 M.10 M.21 M.11 M.20 M.12 M.19 M.13 M.18 M.14 M.17 M.15 M.16 M.1 M.2 M.29 M.3 M.28 M.4 M.27 M.5 M.26 M.6 M.25 M.7 M.24 M.8
TRACKER 1 TRACKER 2
STRING CABLES INSTALLATION DETAIL 2Vx29 MODULES. BACK VIEW STRING CABLES DETAIL
DETALLE DE INSTALACION DE CABLES. VISTA TRASERA Ondaplast HF-UV, or similar STRING CABLES DETAIL / DETALLE DE CABLEADO DE STRING DETALLE DE CABLEADO DE STRING
4 cables
of 2 strings
M.1 M.2 M.29 M.3 M.28 M.4 M.27 M.5 M.26 M.6 M.25 M.7 M.24 M.8 M.23 M.9 M.22 M.10 M.21 M.11 M.20 M.12 M.19 M.13 M.18 M.14 M.17 M.15 M.16
M.1 M.2 M.29 M.3 M.28 M.4 M.27 M.5 M.26 M.6 M.25 M.7 M.24 M.8 M.23 M.9 M.22 M.10 M.21 M.11 M.20 M.12 M.19 M.13 M.18 M.14 M.17 M.15 M.16 FLANGES WILL BE INSTALLED AMONG MODULES
THE MAXIMUM ARROW OF
APPROXIMATELY EACH ONE METER
UNION BETWEEN STRING
MUST BE UV RESISTANT
SHOULD BE 10-15cm
APROXIMADAMENTE 1 POR METRO
DEBEN SER RESISTENTES A RAYOS UV
10-15cm
FEMALE CONNECTOR
TRACKER NCLAVE 2Vx29 MODULES
CONECTOR HEMBRA
C CONNECTOR
CONECTOR
C
CONNECTION BOX
MALE CONNECTOR
CABLE PV ZZ-F
CONECTOR MACHO
CABLE PV ZZ-F
CONNECTIONS DETAIL. SCALE 1/50 TRENCH LV STRING DETAIL. SCALE 1/50 CONDUCTORES PARA COMBINAR STRINGS
2 STRING: 29 SERIAL MODULES
DETALLE DE CONEXIONES. ESCALA 1/50 DETALLE DE ZANJAS BT STRING. ESCALA 1/50
1m* TCU
Antenna CONNECTION DETAIL 1 / CONNECTION DETAIL 2 / CONNECTION DETAIL 1 /
AC-BOX INV. Antena
Ondaplast HF-UV, or similar OUTPUT-ACBOX / SALIDA ACBOX INPUT-ACBOX / ENTRADA ACBOX OUTPUT-ACBOX / SALIDA ACBOX
D Ondaplast HF-UV, o equivalente
D
INVERTER
String cables Fire-resistant polyurethane sealing foam Fire-resistant polyurethane sealing foam Fire-resistant polyurethane sealing foam
Fire-resistant and UV resistant polyurethane sealing foam
Sand Sand
CONNECTION DETAIL 1 /
Project:
LIRIO DE CAMPO SOLAR PARK 2,992 Mwp
Subject:
Fire-resistant polyurethane sealing foam NAIAD PROJECTS
Para ser impreso en formato A2 (594x420mm)
To be printed in A2 size (594x420mm)
Location:
Drawing:
Reference Documents / Documentos de Referencia STRING CABLES INSTALLATION DETAILS
757-PV-GEN-DRW-AMET-001
Drawn: Document Status: Scale: Sheet: Date:
757-PV-ELE-REP-AMET-007 CABLE SIZING AND ENERGY LOSSES CALCULATION LYNKA UR V.SCALES 4/11 2019/12/31
F 757-PV-ELE-DRW-AMET-010
757-PV-ELE-DRW-AMET-011
LV-DC_AC SLD
Overall SLD (DC_LV-AC_MV_OH) Size: Rev: Phase: F
757-PV-CIV-DRW-AMET-015 Layout MV & LV Trench cross sections & details 757-PV-ELE-DRW-AMET-014 (3) A2 06 ENGINEERING FOR CONSTRUCTION
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
STRING CABLES INSTALLATION SCHEDULE. INV-1-2, INV-5-2, INV-6-1, INV-6-2, INV-7-1, INV-7-2, INV-8-1, INV-8-2, INV-10-2, INV-11-1, INV-11-2
ESQUEMA DE INSTALACION DE CABLES
1 STRING: 29 SERIAL MODULES
LEGEND / LEYENDA
TRACKER NCLAVE 2Vx29 MODULES
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1
CONNECTOR
CONECTOR
... ... ... ...
CONNECTION BOX
A CABLE PV ZZ-F
CABLE PV ZZ-F A
CABLE PV ZZ-F
CABLE PV ZZ-F
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1
1 STRING: 29 SERIAL MODULES
... ... ... ...
2 STRING: 29 SERIAL MODULES
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1
DC
STRING INVERTER (INV-XX-YY)
12 STRINGS
AC
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29
C ... ...
C
DC
STRING INVERTER (INV-XX-YY)
10 STRINGS
AC
D D
NOTE: The contractor is responsible for making the necessary changes during the construction and generating the "As-Built" documentation, the preparation of the
Operation and Maintenance Manual of the plant, delivery of detailed work execution schedule and making any missing plan or documentation that is required.
Project:
LIRIO DE CAMPO SOLAR PARK 2,992 Mwp
Subject:
NAIAD PROJECTS
Para ser impreso en formato A2 (594x420mm)
To be printed in A2 size (594x420mm)
Location:
Drawing:
Reference Documents / Documentos de Referencia STRING CABLES INSTALLATION DETAILS
757-PV-GEN-DRW-AMET-001
Drawn: Document Status: Scale: Sheet: Date:
757-PV-ELE-REP-AMET-007 CABLE SIZING AND ENERGY LOSSES CALCULATION LYNKA UR N/S 5/11 2019/12/31
F 757-PV-ELE-DRW-AMET-010
757-PV-ELE-DRW-AMET-011
LV-DC_AC SLD
Overall SLD (DC_LV-AC_MV_OH) Size: Rev: Phase: F
757-PV-CIV-DRW-AMET-015 Layout MV & LV Trench cross sections & details 757-PV-ELE-DRW-AMET-014 (4) A2 06 ENGINEERING FOR CONSTRUCTION
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
STRING CABLES INSTALLATION SCHEDULE. INV-1-2, INV-5-2, INV-6-1, INV-6-2, INV-7-1, INV-7-2, INV-8-1, INV-8-2, INV-10-2, INV-11-1, INV-11-2
ESQUEMA DE INSTALACION DE CABLES
1 STRING: 29 SERIAL MODULES
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1
A A
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1
DC
STRING INVERTER (INV-XX-YY)
12 STRINGS
AC
B STRING CABLES INSTALLATION SCHEDULE. INV-5-1
B
ESQUEMA DE INSTALACION DE CABLES
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1
C C
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29
... ...
DC
STRING INVERTER (INV-XX-YY)
10 STRINGS
AC
D D
NOTE: The contractor is responsible for making the necessary changes during the construction and generating the "As-Built" documentation, the preparation of the
Operation and Maintenance Manual of the plant, delivery of detailed work execution schedule and making any missing plan or documentation that is required.
LEGEND / LEYENDA
TRACKER NCLAVE 2Vx29 MODULES Project:
LIRIO DE CAMPO SOLAR PARK 2,992 Mwp
CONNECTOR
CONECTOR Subject:
CONNECTION BOX NAIAD PROJECTS
Para ser impreso en formato A2 (594x420mm)
To be printed in A2 size (594x420mm)
CABLE PV ZZ-F
CABLE PV ZZ-F Drawing:
1 STRING: 29 SERIAL MODULES Reference Documents / Documentos de Referencia STRING CABLES INSTALLATION DETAILS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
STRING CABLES INSTALLATION SCHEDULE. INV-1-1, INV-2-1, INV-3-1
ESQUEMA DE INSTALACION DE CABLES
1 STRING: 29 SERIAL MODULES
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1
CONNECTOR
CONECTOR
A CONNECTION BOX A
CABLE PV ZZ-F
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1 CABLE PV ZZ-F
CABLE PV ZZ-F
CABLE PV ZZ-F
... ... ... ...
1 STRING: 29 SERIAL MODULES
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1 29 28 27 5 4 3 2 1
C C
1 2 3 4 5 27 28 29 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1
DC
STRING INVERTER (INV-XX-YY)
11 STRINGS
D AC
D
NOTE: The contractor is responsible for making the necessary changes during the construction and generating the "As-Built" documentation, the preparation of the
Operation and Maintenance Manual of the plant, delivery of detailed work execution schedule and making any missing plan or documentation that is required.
Project:
LIRIO DE CAMPO SOLAR PARK 2,992 Mwp
Subject:
NAIAD PROJECTS
Para ser impreso en formato A2 (594x420mm)
To be printed in A2 size (594x420mm)
Location:
Drawing:
Reference Documents / Documentos de Referencia STRING CABLES INSTALLATION DETAILS
757-PV-GEN-DRW-AMET-001
Drawn: Document Status: Scale: Sheet: Date:
757-PV-ELE-REP-AMET-007 CABLE SIZING AND ENERGY LOSSES CALCULATION LYNKA UR N/S 7/11 2019/12/31
F 757-PV-ELE-DRW-AMET-010
757-PV-ELE-DRW-AMET-011
LV-DC_AC SLD
Overall SLD (DC_LV-AC_MV_OH) Size: Rev: Phase: F
757-PV-CIV-DRW-AMET-015 Layout MV & LV Trench cross sections & details 757-PV-ELE-DRW-AMET-014 (6) A2 06 ENGINEERING FOR CONSTRUCTION
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
STRING CABLES INSTALLATION SCHEDULE. INV-4-1 STRING CABLES INSTALLATION SCHEDULE. INV-4-2
ESQUEMA DE INSTALACION DE CABLES ESQUEMA DE INSTALACION DE CABLES
1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1
A 1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1
A
... ...
... ...
1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1
... ...
1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1
... ...
1 2 3 4 5 27 28 30 29 28 27 5 4 3 2 1
... ...
1 2 3 4 5 27 28 30 29 28 27 5 4 3 2 1
DC ... ...
STRING INVERTER (INV-XX-YY)
B (4 CIRCUITS FOR EACH TUBE)
10 STRINGS B
(4 CIRCUITOS POR TUBO) AC
1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1
... ...
1 2 3 4 5 27 28 30 29 28 27 5 4 3 2 1
... ...
1 2 3 4 5 27 28 30 30 28 27 5 4 3 2 1
... ...
DC
STRING INVERTER (INV-XX-YY)
(2 CIRCUITS FOR EACH TUBE)
10 STRINGS
(2 CIRCUITOS POR TUBO) AC
C 1 2 3 4 5 27 28 30 30 28 27 5 4 3 2 1 C
... ...
LEGEND / LEYENDA
D TRACKER NCLAVE 2Vx29 MODULES
D
CONNECTOR
CONECTOR
CONNECTION BOX
CABLE PV ZZ-F
CABLE PV ZZ-F
CABLE PV ZZ-F
CABLE PV ZZ-F
NOTE: The contractor is responsible for making the necessary changes during the construction and generating the "As-Built" documentation, the preparation of the
Operation and Maintenance Manual of the plant, delivery of detailed work execution schedule and making any missing plan or documentation that is required.
Project:
LIRIO DE CAMPO SOLAR PARK 2,992 Mwp
Subject:
NAIAD PROJECTS
Para ser impreso en formato A2 (594x420mm)
To be printed in A2 size (594x420mm)
Location:
Drawing:
Reference Documents / Documentos de Referencia STRING CABLES INSTALLATION DETAILS
757-PV-GEN-DRW-AMET-001
Drawn: Document Status: Scale: Sheet: Date:
757-PV-ELE-REP-AMET-007 CABLE SIZING AND ENERGY LOSSES CALCULATION LYNKA UR N/S 8/11 2019/12/31
F 757-PV-ELE-DRW-AMET-010
757-PV-ELE-DRW-AMET-011
LV-DC_AC SLD
Overall SLD (DC_LV-AC_MV_OH) Size: Rev: Phase: F
757-PV-CIV-DRW-AMET-015 Layout MV & LV Trench cross sections & details 757-PV-ELE-DRW-AMET-014 (7) A2 06 ENGINEERING FOR CONSTRUCTION
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
STRING CABLES INSTALLATION SCHEDULE. INV-12-2
ESQUEMA DE INSTALACION DE CABLES
1 STRING: 29 SERIAL MODULES
1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1
A ... ... A
1 2 3 4 5 27 28 29 29 28 27 5 4 3 2 1
... ...
1 2 3 4 5 27 28 30 29 28 27 5 4 3 2 1
... ...
B B
1 2 3 4 5 27 28 30 29 28 27 5 4 3 2 1
... ...
1 2 3 4 5 27 28 30
...
C C
DC
(3 CIRCUITS FOR EACH TUBE) STRING INVERTER (INV-XX-YY)
12 STRINGS
(3 CIRCUITOS POR TUBO) AC
30 28 27 5 4 3 2 1
1 2 3 4 5 27 28 30 ...
...
D D
1 2 3 4 5 27 28 30
...
NOTE: The contractor is responsible for making the necessary changes during the construction and generating the "As-Built" documentation, the preparation of the
Operation and Maintenance Manual of the plant, delivery of detailed work execution schedule and making any missing plan or documentation that is required.
CONNECTOR
CONECTOR
CONNECTION BOX
CABLE PV ZZ-F
CABLE PV ZZ-F
Project:
CABLE PV ZZ-F LIRIO DE CAMPO SOLAR PARK 2,992 Mwp
CABLE PV ZZ-F
Location:
Drawing:
Reference Documents / Documentos de Referencia STRING CABLES INSTALLATION DETAILS
757-PV-GEN-DRW-AMET-001
Drawn: Document Status: Scale: Sheet: Date:
757-PV-ELE-REP-AMET-007 CABLE SIZING AND ENERGY LOSSES CALCULATION LYNKA UR N/S 9/11 2019/12/31
F 757-PV-ELE-DRW-AMET-010
757-PV-ELE-DRW-AMET-011
LV-DC_AC SLD
Overall SLD (DC_LV-AC_MV_OH) Size: Rev: Phase: F
757-PV-CIV-DRW-AMET-015 Layout MV & LV Trench cross sections & details 757-PV-ELE-DRW-AMET-014 (8) A2 06 ENGINEERING FOR CONSTRUCTION
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
0.60
Poste de soporte auxiliar*
Poste de soporte auxiliar*
0.13
0.60
0.23
Inverted Beam for
0.23
A Installation
Barra invertida para
A
1.00
instalacion
1.00
0.13 0.56 0.50 1.08 0.14
0.67
0.21 1.08 0.21
0.50
0.50
0.67
0.67
Ground level
Nivel del suelo
Ground level
2.40 Nivel del suelo
U-shaped steel
Inverted beam for installation
1.00
U-acero galvanizado
1.50
1.00
Barra invertida para instalacion
U-shaped steel
Inverter beam for intallation
0.60
U-acero galvanizado
Barra invertida para instalacion
0.60
0.23
0.23
B B
0.13 0.56 0.50 1.08 0.14
0.21 1.08 0.21
0.50
0.67
2.40
1.50
0.05
0.05
0.14 2.26 0.14 0.05
0.05 0.14 1.36 0.14
Remark: Available from the rack supplier
Nota: disponible desde el proveedor
Remark: Available from the rack supplier
Nota: disponible desde el proveedor
C C
0.60
0.56
Inverted Beam for Installation Inverted Beam for 0.52 0.21
Barra invertida para instalacion Installation
Barra invertida para
1.00
instalacion
1.08 0.15
0.50 0.56 0.50
0.67
0.50
0.50
Ground level
0.30
0.70
0.23
Nivel del suelo
D 2.00 2.00 D
U-shaped steel
Inverted beam for installation
1.00
U-acero galvanizado
Barra invertida para instalacion
0.60
0.02
0.02
0.04
0.14 1.08 0.50 0.56 0.50 1.08 0.14 1.05
NOTE: The contractor is responsible for making the necessary changes during the construction and generating the "As-Built" documentation, the preparation of the
Operation and Maintenance Manual of the plant, delivery of detailed work execution schedule and making any missing plan or documentation that is required.
0.50
0.42
0.23
6 2019/12/31 LYNK LYNK
E 0.01
5 2019/12/10 LYNK LYNK E
2.00 2.00 4 2019/11/28 LYNK LYNK
0.02
0.81 Rev. Date (YYYY/MM/DD) Changes Drawn Eng.
0.87
0.97
0.05 0.05
0.14 1.93 1.93 0.14
Project:
Remark: Available from the rack supplier LIRIO DE CAMPO SOLAR PARK 2,992 Mwp
Nota: disponible desde el proveedor
Subject:
NAIAD PROJECTS
Para ser impreso en formato A2 (594x420mm)
To be printed in A2 size (594x420mm)
Location:
Drawing:
Reference Documents / Documentos de Referencia INVERTER AND AC-BOXES INSTALLATION DETAILS
757-PV-GEN-DRW-AMET-001
Drawn: Document Status: Scale: Sheet: Date:
757-PV-ELE-REP-AMET-007 CABLE SIZING AND ENERGY LOSSES CALCULATION LYNKA UR V.SCALES 10/11 2019/12/31
F 757-PV-ELE-DRW-AMET-010
757-PV-ELE-DRW-AMET-011
LV-DC_AC SLD
Overall SLD (DC_LV-AC_MV_OH) Size: Rev: Phase: F
757-PV-CIV-DRW-AMET-015 Layout MV & LV Trench cross sections & details A2 06 ENGINEERING FOR CONSTRUCTION
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
9
3.9
3.80
0.13
0.4 0.4
2 4
2.00
1.99
1.99
1.00
B B
0.67
0.50
0.50
C C
D D
NOTE: The contractor is responsible for making the necessary changes during the construction and generating the "As-Built" documentation, the preparation of the
Operation and Maintenance Manual of the plant, delivery of detailed work execution schedule and making any missing plan or documentation that is required.
Project:
LIRIO DE CAMPO SOLAR PARK 2,992 Mwp
Subject:
NAIAD PROJECTS
Para ser impreso en formato A2 (594x420mm)
To be printed in A2 size (594x420mm)
Location:
Drawing:
Reference Documents / Documentos de Referencia INVERTER AND AC-BOXES INSTALLATION DETAILS
757-PV-GEN-DRW-AMET-001
Drawn: Document Status: Scale: Sheet: Date:
757-PV-ELE-REP-AMET-007 CABLE SIZING AND ENERGY LOSSES CALCULATION LYNKA UR N/S 11/11 2019/12/31
F 757-PV-ELE-DRW-AMET-010
757-PV-ELE-DRW-AMET-011
LV-DC_AC SLD
Overall SLD (DC_LV-AC_MV_OH) Size: Rev: Phase: F
757-PV-CIV-DRW-AMET-015 Layout MV & LV Trench cross sections & details 757-PV-ELE-DRW-AMET-014 (10) A2 06 ENGINEERING FOR CONSTRUCTION
1 2 3 4 5 6 7 8