You are on page 1of 3

Twiggs Call Center Agency

WORKPLACE SAFETY
REPORT

Prepared by
Kevin Don
kevindon@twiggs.com
September 10, 2025

Create your own Proposal for Free on Template.net


Introduction

Twiggs Call Center Agency prepared this safety report for the ongoing renovation and inspection of the
establishment. The inspectors and the construction team reported a gas leak on September 5, 2025, near the
pantry rooms.

Objectives

The objectives of this weekly safety report were:


1. Determine the cause of the leak
2. Agree on the actions to address the gas leak and to avoid further incidents during and after the renovation
and inspection.

Incident Information

Ms. Jennifer Linn, the building safety o cer,  was informed by the construction workers about the evident smell
of gas coming from the pantry rooms. Fortunately, there was no one using the rooms, and no one was using
items that caused a re when the gas leak was detected.

Methodology

The team gathered facts about the incident from interviewed employees in the agency and supervisors. Copies of
the safety protocols, currently followed by the workers, were also collected to conduct the investigation.  

Create your own Proposal for Free on Template.net


Findings

1. The pipes intended for the small cooking range in the pantry were not tted or may have been moved during
the renovation.
2. An employee of the agency used the range but failed to notice the leak.

Conclusion

The stated incident happened due to the failure of the safety o cer to remind the workers about the connections
of the pipers and other elements of the establishment.

Recommendations

1. The pipes should be moved to a more stable and higher place to avoid having the same incident occur again.
2. There needs to be a security guard roving the pantry rooms to check on the appliances and the conditions of
the items in the rooms.

Create your own Proposal for Free on Template.net

You might also like